← Back
Five to six families
183 CITY ISLAND AVENUE
BRONX · BIN 2081929
💬 Discuss this project
1925Year Built
3Stories
C2Building Class
R3AZoning
4,485 sfGross Floor Area
6Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 181-187 CITY ISLAND LLC · 2,358 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSR CONTRACTOR407/08/2026
AMS CONTRACTOR807/08/2026
MANIANI BUILDERS704/09/2026
181-187 CITY ISLAND LLC1403/22/2026
181-87 CITY ISLAND LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP103/20/2025
MOHAMMAD AHEAD, PE103/02/2025
ASR ENGINEERING PC107/01/2022
SYED ENGINEERING, P.C.101/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
MANIANI BUILDERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMS CONTRACTOR INCGeneral Contractor207/08/2026
MANIANI BUILDERS CORPGeneral Contractor204/09/2026
GSR CONTRACTOR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818103/20/2025
Building Lifecycle
All (86)Filed (4)Permit Issued (5)Signed Off (2)Violation (60)Inspection (4)Objection (6)Special Inspection (5)
06/22/2026
Signed off — Alteration
1. FACE BRICK REPLACEMENT 1ST FLOOR WINDOW LINTEL TO TOP OF PARAPET WALL AT FRONT FACADE=450 SF2. REPAIR/ REPLACE WINDOW LINTEL AT FRONT FACADE=4 NOS3. REPAIR/ REPLACE WINDOW SILL AT FRONT FACADE=5 NOS
X01184198-S1
05/22/2026
Violation issued (ECB, open)
Construction
05/22/2026
Violation issued (ECB, open)
Unknown
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, closed)
Construction
03/01/2026
Violation issued (HPD, closed)
C
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
C
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
B
03/01/2026
Violation issued (HPD, closed)
C
02/13/2026
Violation issued (HPD, closed)
B
02/13/2026
Violation issued (HPD, closed)
C
02/13/2026
Violation issued (HPD, closed)
B
02/13/2026
Violation issued (HPD, closed)
B
05/12/2025
Permit issued — General Construction
X01184198-S1-GC
05/06/2025
Permit issued — Sidewalk Shed
X01184198-I1-SH
04/06/2025
Objection resolved — Addressed
04/06/2025
Objection resolved — Addressed
03/28/2025
Objection raised — Other
03/28/2025
Objection raised — Other
03/20/2025
Filed — Alteration
1. FACE BRICK REPLACEMENT 1ST FLOOR WINDOW LINTEL TO TOP OF PARAPET WALL AT FRONT FACADE=450 SF2. REPAIR/ REPLACE WINDOW LINTEL AT FRONT FACADE=4 NOS3. REPAIR/ REPLACE WINDOW SILL AT FRONT FACADE=5 NOS
X01184198-S1
03/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
03/17/2025
Special inspection requirement — Masonry
NORMAN LOK
03/17/2025
Special inspection requirement — Final
ADITYA DESAI
03/04/2025
Objection resolved — Addressed
03/03/2025
Objection raised — Other
03/02/2025
Filed — Alteration
1. FACE BRICK REPLACEMENT 1ST FLOOR WINDOW LINTEL TO TOP OF PARAPET WALL AT FRONT FACADE=450 SF2. REPAIR/ REPLACE WINDOW LINTEL AT FRONT FACADE=4 NOS3. REPAIR/ REPLACE WINDOW SILL AT FRONT FACADE=5 NOS
X01184198-I1
02/13/2025
Violation issued (ECB, open)
Unknown
02/13/2025
Violation issued (ECB, closed)
Construction
11/16/2024
Violation issued (HPD, closed)
A
11/16/2024
Violation issued (HPD, closed)
B
11/08/2024
Violation issued (ECB, closed)
Construction
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
C
10/08/2024
Violation issued (HPD, closed)
C
10/01/2024
Violation issued (ECB, open)
Unknown
08/01/2024
Violation issued (HPD, closed)
C
07/25/2024
Violation issued (ECB, open)
Unknown
07/22/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, closed)
C
07/22/2024
Violation issued (HPD, open)
C
07/22/2024
Violation issued (HPD, open)
C
07/22/2024
Violation issued (HPD, closed)
B
07/17/2024
Violation issued (HPD, closed)
C
07/17/2024
Violation issued (HPD, closed)
A
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMANIANI BUILDERS CORP05/12/2025
DOB NOWSidewalk ShedPermit IssuedMANIANI BUILDERS CORP05/06/2025
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC07/04/2022
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC07/27/2020
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC01/28/2020
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD07/12/2005
BISFBISSUEDATLAS FUEL OIL CORP.06/28/1990
2 projects · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025Permit IssuedRICHARD NEU—
01/27/2020Permit IssuedRICHARD NEU—
2 projects · most recent 03/20/2025
Sidewalk Shed
FiledStatusContractorScope
03/20/2025Signed-offMANIANI BUILDERS CORPSidewalk Shed
07/01/2022Permit IssuedGSR CONTRACTOR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/17/2025Tenant Protection Plan ComplianceNORMAN LOKspecial
03/17/2025Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
03/17/2025MasonryNORMAN LOKspecial
03/17/2025FinalADITYA DESAIprogress
01/26/2020FinalRAFI HAMIDprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/24/2026X00764617-I1Request digital key ↗
08/19/2026X01184198-I1Request digital key ↗
08/19/2026X01184198-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00303690-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00764617-I1Open ↗
08/19/2026X01184198-S1Open ↗
08/19/2026X01184198-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X00303690-I1Open ↗
08/26/2026X01184198-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01184198-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00303690-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026X01184198-S1Open ↗