← Back
Two family frame
1828 HUNT AVENUE
BRONX · BIN 2043524
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5Zoning
3,364 sfGross Floor Area
2Units
Rent Stabilized
Two family frame · 2,375 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC304/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376204/01/2025
Building Lifecycle
All (22)Inspection (6)Objection (10)Special Inspection (6)
11/03/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/20/2025
Objection raised — Admin
03/20/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
03/07/2025
Special inspection requirement — Maintenance information
Jian Yang
03/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
03/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
03/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/26/2025
Objection raised — Admin
02/26/2025
Objection raised — Admin
02/26/2025
Objection raised — Admin
02/26/2025
Objection raised — Admin
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.