Three families
110 SACKETT STREET
BROOKLYN · BIN 3004240
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
M1-1Zoning
2,160 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 1,900 sf lot · 1.14 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction5p · 1 filing · 20 docs
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP404/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAB ENGINEERING PC406/26/2026
CELIN MUNOZ CONSULTING ENGINEER, PC105/29/2026
BITOPI CONSULTANTS LLC112/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYKER SOLUTIONS INCGeneral Contractor106/28/2026
PARK CONTRACTING GROUPGeneral Contractor104/09/2026
SJ CONSTR DESIGN INCGeneral Contractor109/30/2026
CROSSFIELD PLBG.&HTGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EAB ENGINEERING, PC2048306/26/2026
Building Lifecycle
All (61)Filed (6)Permit Issued (5)Violation (8)Objection (30)Special Inspection (12)
09/30/2026
Permit issued — General Construction
B01231318-I1-GC
09/29/2026
Permit issued — Structural
B01231318-S3-GC-CX
08/03/2026
Objection resolved — Resolved
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Iraj Issapour
07/21/2026
Special inspection requirement — Final
Iraj Issapour
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Iraj Issapour
07/21/2026
Special inspection requirement — Interior lighting power
Iraj Issapour
07/21/2026
Special inspection requirement — Fenestration areas
Iraj Issapour
07/21/2026
Special inspection requirement — Lighting controls
Iraj Issapour
07/21/2026
Special inspection requirement — Fenestration air leakage
Iraj Issapour
07/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Iraj Issapour
07/21/2026
Special inspection requirement — Metering
Iraj Issapour
07/21/2026
Special inspection requirement — Air barrier - visual inspection
Iraj Issapour
07/12/2026
Objection resolved — Resolved
07/12/2026
Objection resolved — Resolved
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Inspections
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
06/26/2026
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES, GAS PIPING AND GAS METER , CAP GAS PIPING AT THE ENTRANCE TO THE BUILDING IN THE CELLAR. INSTALL NEW PLUMBING FIXTURES, NEW 4 INCH STORM LINE, REPLACE UNDERGROUND SANITARY LINE IN CELLAR IN CONJUCTION WITH JOB #B0123118
B01231318-P1
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Other
06/11/2026
Objection raised — Other
06/11/2026
Objection raised — Other
05/29/2026
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES, GAS PIPING AND GAS METER , CAP GAS PIPING AT THE ENTRANCE TO THE BUILDING IN THE CELLAR. INSTALL NEW PLUMBING FIXTURES, NEW 4 INCH STORM LINE, REPLACE UNDERGROUND SANITARY LINE IN CELLAR IN CONJUCTION WITH JOB #B0123118
B01231318-S3
05/05/2026
Violation issued (HPD, closed)
A
01/02/2026
Permit issued — Sidewalk Shed
B01340498-I1-SH
12/31/2025
Filed — Alteration
B01340498-I1
12/01/2025
Permit issued — Plumbing
B01231318-S1-PL
10/31/2025
Permit issued — General Construction
B01231318-I1-GC
06/27/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/18/2025
Objection raised — Scope
06/18/2025
Objection raised — Zoning
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/17/2025
Objection raised — Cost
06/17/2025
Objection raised — Scope
06/17/2025
Objection raised — Plumbing
06/17/2025
Objection raised — Plumbing
06/17/2025
Objection raised — Scope
06/17/2025
Objection raised — Plumbing
06/17/2025
Objection raised — Energy
06/10/2025
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES, GAS PIPING AND GAS METER , CAP GAS PIPING AT THE ENTRANCE TO THE BUILDING IN THE CELLAR. INSTALL NEW PLUMBING FIXTURES, NEW 4 INCH STORM LINE, REPLACE UNDERGROUND SANITARY LINE IN CELLAR IN CONJUCTION WITH JOB #B0123118
B01231318-S2
06/09/2025
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES, GAS PIPING AND GAS METER , CAP GAS PIPING AT THE ENTRANCE TO THE BUILDING IN THE CELLAR. INSTALL NEW PLUMBING FIXTURES, NEW 4 INCH STORM LINE, REPLACE UNDERGROUND SANITARY LINE IN CELLAR IN CONJUCTION WITH JOB #B0123118
B01231318-I1
06/09/2025
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES, GAS PIPING AND GAS METER , CAP GAS PIPING AT THE ENTRANCE TO THE BUILDING IN THE CELLAR. INSTALL NEW PLUMBING FIXTURES, NEW 4 INCH STORM LINE, REPLACE UNDERGROUND SANITARY LINE IN CELLAR IN CONJUCTION WITH JOB #B0123118
B01231318-S1
04/11/2024
Violation issued (HPD, closed)
A
03/24/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
10/19/2018
Violation issued (HPD, closed)
I
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSJ CONSTR DESIGN INC09/30/2026
DOB NOWStructuralPermit IssuedSJ CONSTR DESIGN INC09/29/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP01/02/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG12/01/2025
DOB NOWGeneral ConstructionPermit IssuedDYKER SOLUTIONS10/31/2025
1 project · most recent 06/26/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2026Permit IssuedSJ CONSTR DESIGN INCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-3C30NAHZ4-U1 90,000 BTU · Condensing Unit ×3
Heating
Mitsubishi Electric MXZ-3C30NAHZ4-U1 87,000 BTU · Heat Pump Outdoor ×3
1 project · most recent 06/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/26/2026Permit IssuedCROSSFIELD PLBG.&HTGStorm, Water/Sanitary
2 projects · most recent 12/30/2025
FiledStatusContractorScope
12/30/2025Permit IssuedRICHARD NEU—
11/25/2025Permit IssuedJ Y ELECTRIC INC—
1 project · most recent 06/26/2026
Steel Masonry Wood
FiledStatusContractorScope
06/26/2026Permit IssuedSJ CONSTR DESIGN INCSteel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/21/2026Structural Stability – Alterations of existing buildings—special
07/21/2026Fire-Resistant Penetrations and JointsIraj Issapourspecial
07/21/2026Fire-Resistance Rated ConstructionIraj Issapourprogress
07/21/2026FinalIraj Issapourprogress
07/21/2026Energy Code Compliance InspectionsIraj Issapourprogress
07/21/2026Interior lighting powerIraj Issapourenergy_progress
07/21/2026Fenestration areasIraj Issapourenergy_progress
07/21/2026Lighting controlsIraj Issapourenergy_progress
07/21/2026Fenestration air leakageIraj Issapourenergy_progress
07/21/2026Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
07/21/2026MeteringIraj Issapourenergy_progress
07/21/2026Air barrier - visual inspectionIraj Issapourenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01231318-S3Request digital key ↗
08/19/2026B01340498-I1Request digital key ↗
08/16/2026B01231318-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026B01231318-I1Open ↗
08/29/2026B01231318-I1Open ↗
08/29/2026B01231318-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026B01231318-P1Open ↗
08/16/2026B01231318-S2Open ↗
08/16/2026B01231318-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B01231318-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026B01231318-S2Open ↗
08/16/2026B01231318-P1Open ↗
08/16/2026B01231318-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/14/2026B01231318-S3Open ↗