Two family converted from one family
189 19 STREET
BROOKLYN · BIN 3009113
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R6BZoning
1,404 sfGross Floor Area
2Units
Two family converted from one family · 1,803 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Floor 11p · 1 filing · 11 docs
Basement3p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2021$1.1M—Private party → Private party$819/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DENISE LEE ARCHITECT410/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MPH CONSTRUCTION INCGeneral Contractor1203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GASBARRO STRUCTURAL ENGIN5919212/09/2021
EDWARD F ZEVALLOS ARCHITE1025111/26/2021
Building Lifecycle
All (59)Filed (4)Permit Issued (4)Signed Off (3)Objection (30)Special Inspection (18)
12/16/2022
Signed off — Alteration
INTERIOR RENOVATION OF KITCHEN AND BATHROOMS IN EXISTING TOWNHOUSE AS PER PLANS.
B00634345-I1
11/22/2022
Signed off — Alteration
REMOVE PORTION OF REAR WALL TO CREATE OPENING FOR A NEW DOOR. INSTALL NEW WOOD LINTEL AND TEMPORARY BRACING.
B00632805-I1
11/22/2022
Signed off — Alteration
REMOVE PORTION OF REAR WALL TO CREATE OPENING FOR A NEW DOOR. INSTALL NEW WOOD LINTEL AND TEMPORARY BRACING.
B00632805-S1
11/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
11/18/2022
Special inspection requirement — Energy Code Compliance Inspections
DENISE REO
11/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
DENISE REO
11/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
DENISE REO
11/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DENISE REO
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection resolved — Addressed
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/03/2022
Special inspection requirement — Energy Code Compliance Inspections
11/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
11/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
11/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
10/28/2022
Objection raised — Inspections
10/25/2022
Objection raised — Scope
10/21/2022
Filed — Alteration
INTERIOR RENOVATION OF KITCHEN AND BATHROOMS IN EXISTING TOWNHOUSE AS PER PLANS.
B00634345-P1
07/05/2022
Permit issued — Structural
B00632805-S1-ST
07/05/2022
Permit issued — General Construction
B00632805-I1-GC
02/22/2022
Permit issued — General Construction
B00632805-I1-GC
02/09/2022
Permit issued — Structural
B00632805-S1-ST
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
12/20/2021
Objection resolved — Addressed
12/13/2021
Objection raised — Other
12/09/2021
Filed — Alteration
REMOVE PORTION OF REAR WALL TO CREATE OPENING FOR A NEW DOOR. INSTALL NEW WOOD LINTEL AND TEMPORARY BRACING.
B00632805-S1
12/09/2021
Objection resolved — Addressed
12/09/2021
Objection resolved — Addressed
12/09/2021
Objection resolved — Addressed
12/09/2021
Objection resolved — Addressed
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection resolved — Addressed
12/01/2021
Objection resolved — Addressed
11/29/2021
Objection raised — Admin
11/29/2021
Objection raised — Admin
11/29/2021
Objection raised — Mechanical
11/29/2021
Objection raised — Mechanical
11/29/2021
Objection raised — Admin
11/29/2021
Objection raised — Fire_Protection
11/29/2021
Objection raised — Fire_Protection
11/29/2021
Objection raised — Inspections
11/29/2021
Objection raised — Scope
11/29/2021
Objection raised — Other
11/29/2021
Objection raised — Admin
11/29/2021
Objection raised — Admin
11/26/2021
Filed — Alteration
INTERIOR RENOVATION OF KITCHEN AND BATHROOMS IN EXISTING TOWNHOUSE AS PER PLANS.
B00634345-I1
11/23/2021
Filed — Alteration
REMOVE PORTION OF REAR WALL TO CREATE OPENING FOR A NEW DOOR. INSTALL NEW WOOD LINTEL AND TEMPORARY BRACING.
B00632805-I1
11/17/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Gasbarro
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
DENISE REO
11/17/2021
Special inspection requirement — Final
DENISE REO
11/17/2021
Special inspection requirement — Interior lighting power
DENISE REO
11/17/2021
Special inspection requirement — Lighting controls
DENISE REO
11/17/2021
Special inspection requirement — Lighting in dwelling units
DENISE REO
11/17/2021
Special inspection requirement — Fenestration air leakage
DENISE REO
11/17/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DENISE REO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMPH CONSTRUCTION INC07/05/2022
DOB NOWGeneral ConstructionSigned-offMPH CONSTRUCTION INC07/05/2022
DOB NOWGeneral ConstructionSigned-offMPH CONSTRUCTION INC02/22/2022
DOB NOWStructuralPermit IssuedMPH CONSTRUCTION INC02/09/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/18/2022Fire-Resistant Penetrations and JointsEdward Zevallosspecial
11/18/2022Energy Code Compliance InspectionsDENISE REOprogress
11/18/2022HVAC-R and service water heating system controlsDENISE REOenergy_progress
11/18/2022HVAC-R and service water heating equipmentDENISE REOenergy_progress
11/18/2022HVAC-R and service water piping design and insulationDENISE REOenergy_progress
11/03/2022Fire-Resistant Penetrations and Joints—special
11/03/2022Energy Code Compliance Inspections—progress
11/03/2022HVAC-R and service water heating system controls—energy_progress
11/03/2022HVAC-R and service water heating equipment—energy_progress
11/03/2022HVAC-R and service water piping design and insulation—energy_progress
11/17/2021Structural Stability – Alterations of existing buildingsThomas Gasbarrospecial
11/17/2021Energy Code Compliance InspectionsDENISE REOprogress
11/17/2021FinalDENISE REOprogress
11/17/2021Interior lighting powerDENISE REOenergy_progress
11/17/2021Lighting controlsDENISE REOenergy_progress
11/17/2021Lighting in dwelling unitsDENISE REOenergy_progress
11/17/2021Fenestration air leakageDENISE REOenergy_progress
11/17/2021Fenestration and door U-factor and product ratingsDENISE REOenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00632805-S1Request digital key ↗
08/31/2026B00632805-I1Request digital key ↗
08/15/2026B00634345-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
09/29/2026B00634345-I1Open ↗
09/29/2026B00634345-I1Open ↗
09/29/2026B00634345-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00634345-I1Open ↗
08/31/2026B00634345-P1Open ↗
08/13/2026B00632805-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/29/2026B00634345-I1Open ↗
09/23/2026B00632805-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/15/2026B00634345-I1Open ↗
08/13/2026B00632805-I1Open ↗
08/13/2026B00632805-S1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00634345-I1Open ↗
08/13/2026B00632805-I1Open ↗