← Back
Walk-up apt, over six families with stores
881 5 AVENUE
BROOKLYN · BIN 3017768
💬 Discuss this project
1924Year Built
4Stories
C7Building Class
M1-2Zoning
10,000 sfGross Floor Area
16Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 881 5TH AVE LLC · 3,500 sf lot · 2.86 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof3p · 1 filing · 6 docs
Floor 24p · 1 filing · 6 docs
Floor 13p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANAS807/08/2026
MANAS PROPERTY GROUP307/08/2026
881 5TH AVE LLC103/22/2026
5TH HEIDEN LLC103/22/2026
FIFTH HEIDEN LLC103/22/2026
881 5TH AVE LLC MANAS PRO103/22/2026
SEMEL103/21/2026
SUGARCANE BK 2GO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JSPECS, INC204/29/2026
JAMES A BOWLES PE209/05/2025
EMMANUEL KAVRAKIS ARCHITECTS LLC211/15/2024
ASHRAF CORP112/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESTHERS, JOHNElectrical103/21/2026
GROOS, FElectrical103/21/2026
R. MARIC PIPING INCElectrical103/21/2026
STABILITY ELEC ENTERP INCElectrical103/22/2026
TAHMAZ, ERBAYElectrical103/21/2026
CT IDEAL SUPPRESSIONGeneral Contractor107/08/2026
GN HOME IMPROVEMENT CORPGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
FM95 NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429104/29/2026
AM DESIGN STUDIO LLC4413211/15/2024
JAY KAVI CORPORATION8500112/29/2023
Building Lifecycle
All (94)Filed (7)Permit Issued (4)Signed Off (1)Violation (60)Inspection (4)Objection (8)Special Inspection (10)
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2026
Permit issued — Sign
B01334384-I1-SG
04/29/2026
Filed — Alteration
REPLACEMENT OF TWO (2) 12'H X 24'W LEGAL NON-CONFORMING ADVERTISING WALL SIGNS WITH ONE (1) (25'H X 23'W) NON-CONFORMING ADVERTISING WALL SIGN. THERE WILL BE NO INCREASE IN THE DEGREE OF NON-CONFORMITY.
B01334384-I1
04/29/2026
Filed — Alteration
REPLACEMENT OF TWO (2) 12'H X 24'W LEGAL NON-CONFORMING ADVERTISING WALL SIGNS WITH ONE (1) (25'H X 23'W) NON-CONFORMING ADVERTISING WALL SIGN. THERE WILL BE NO INCREASE IN THE DEGREE OF NON-CONFORMITY.
B01334384-S1
01/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
12/15/2025
Special inspection requirement — Final
Jeffrey Stones
12/15/2025
Special inspection requirement — Final
Jeffrey Stones
09/05/2025
Filed — Alteration
RELOCATION OF FIVE (5) COMMERCIAL COOKING EQUIPMENT AND (4) PLUMBING FIXTURES.
B01240422-P1
07/10/2025
Violation issued (HPD, closed)
C
07/10/2025
Violation issued (HPD, closed)
C
06/30/2025
Filed — Alteration
RELOCATION OF FIVE (5) COMMERCIAL COOKING EQUIPMENT AND (4) PLUMBING FIXTURES.
