← Back
Other private school
227 WEST 13 STREET
MANHATTAN · BIN 1011121
💬 Discuss this project
1895Year Built
6Stories
W8Building Class
R6Zoning
18,720 sfGross Floor Area
5Units
14 Open Violations 10 unresolved · 4 paperwork only ▸
Other private school · 3,267 sf lot · 5.73 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 15p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIMO ENGINEERING108/26/2024
KARACOBAN ENGINEERING PC203/30/2022
TAHIR DEMIRCIOGLU ARCHITECT PLLC103/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA603/21/2026
DIMO ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN CONCRETE LLCGeneral Contractor303/21/2026
MICHAL OKUNIEWSKIElectrical103/21/2026
NORBERT GERSHKOVICHElectrical103/21/2026
TOLLOCAN SHEET METAL INCGeneral Contractor107/08/2026
AJC PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269303/30/2022
Building Lifecycle
All (60)Filed (4)Permit Issued (3)Signed Off (1)Violation (35)Inspection (2)Special Inspection (15)
08/26/2024
Filed — Alteration
M01071352-I1
07/24/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/24/2024
Special inspection requirement — Final
GEORGE GUTTMANN
04/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/01/2024
Violation issued (ECB, open)
Construction
02/01/2024
Violation issued (ECB, open)
Construction
02/01/2024
Violation issued (ECB, open)
Construction
02/01/2024
Violation issued (ECB, open)
Construction
02/01/2024
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Signed off — Alteration
TENANT FITOUT FOR A MINOR INTERIOR RENOVATION OF RETAIL SPACE ON THE FIRST FLOOR PROPOSING NEW PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.FILED IN CONJUNCTION WITH PLUMBING WORK TYPE JOB #M00689483, AND MECHANICAL WORK TYPE JOB # M00689467.
M00690729-I1
08/17/2022
Permit issued — Mechanical Systems
M00689467-I1-MS
05/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2022
Permit issued — Plumbing
M00689483-I1-PL
04/01/2022
Permit issued — General Construction
M00690729-I1-GC
03/30/2022
Filed — Alteration
TENANT FITOUT FOR A MINOR INTERIOR RENOVATION OF RETAIL SPACE ON THE FIRST FLOOR PROPOSING NEW PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.FILED IN CONJUNCTION WITH PLUMBING WORK TYPE JOB #M00689483, AND MECHANICAL WORK TYPE JOB # M00689467.
M00690729-I1
03/30/2022
Filed — Alteration
INSTALLATION OF AIR COOLED AIR CONDITIONING SYSTEMS, FRESH AIR INTAKE FAN AND TOILET EXHAUST SYSTEM ALONG WITH ASSOCIATED DUCTWORK, INSULATION AND PIPING.
M00689467-I1
03/30/2022
Filed — Alteration
INSTALLATION OF NEW WATER HEATER, LAVATORY, MOP SINK, PANTRY SINK AND WATER DISPENSER/DRINKING FOUNTAIN, WITH AN ELECTRIC HOT WATER HEATER OF 10 GALLON STORAGE CAPACITY
M00689483-I1
03/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHANN VELEZ
03/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHANN VELEZ
03/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHANN VELEZ
03/26/2022
Special inspection requirement — Shutoff dampers
JOHANN VELEZ
03/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
03/26/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHANN VELEZ
03/26/2022
Special inspection requirement — Maintenance information
JOHANN VELEZ
03/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
03/11/2022
Special inspection requirement — Lighting controls
JOHANN VELEZ
03/11/2022
Special inspection requirement — Interior lighting power
JOHANN VELEZ
03/02/2022
Special inspection requirement — Final
JOHANN VELEZ
03/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
03/01/2022
Special inspection requirement — Final
JOHANN VELEZ
03/01/2022
Special inspection requirement — Mechanical Systems
JOHANN VELEZ
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2017
Violation issued (ECB, closed)
Unknown
10/16/2017
Violation issued (ECB, closed)
Unknown
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/26/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/11/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2004
Violation issued (ECB, closed)
Elevators
12/16/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/28/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/1999
Violation issued (ECB, closed)
Elevators
05/13/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/09/1988
Violation issued (ECB, closed)
Construction
07/31/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/31/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTOLLOCAN SHEET METAL INC08/17/2022
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP04/12/2022
DOB NOWGeneral ConstructionSigned-offMANHATTAN CONCRETE LLC04/01/2022
BISFPISSUEDALIIED FIRE CONTROL10/17/2007
BISFBISSUEDIRVING VALVALISTSKY08/18/2003
BISMHISSUEDST FRANICS CONSTR. CO04/05/1996
BIS—ISSUEDST. FRANCIS CONSTR. CO.08/03/1995
BISEQISSUEDATLANTIC SCAFFOLDING11/15/1993
1 project · most recent 03/30/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2022Permit IssuedTOLLOCAN SHEET METAL INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Johnson Controls DSH048C 50,500 BTU · Condensing Unit ×4
Heating
Ventilation
Greenheck CSP-A200 150 CFM · Exhaust Fan ×1
CSP-A390VG 300 CFM · Ahu ×1
1 project · most recent 03/30/2022
Water/Sanitary
FiledStatusContractorScope
03/30/2022Signed-offAJC PLUMBING & HTG CORPWater/Sanitary
2 projects · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteZIN ELECTRICAL, INCGeneral Wiring
03/23/2022Permit IssuedSMART ELECTRIC SERVICESGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/24/2024FinalGEORGE GUTTMANNprogress
03/26/2022HVAC-R and service water heating equipmentJOHANN VELEZenergy_progress
03/26/2022HVAC-R and service water heating system controlsJOHANN VELEZenergy_progress
03/26/2022HVAC-R and service water piping design and insulationJOHANN VELEZenergy_progress
03/26/2022Shutoff dampersJOHANN VELEZenergy_progress
03/26/2022Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
03/26/2022Energy Code Compliance InspectionsJOHANN VELEZprogress
03/26/2022Maintenance informationJOHANN VELEZenergy_progress
03/25/2022Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
03/11/2022Lighting controlsJOHANN VELEZenergy_progress
03/11/2022Interior lighting powerJOHANN VELEZenergy_progress
03/02/2022FinalJOHANN VELEZprogress
03/02/2022Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
03/01/2022FinalJOHANN VELEZprogress
03/01/2022Mechanical SystemsJOHANN VELEZspecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00690729-I1Request digital key ↗
09/02/2026M00689483-I1Request digital key ↗
09/02/2026M00689467-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
09/02/2026M00690729-I1Open ↗
08/13/2026M01071352-I1Open ↗
08/13/2026M00689483-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M01071352-I1Open ↗
08/25/2026M00689467-I1Open ↗
08/25/2026M00689467-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026M00690729-I1Open ↗
08/13/2026M01071352-I1Open ↗
08/13/2026M00689467-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00689483-I1Open ↗
08/25/2026M00689467-I1Open ↗
08/25/2026M00690729-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00690729-I1Open ↗
08/13/2026M00689483-I1Open ↗
08/13/2026M01071352-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00690729-I1Open ↗