← Back
Over six families without stores
106 CONVENT AVENUE
MANHATTAN · BIN 1059630
💬 Discuss this project
1901Year Built
5Stories
C1Building Class
R7AZoning
24,105 sfGross Floor Area
34Units
Rent Stabilized72 Open Violations ▸
Over six families without stores · Owner of record: 106-108 CONVENT BCR, LLC · 7,200 sf lot · 3.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
106-108 CONVENT BCR, LLC103/22/2026
TORRES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/28/2015$9.0M—— → —$373/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS211/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER 2 PLBG & HTG INCPlumbing203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474211/06/2023
Building Lifecycle
All (69)Filed (2)Violation (60)Objection (4)Special Inspection (3)
07/14/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (HPD, open)
A
07/14/2026
Violation issued (HPD, open)
A
07/14/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, closed)
B
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, closed)
B
04/14/2026
Violation issued (HPD, open)
B
04/14/2026
Violation issued (HPD, closed)
B
04/14/2026
Violation issued (HPD, closed)
C
04/14/2026
Violation issued (HPD, open)
A
09/10/2024
Violation issued (HPD, open)
B
09/10/2024
Violation issued (HPD, open)
C
09/10/2024
Violation issued (HPD, open)
C
09/10/2024
Violation issued (HPD, open)
B
07/31/2024
Violation issued (HPD, closed)
C
06/12/2024
Violation issued (HPD, open)
A
03/28/2024
Violation issued (HPD, closed)
C
03/28/2024
Violation issued (HPD, open)
B
03/28/2024
Violation issued (HPD, open)
A
03/19/2024
Violation issued (HPD, open)
C
03/13/2024
Violation issued (HPD, open)
C
03/13/2024
Violation issued (HPD, open)
C
03/13/2024
Violation issued (HPD, closed)
C
03/13/2024
Violation issued (HPD, open)
C
11/06/2023
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK IN APARTMENTS 30 & 34 IN CONJNCTION WITH GC APPLICATION # M00924439-I1. SCOPE OF WORK TO INCLUDE THE RELOCATION, REPLACEMENT & INSTALLATION OF NEW PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00924439-S1
11/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
10/30/2023
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
10/21/2023
Violation issued (HPD, open)
C
10/09/2023
Objection resolved — Addressed
10/09/2023
Objection resolved — Addressed
10/06/2023
Objection raised — Scope
10/06/2023
Objection raised — Admin
09/25/2023
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK IN APARTMENTS 30 & 34 IN CONJNCTION WITH GC APPLICATION # M00924439-I1. SCOPE OF WORK TO INCLUDE THE RELOCATION, REPLACEMENT & INSTALLATION OF NEW PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00924439-I1
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, closed)
B
09/11/2023
Violation issued (HPD, closed)
B
09/07/2023
Violation issued (HPD, closed)
B
09/07/2023
Violation issued (HPD, closed)
A
09/07/2023
Violation issued (HPD, closed)
B
07/10/2023
Violation issued (HPD, open)
B
07/10/2023
Violation issued (HPD, open)
B
07/10/2023
Violation issued (HPD, open)
B
07/10/2023
Violation issued (HPD, open)
B
06/14/2023
Violation issued (HPD, open)
B
06/14/2023
Violation issued (HPD, open)
B
06/14/2023
Violation issued (HPD, open)
B
06/14/2023
Violation issued (HPD, open)
B
06/14/2023
Violation issued (HPD, open)
B
04/30/2023
Violation issued (HPD, open)
B
04/30/2023
Violation issued (HPD, open)
B
04/30/2023
Violation issued (HPD, open)
B
02/28/2023
Violation issued (HPD, closed)
C
01/22/2023
Violation issued (HPD, open)
B
01/22/2023
Violation issued (HPD, open)
A
11/13/2022
Violation issued (HPD, closed)
C
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFBISSUEDROCKWAY FUEL OIL CORP09/11/2003
1 project · most recent 11/06/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/06/2023——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/06/2023Tenant Protection Plan Compliance—special
10/30/2023Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
10/30/2023Energy Code Compliance InspectionsPHILIP TOSCANOprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026M00924439-S1Request digital key ↗
08/29/2026M00924439-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026M00924439-S1Open ↗
08/29/2026M00924439-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00924439-S1Open ↗
08/29/2026M00924439-I1Open ↗