← Back
Parks / recreation facility
MORNINGSIDE DRIVE
MANHATTAN · BIN 1811450
💬 Discuss this project
1900Year Built
1Stories
Q1Building Class
PARKZoning
2,865 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 1,302,350 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONST AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRAVO GROUP404/30/2025
FMO ENGINEERING PC107/21/2023
GEORGE RANALLI, ARCHITECT105/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PENINSULA CONSTRUCTION INGeneral Contractor1107/08/2026
WILFRED JEFFREYElectrical203/21/2026
YOUNG CHOEElectrical103/21/2026
AVON PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WINTON GROUP ARCHITECTURE4343204/30/2025
FMO ENGINEERING PC1798107/21/2023
GEORGE RANALLI, ARCHITECT992107/21/2023
Building Lifecycle
All (51)Filed (6)Permit Issued (6)Signed Off (4)Inspection (3)Objection (20)Special Inspection (12)
03/16/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S1
02/19/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S2
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
05/16/2025
Objection raised — Scope
05/06/2025
Objection raised — Admin
04/30/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-P1
04/29/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-P2
04/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/17/2025
Special inspection requirement — Final
George Ranalli
04/17/2025
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
04/16/2025
Permit issued — Mechanical Systems
M00856396-S2-MS
04/04/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S3
03/25/2025
Permit issued — Structural
M00856396-S3-ST
03/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-I1
01/22/2025
Permit issued — General Construction
M00856396-I1-GC
06/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2024
Permit issued — General Construction
M00856396-I1-GC
02/08/2024
Permit issued — General Construction
M00856396-I1-GC
01/25/2024
Permit issued — Plumbing
M00856396-S1-PL
08/29/2023
Objection raised — Inspections
08/29/2023
Objection resolved — Addressed
08/29/2023
Objection raised — Other
08/29/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/22/2023
Objection raised — Scope
08/22/2023
Objection raised — Scope
08/08/2023
Objection resolved — Addressed
08/08/2023
Objection resolved — Addressed
08/07/2023
Objection raised — Inspections
08/07/2023
Objection raised — Structural
08/01/2023
Objection raised — Scope
08/01/2023
Objection resolved — Addressed
07/21/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S3
07/21/2023
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Cold-Formed Steel
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
07/21/2023
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
George Ranalli
07/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
FRANCESCO MO
07/19/2023
Special inspection requirement — Final
FRANCESCO MO
07/18/2023
Objection raised — Scope
07/18/2023
Objection resolved — Addressed
05/23/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S2
05/22/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-S1
05/22/2023
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH CONSTRUCTION OF A KIOSK ON THE TERRACE OF THE SERVICE BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856396-I1
04/06/2023
Special inspection requirement — Final
George Ranalli
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPENINSULA CONSTRUCTION IN04/16/2025
DOB NOWStructuralSigned-offPENINSULA CONSTRUCTION IN03/25/2025
DOB NOWGeneral ConstructionSigned-offPENINSULA CONSTRUCTION IN01/22/2025
DOB NOWGeneral ConstructionSigned-offPENINSULA CONSTRUCTION IN05/13/2024
DOB NOWGeneral ConstructionSigned-offPENINSULA CONSTRUCTION IN02/08/2024
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC01/25/2024
BISOTISSUEDU.A. CONSTRUCTION CORP12/17/2007
BISPLISSUEDTMS PLMBG & HTG CORP05/10/2002
BISOTISSUEDCAMBRIA CONSTRUCTION CORP04/22/2002
BISEQISSUEDUNITED HOISTING CO._INC.04/22/1994
1 project · most recent 05/21/2025
General Wiring
FiledStatusContractorScope
05/21/2025CompleteY.S ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/17/2025FinalGeorge Ranalliprogress
04/17/2025Mechanical SystemsVladimir Kaushanskyspecial
07/21/2023Post-installed AnchorsFRANCESCO MOspecial
07/21/2023Structural Cold-Formed SteelFRANCESCO MOspecial
07/21/2023Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
07/21/2023Structural Steel - DetailsFRANCESCO MOspecial
07/21/2023Structural Steel - WeldingFRANCESCO MOspecial
07/21/2023Fire-Resistant Penetrations and JointsGeorge Ranallispecial
07/21/2023Structural Steel - High Strength BoltingFRANCESCO MOspecial
07/21/2023Concrete - Cast-In-PlaceFRANCESCO MOspecial
07/19/2023FinalFRANCESCO MOprogress
04/06/2023FinalGeorge Ranalliprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026M00856396-S3Request digital key ↗
08/29/2026M00856396-I1Request digital key ↗
08/29/2026M00856396-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026M00856396-P2Open ↗
08/13/2026M00856396-S2Open ↗
08/13/2026M00856396-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00856396-P2Open ↗
08/29/2026M00856396-S3Open ↗
08/29/2026M00856396-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M00856396-S3Open ↗
08/27/2026M00856396-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00856396-S3Open ↗
08/28/2026M00856396-S3Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00856396-S3Open ↗
08/29/2026M00856396-S2Open ↗
08/29/2026M00856396-S1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00856396-S2Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026M00856396-P2Open ↗
08/13/2026M00856396-P1Open ↗
08/13/2026M00856396-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026M00856396-S3Open ↗
08/13/2026M00856396-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026M00856396-S3Open ↗
08/13/2026M00856396-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/28/2018100807806Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
12/28/2018100807806Open ↗