← Back
Large suburban residence
6 GROVE COURT
MANHATTAN · BIN 1009883
💬 Discuss this project
1854Year Built
3Stories
A3Building Class
R6Zoning
1,152 sfGross Floor Area
1Units
Large suburban residence · 408 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Roof2p · 1 filing · 20 docs
Floor 35p · 2 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar11p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIRIS COOMBS ARCHITECTURE, PLLC509/08/2025
NEW AIR SOLUTION INC.103/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
H J BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AUROUS CONSTRUCTION COLL*General Contractor407/08/2026
MR. AIR NYC CORPGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHARD H. BALSER ENGINEE3028509/08/2025
NEW AIR SOLUTION INC8418103/15/2025
Building Lifecycle
All (38)Filed (6)Permit Issued (4)Signed Off (2)Inspection (8)Objection (2)Special Inspection (16)
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
10/09/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/30/2025
Signed off — Alteration
INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01145708-I1
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
09/19/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/08/2025
Filed — Alteration
PLUMBING FIXTURES INSTALLATION AND MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01146079-P1
08/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2025
Permit issued — General Construction
M01096810-I1-GC
07/16/2025
Objection resolved — Addressed
07/03/2025
Special inspection requirement — Final
ANN COOMBS
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
06/30/2025
Objection raised — Cost
06/27/2025
Signed off — Alteration
INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01145708-S1
06/25/2025
Filed — Alteration CO
CONVERSION OF ONE-FAMILY RESIDENCE FROM ONE FAMILY UNIT TO TWO FAMILY UNITS AS PER PLANS FILED HEREWITH. ALL CONSTRUCTION WORK WITH RENOVATION WAS APPROVED UNDER M01145708-I1
M01096810-I1
06/23/2025
Filed — Alteration
INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01145708-P1
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
06/17/2025
Special inspection requirement — Final
ANN COOMBS
03/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/25/2025
Permit issued — Mechanical Systems
M01145708-S1-MS
03/15/2025
Filed — Alteration
INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01145708-S1
03/14/2025
Special inspection requirement — Permanent certificate
Tianchen Hu
03/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
03/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
03/14/2025
Special inspection requirement — Maintenance information
Tianchen Hu
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
03/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
02/25/2025
Special inspection requirement — Mechanical Systems
Tianchen Hu
02/25/2025
Special inspection requirement — Final
Tianchen Hu
02/04/2025
Permit issued — General Construction
M01145708-I1-GC
01/17/2025
Permit issued — Plumbing
M01146079-I1-PL
11/22/2024
Filed — Alteration
INTERIOR RENOVATION OF ONE FAMILY RESIDENCE INCLUDING PARTITION WORK AND EXTERIOR WALL PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01145708-I1
11/22/2024
Filed — Alteration
PLUMBING FIXTURES INSTALLATION AND MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01146079-I1
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAUROUS CONSTRUCTION COLL*07/28/2025
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP03/25/2025
DOB NOWGeneral ConstructionSigned-offAUROUS CONSTRUCTION COLL*02/04/2025
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG01/17/2025
1 project · most recent 09/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/08/2025Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
1 project · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/09/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/24/2025Fire-Resistant Penetrations and JointsBalser Richardspecial
07/03/2025FinalANN COOMBSprogress
07/03/2025Fire-Resistant Penetrations and JointsBalser Richardspecial
06/17/2025Fire-Resistant Penetrations and JointsBalser Richardspecial
06/17/2025FinalANN COOMBSprogress
03/14/2025Permanent certificateTianchen Huenergy_progress
03/14/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
03/14/2025Tenant Protection Plan ComplianceTianchen Huspecial
03/14/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
03/14/2025Energy Code Compliance InspectionsTianchen Huprogress
03/14/2025Maintenance informationTianchen Huenergy_progress
03/14/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
03/14/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
02/25/2025Mechanical SystemsTianchen Huspecial
02/25/2025FinalTianchen Huprogress
08/20/2024Fire-Resistant Penetrations and JointsBalser Richardspecial
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026M01145708-S1Request digital key ↗
08/25/2026M01145708-P1Request digital key ↗
08/25/2026M01145708-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/25/2026M01145708-I1Open ↗
08/21/2026M01146079-I1Open ↗
08/13/2026M01145708-P1Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01096810-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026M01145708-I1Open ↗
08/23/2026M01096810-I1Open ↗
08/21/2026M01146079-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/17/2026M01145708-S1Open ↗
08/31/2026M01096810-I1Open ↗
08/31/2026M01145708-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/17/2026M01145708-S1Open ↗
09/17/2026M01145708-S1Open ↗
08/31/2026M01145708-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Sign Off1
08/13/2026M01096810-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M01096810-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M01096810-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01096810-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026M01145708-I1Open ↗
08/23/2026M01096810-I1Open ↗
08/21/2026M01146079-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents6
▸DOB NOWProof of Historic Building5
08/25/2026M01145708-I1Open ↗
08/21/2026M01146079-I1Open ↗
08/13/2026M01146079-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification1
08/23/2026M01096810-I1Open ↗