B01240422-I1
06/23/2025
Violation issued (HPD, open)
B
05/13/2025
Violation issued (HPD, open)
B
05/13/2025
Violation issued (HPD, closed)
A
05/13/2025
Violation issued (HPD, closed)
C
05/13/2025
Violation issued (HPD, open)
C
05/13/2025
Violation issued (HPD, closed)
A
05/13/2025
Violation issued (HPD, closed)
A
05/13/2025
Violation issued (HPD, open)
C
03/06/2025
Signed off — Alteration
B01141800-I1
03/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2025
Permit issued — Plumbing
B01142742-I1-PL
12/18/2024
Permit issued — General Construction
B01141800-I1-GC
11/15/2024
Filed — Alteration
PROPOSED PLUMBING FIXTURES AS PER PLANS FOR REPAIRS DUE TO FIRE. NO CHANGE IN OCCUPANCY , USE OR EGRESS
B01142742-I1
11/13/2024
Filed — Alteration
B01141800-I1
11/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
11/13/2024
Special inspection requirement — Final
EMMANUEL KAVRAKIS
11/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
EMMANUEL KAVRAKIS
08/02/2024
Violation issued (HPD, closed)
I
08/02/2024
Violation issued (HPD, closed)
I
08/02/2024
Violation issued (HPD, closed)
I
08/02/2024
Violation issued (HPD, closed)
I
08/02/2024
Violation issued (HPD, closed)
I
07/25/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2024
Violation issued (ECB, closed)
Construction
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, closed)
B
01/31/2024
Permit issued — Mechanical Systems
B00980338-I1-MS
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/05/2024
Objection raised — Other
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT05/02/2026
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC02/10/2025
DOB NOWGeneral ConstructionSigned-offGN HOME IMPROVEMENT CORP12/18/2024
DOB NOWMechanical SystemsPermit IssuedCT IDEAL SUPPRESSION01/31/2024
BISFSISSUEDAPPROVED OIL CO. OF BROOK08/20/2018
BISPLISSUEDKINGS PLAZA P & H INC08/20/2018
BISFPISSUEDMASTER FIRE SYSTEMS, INC07/27/2017
BISOTISSUEDJ&F RENOVATIONS INC06/05/2009
BISFPISSUEDCITY FIRE CONTROL08/30/1991
1 project · most recent 12/29/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/29/2023Permit IssuedCT IDEAL SUPPRESSIONVentilation Systems
Ventilation
Captiveaire NCA14FA 1,800 CFM · Exhaust Fan ×1
1 project · most recent 09/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/05/2025——Gas, Water/Sanitary
2 projects · most recent 04/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
04/11/2025CompleteSTABILITY ELEC ENTERP INCGeneral Wiring
11/09/2021CompleteNYCO ELECTRIC CORPBoiler Controls
1 project · most recent 04/29/2026
FiledStatusContractorScope
04/29/2026Permit IssuedFM95 NY LLC1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/17/2025Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
12/17/2025Tenant Protection Plan ComplianceJeffrey Stonesspecial
12/15/2025FinalJeffrey Stonesprogress
12/15/2025FinalJeffrey Stonesprogress
11/13/2024Tenant Protection Plan ComplianceALLENDE MATOSspecial
11/13/2024FinalEMMANUEL KAVRAKISprogress
11/13/2024Fire-Resistance Rated ConstructionEMMANUEL KAVRAKISprogress
12/21/2023Fire-Resistant Penetrations and JointsJay Kavispecial
12/20/2023FinalBRIAN MCCAFFREYprogress
12/20/2023Mechanical SystemsJay Kavispecial
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00980338-I1Request digital key ↗
08/23/2026B01141800-I1Request digital key ↗
08/23/2026B01142742-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
08/21/2018321714891Open ↗
08/21/2018321714891Open ↗
08/21/2018321714891Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/05/2019321714891Open ↗
01/11/2018321714891Open ↗
07/14/2017321620894Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/12/2019321714891Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00980338-I1Open ↗
08/23/2026B01141800-I1Open ↗
08/23/2026B01142742-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/26/2018321620894Open ↗
01/11/2018321714891Open ↗
07/27/2017321620894Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026B01334384-S1Open ↗
08/29/2026B01141800-I1Open ↗
08/29/2026B01141800-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026B01334384-S1Open ↗
08/29/2026B01141800-I1Open ↗
08/28/2026B00980338-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/16/2018321714891Open ↗
07/14/2017321620894Open ↗
06/03/2008310148328Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/14/2017321620894Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/03/2008310148328Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/11/2018321714891Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA1
09/26/2018321620894Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/11/2018321714891Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/11/2018321714891Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/11/2018321714891Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026B00980338-I1Open ↗
08/23/2026B01141800-I1Open ↗
08/23/2026B01142742-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/11/2018321714891Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/03/2008310148328Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/21/2020321714891Open ↗
02/21/2020321714891Open ↗
12/24/2019321714891Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/14/2019321714891Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/22/2020321714891Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/22/2020321714891Open ↗
02/21/2020321714891Open ↗
12/24/2019321714891Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
12/22/2020321714891Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/03/2008310148328Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/26/2018321620894Open ↗
01/11/2018321714891Open ↗
07/14/2017321620894Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
01/12/2018321714891Open ↗
07/17/2017321620894Open ↗
06/03/2008310148328Open ↗
▸BISBOROUGH INTAKE FORM3
12/24/2019321714891Open ↗
09/14/2019321714891Open ↗
09/26/2018321620894Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/15/2017321620894Open ↗