← Back
Two family converted from one family
296 HICKS STREET
BROOKLYN · BIN 3002347
💬 Discuss this project
1879Year Built
3Stories
B3Building Class
R6Zoning
4,000 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · Owner of record: 296 HICKS LLC · 2,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof7p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERGLADES TOWER 2002107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CES ENGINEERING LLC407/28/2025
NY BUILDING ASSOCIATES INC101/02/2025
ASHRAF CORP107/17/2024
BARRY STRUCTURAL ENGINEERING, PLLC109/27/2023
ANNE MARIE LUBRANO108/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1203/21/2026
BROOKLYN SOLARWORKS103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R. SUTTON & CO LLCGeneral Contractor707/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
ARCON PLBG SOLUTIONSPlumbing107/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749507/28/2025
DOMANI INSPECTION SERVICE843207/28/2025
NKM ENGINEERING PLLC6244101/02/2025
Building Lifecycle
All (107)Filed (8)Permit Issued (11)Signed Off (4)Violation (1)Inspection (3)Objection (58)Special Inspection (22)
09/16/2025
Special inspection requirement — Final
Anne Marie Lubrano
09/16/2025
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
09/16/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
07/28/2025
Filed — Alteration
Modification to exist. Mechanical and Heating Systems to replace radiators with new, ductwork, diffusers, exhausts, (2) Elect. Boilers and Heat Pumps on the Roof.
B00913224-P2
07/15/2025
Special inspection requirement — Final
Anne Marie Lubrano
07/15/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
07/15/2025
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
06/27/2025
Signed off — Alteration
Modification to exist. Mechanical and Heating Systems to replace radiators with new, ductwork, diffusers, exhausts, (2) Elect. Boilers and Heat Pumps on the Roof.
B00913224-I1
06/13/2025
Signed off — Alteration
Modification to exist. Mechanical and Heating Systems to replace radiators with new, ductwork, diffusers, exhausts, (2) Elect. Boilers and Heat Pumps on the Roof.
B00913224-S1
05/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
05/14/2025
Objection raised — Scope
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Cost
05/14/2025
Objection resolved — Addressed
05/09/2025
Filed — Alteration
Modification to exist. Mechanical and Heating Systems to replace radiators with new, ductwork, diffusers, exhausts, (2) Elect. Boilers and Heat Pumps on the Roof.
B00913224-P1
05/08/2025
Signed off — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B01157111-I1
04/11/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01078263-I1
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
01/06/2025
Permit issued — Solar
B01157111-I1-SL
01/02/2025
Filed — Alteration
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B01157111-I1
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
12/17/2024
Special inspection requirement — Final
NARESH MAHANGU
12/17/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/22/2024
Permit issued — Structural
B00913224-S1-ST
11/22/2024
Permit issued — Mechanical Systems
B00913224-S2-MS
09/17/2024
Permit issued — General Construction
B00913224-I1-GC
07/17/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01078263-I1
07/17/2024
Permit issued — Sidewalk Shed
B01078263-I1-SF
07/17/2024
Permit issued — Supported Scaffold
B01078263-I1-SH
05/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/29/2024
Permit issued — Plumbing
B00913224-S3-PL
12/04/2023
Permit issued — Plumbing
B00913224-S3-PL
11/21/2023
Permit issued — General Construction
B00913224-I1-GC
11/21/2023
Permit issued — Mechanical Systems
B00913224-S2-MS
11/14/2023
Permit issued — Structural
B00913224-S1-ST
11/14/2023
Objection resolved — Addressed
10/20/2023
Objection resolved — Addressed
10/20/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC01/06/2025
DOB NOWStructuralSigned-offR. SUTTON & CO LLC11/22/2024
DOB NOWMechanical SystemsSigned-offR. SUTTON & CO LLC11/22/2024
DOB NOWGeneral ConstructionSigned-offR. SUTTON & CO LLC09/17/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC07/17/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC07/17/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/29/2024
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS12/04/2023
DOB NOWGeneral ConstructionSigned-offR. SUTTON & CO LLC11/21/2023
DOB NOWMechanical SystemsSigned-offR. SUTTON & CO LLC11/21/2023
DOB NOWStructuralSigned-offR. SUTTON & CO LLC11/14/2023
1 project · most recent 07/28/2025
Water/Sanitary
FiledStatusContractorScope
07/28/2025Signed-offDONATO PLUMBING, INCWater/Sanitary
3 projects · most recent 12/17/2024
General Wiring
FiledStatusContractorScope
12/17/2024CompleteBROOKYLN SOLARWORKS, LLC—
07/08/2024CompleteNASH ELECTRIC SERVICES IN—
01/25/2024CompleteSUPER CHARGED ELEC. INC.General Wiring
1 project · most recent 07/28/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
07/28/2025Signed-offR. SUTTON & CO LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/16/2025FinalAnne Marie Lubranoprogress
09/16/2025Heating SystemsJOHN MCMONAGLEspecial
09/16/2025Mechanical SystemsJOHN MCMONAGLEspecial
09/16/2025Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
07/15/2025FinalAnne Marie Lubranoprogress
07/15/2025Mechanical SystemsJOHN MCMONAGLEspecial
07/15/2025Heating SystemsJOHN MCMONAGLEspecial
07/15/2025Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
05/28/2025Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
03/07/2025Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
12/17/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
12/17/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
12/17/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/17/2024FinalNARESH MAHANGUprogress
12/17/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/10/2023Concrete - Cast-In-PlaceMICHAEL BARRYspecial
08/10/2023Structural Steel - High Strength BoltingMICHAEL BARRYspecial
08/10/2023Structural Steel - WeldingMICHAEL BARRYspecial
08/04/2023MasonryMICHAEL BARRYspecial
08/04/2023Structural Steel - DetailsMICHAEL BARRYspecial
08/02/2023FinalAnne Marie Lubranoprogress
08/02/2023FinalMICHAEL BARRYprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00913224-I1Request digital key ↗
08/26/2026B00913224-P2Request digital key ↗
08/26/2026B00913224-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/26/2026B00913224-S3Open ↗
08/26/2026B00913224-S2Open ↗
08/13/2026B00913224-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B00913224-P2Open ↗
09/23/2026B00913224-P2Open ↗
09/01/2026B00913224-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00913224-S3Open ↗
08/26/2026B00913224-S2Open ↗
08/23/2026B01157111-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B00913224-P2Open ↗
09/02/2026B00913224-I1Open ↗
09/01/2026B00913224-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00913224-I1Open ↗
08/13/2026B00913224-S3Open ↗
08/13/2026B00913224-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026B01157111-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01157111-I1Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B00913224-I1Open ↗