← Back
Primarily 1 family with 1 store or office
5816 7 AVENUE
BROOKLYN · BIN 3016147
💬 Discuss this project
1910Year Built
2Stories
S1Building Class
R7AZoning
1,440 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · 800 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITY BUILDING NY ARCHITECT P.C.307/23/2024
LONGTIN SOLUTIONS LLC401/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y & W NY CONSTRUCTION INCGeneral Contractor307/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY BUILDING NY ARCHITEC1394207/23/2024
SIMON7555107/20/2024
ANDREW GOODRICH, P.E., PL965101/03/2023
LONGTIN SOLUTIONS LLC8320401/03/2023
Building Lifecycle
All (77)Filed (7)Permit Issued (5)Signed Off (5)Violation (5)Inspection (8)Objection (22)Special Inspection (25)
02/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2024
Signed off — Alteration
Replace the existing storefront at the 1st floor. No change in use, egress or occupancy under this application.
B01082616-I1
09/25/2024
Signed off — Alteration
File MS work type to install HVAC unites. No change in use, egress and occupancy under this application.
B01084607-I1
09/23/2024
Signed off — Alteration
Install wood construction fence in conjunction with DOB Now Build application job#M01025544. No change in use, egress or occupancy under this application.
B01081986-I1
09/19/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/26/2024
Permit issued — Mechanical Systems
B01084607-I1-MS
08/26/2024
Permit issued — General Construction
B01082616-I1-GC
08/19/2024
Objection resolved — Addressed
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
08/12/2024
Special inspection requirement — Duct leakage testing, insulation and design
YING HAO LI
08/12/2024
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
08/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/30/2024
Permit issued — Construction Fence
B01081986-I1-FN
07/29/2024
Objection raised — Fire_Protection
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Scope
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Zoning
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Inspections
07/29/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Structural
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Inspections
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Inspections
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Energy
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Other
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Admin
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Scope
07/23/2024
Filed — Alteration
File MS work type to install HVAC unites. No change in use, egress and occupancy under this application.
B01084607-I1
07/23/2024
Special inspection requirement — Final
YING HAO LI
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
07/23/2024
Special inspection requirement — Mechanical Systems
YING HAO LI
07/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
YING HAO LI
07/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
07/20/2024
Filed — Alteration
Replace the existing storefront at the 1st floor. No change in use, egress or occupancy under this application.
B01082616-I1
07/20/2024
Filed — Alteration
Install wood construction fence in conjunction with DOB Now Build application job#M01025544. No change in use, egress or occupancy under this application.
B01081986-I1
04/13/2023
Signed off — Alteration
REPAIR EXISTING LEAK GAS PIPES ON CELLAR BOILER ROOM. PLUMBING WORK AS PER PLAN, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B07998062-I1
04/03/2023
Signed off — Alteration
REPAIR EXISTING LEAK GAS PIPES ON CELLAR BOILER ROOM. PLUMBING WORK AS PER PLAN, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B07998062-S2
02/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/06/2023
Permit issued — Boiler Equipment
B07998062-S2-BE
01/03/2023
Filed — Alteration
REPAIR EXISTING LEAK GAS PIPES ON CELLAR BOILER ROOM. PLUMBING WORK AS PER PLAN, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B07998062-S2
01/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
TIM TSAI
01/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
01/03/2023
Special inspection requirement — Heating Systems
TIM TSAI
01/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
ANDREW GOODRICH
01/03/2023
Special inspection requirement — Maintenance information
TIM TSAI
12/15/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
12/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
12/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
TIM TSAI
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offY & W NY CONSTRUCTION INC08/26/2024
DOB NOWGeneral ConstructionSigned-offY & W NY CONSTRUCTION INC08/26/2024
DOB NOWConstruction FenceSigned-offY & W NY CONSTRUCTION INC07/30/2024
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC01/06/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/26/2022
1 project · most recent 10/08/2024
General Wiring
FiledStatusContractorScope
10/08/2024CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2024Fail-Final CND-Occupancy InspectionFailView ↗
02/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
12/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/12/2024Fire-Resistant Penetrations and JointsYING HAO LIspecial
08/12/2024Duct leakage testing, insulation and designYING HAO LIenergy_progress
08/12/2024Energy Code Compliance InspectionsYING HAO LIprogress
07/23/2024FinalYING HAO LIprogress
07/23/2024HVAC-R and service water heating equipmentYING HAO LIenergy_progress
07/23/2024Mechanical SystemsYING HAO LIspecial
07/23/2024Tenant Protection Plan ComplianceYING HAO LIspecial
07/23/2024HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
07/23/2024HVAC-R and service water heating system controlsYING HAO LIenergy_progress
01/03/2023HVAC-R and service water heating equipmentTIM TSAIenergy_progress
01/03/2023HVAC-R and service water heating system controlsTIM TSAIenergy_progress
01/03/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
01/03/2023Heating SystemsTIM TSAIspecial
01/03/2023Tenant Protection Plan ComplianceANDREW GOODRICHspecial
01/03/2023Maintenance informationTIM TSAIenergy_progress
12/15/2022Energy Code Compliance InspectionsTIM TSAIprogress
12/15/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
12/15/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
12/15/2022Maintenance informationTIM TSAIenergy_progress
12/15/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
12/09/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
12/09/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
12/09/2022Maintenance informationTIM TSAIenergy_progress
12/09/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
12/09/2022Energy Code Compliance InspectionsTIM TSAIprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B07998062-S2Request digital key ↗
08/28/2026B07998062-P2Request digital key ↗
08/28/2026B07998062-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B07998062-S2Open ↗
08/26/2026B01084607-I1Open ↗
08/26/2026B01084607-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B07998062-S2Open ↗
08/28/2026B07998062-P2Open ↗
08/28/2026B07998062-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B07998062-S2Open ↗
09/23/2026B07998062-S2Open ↗
08/26/2026B01084607-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B07998062-S2Open ↗
08/28/2026B07998062-P2Open ↗
08/28/2026B07998062-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B07998062-I1Open ↗