← Back
Old law tenement
106 AVENUE B
MANHATTAN · BIN 1005095
💬 Discuss this project
1900Year Built
5Stories
C4Building Class
R7AZoning
7,810 sfGross Floor Area
10Units
Rent Stabilized39 Open Violations 37 unresolved · 2 paperwork only ▸
Old law tenement · Owner of record: NYC AVE B HOLDINGS LLC · 1,919 sf lot · 4.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM303/22/2026
NYC AVE B HOLDINGS LLC403/22/2026
106 AVENUE B OWNER LLC.103/22/2026
GREENETREE MANAGEMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/13/2025$2.0M—— → —$256/sf building
05/18/2018$3.1M—— → —$397/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI506/12/2026
CHUN ENGINEERING CONSULTANT PLLC106/04/2025
SUCCESS BEST DESIGN, INC311/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MG DECORATIONS LTDGeneral Contractor303/21/2026
ASHLEY, ANTHONYElectrical103/21/2026
STEWART, DUDLEYElectrical103/21/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/12/2026
DAL H CHUN ENGINEER PC1972106/04/2025
Building Lifecycle
All (113)Filed (9)Permit Issued (3)Signed Off (1)Violation (60)Objection (21)Special Inspection (19)
08/11/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (ECB, open)
Construction
07/13/2026
Objection raised — Scope
06/16/2026
Objection raised — Other
06/12/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01342072-P1
06/12/2026
Filed — Alteration
RESOLVE ECB VIOLATION: 39146241X AND 39146239R; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN.REPLACE GLASS STOREFRONT AND ROLLING GATE AS P
M01272492-P1
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/29/2026
Violation issued (HPD, open)
A
03/24/2026
Permit issued — Plumbing
M01272492-S1-PL
02/18/2026
Permit issued — General Construction
M01342072-I1-GC
01/28/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/22/2026
Objection raised — Cost
01/22/2026
Objection raised — Scope
01/05/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01342072-I1
01/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
01/05/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/19/2025
Violation issued (ECB, closed)
Unknown
11/17/2025
Violation issued (HPD, open)
I
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Plumbing
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Scope
10/10/2025
Violation issued (HPD, closed)
C
09/09/2025
Objection raised — Cost
09/09/2025
Objection raised — Cost
09/08/2025
Signed off — Alteration
INSTALL NEW STOREFRONT TO ADDRESS ECB VIOLATION # 39146241X. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01222632-I1
09/08/2025
Objection raised — Admin
09/08/2025
Objection raised — Scope
08/29/2025
Permit issued — General Construction
M01222632-I1-GC
08/27/2025
Filed — Alteration
RESOLVE ECB VIOLATION: 39146241X AND 39146239R; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN.REPLACE GLASS STOREFRONT AND ROLLING GATE AS P
M01272492-I1
08/27/2025
Filed — Alteration
RESOLVE ECB VIOLATION: 39146241X AND 39146239R; RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. RELOCATE ADA RESTROOM AS PER PLAN.REPLACE GLASS STOREFRONT AND ROLLING GATE AS P
M01272492-S1
08/27/2025
Violation issued (HPD, closed)
A
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/27/2025
Special inspection requirement — Energy Code Compliance Inspections
08/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/19/2025
Violation issued (HPD, open)
B
08/19/2025
Violation issued (HPD, closed)
B
08/19/2025
Violation issued (HPD, closed)
C
08/19/2025
Violation issued (HPD, closed)
B
08/19/2025
Violation issued (HPD, closed)
C
08/19/2025
Violation issued (HPD, open)
C
08/19/2025
Violation issued (HPD, closed)
C
08/19/2025
Violation issued (HPD, closed)
C
08/19/2025
Violation issued (HPD, closed)
C
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG03/24/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC02/18/2026
DOB NOWGeneral ConstructionSigned-offMG DECORATIONS LTD08/29/2025
BISOTISSUEDCHANG MUN09/10/2004
2 projects · most recent 06/12/2026
Water/Sanitary
FiledStatusContractorScope
06/12/2026Permit IssuedJOHN FITZGERALD PLBG &HTGWater/Sanitary
10/07/2024——Water/Sanitary
2 projects · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026Permit IssuedBLZ ELECTRIC INC.General Wiring
05/13/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/11/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/11/2026FinalFARHAD BASSIRI-TEHRANIprogress
06/11/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/11/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/11/2026Tenant Protection Plan Compliance—special
06/11/2026Tenant Protection Plan Compliance—special
01/05/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
01/05/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
01/05/2026Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
01/05/2026FinalFARHAD BASSIRI-TEHRANIprogress
01/05/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/27/2025Fire-Resistant Penetrations and Joints—special
08/27/2025Tenant Protection Plan Compliance—special
08/27/2025Energy Code Compliance Inspections—progress
08/27/2025Fire-Resistance Rated Construction—progress
08/15/2025Final—progress
11/05/2024FinalMU YENprogress
10/02/2024Energy Code Compliance InspectionsMU YENprogress
09/30/2024FinalMU YENprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026M01120877-I1Request digital key ↗
08/26/2026M01119380-I1Request digital key ↗
08/25/2026M01137393-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026M01272492-I1Open ↗
08/21/2026M01272492-S1Open ↗
08/21/2026M01272492-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01342072-P1Open ↗
09/01/2026M01342072-I1Open ↗
08/22/2026M01137393-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01342072-P1Open ↗
09/01/2026M01342072-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01120877-I1Open ↗
08/13/2026M01137393-I1Open ↗
08/13/2026M01119380-I1Open ↗