← Back
Four families
43 PARK PLACE
BROOKLYN · BIN 3018899
💬 Discuss this project
1899Year Built
3Stories
C3Building Class
R6BZoning
3,600 sfGross Floor Area
4Units
Rent Stabilized33 Open Violations ▸FDNY Report ↗
Four families · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Floor 321p · 2 filings · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar27p · 2 filings · 20 docs
Basement19p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2021$3.4M—43 PARK PLACE REALTY HOLDINGS LLC → Private party$938/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC SAFYAN ARCHITECT PC511/29/2023
LEVIN ENGINEERING PLLC209/22/2023
BARRY STRUCTURAL ENGINEERING, PLLC209/14/2022
NS ENGINEERS, P.C.108/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER703/21/2026
LEVIN ENGINEERING PLLC403/21/2026
HALF SQUARE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TUMEN, INCGeneral Contractor1607/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC SAFYAN ARCHITECTPC3248311/29/2023
LEVIN ENGINEERING PLLC1267209/22/2023
BARRY STRUCTURAL ENGINEER749209/14/2022
TRIANGLE INSPECTION & TES7495209/14/2022
Building Lifecycle
All (122)Filed (10)Permit Issued (11)Signed Off (5)Violation (42)Inspection (8)Objection (16)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
03/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00795544-I1
12/28/2023
Signed off — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-S1
12/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/06/2023
Special inspection requirement — Lighting in dwelling units
Eric Safyan
12/06/2023
Special inspection requirement — Air barrier - visual inspection
Eric Safyan
12/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Safyan
12/06/2023
Special inspection requirement — Fenestration air leakage
Eric Safyan
12/06/2023
Special inspection requirement — Insulation placement and R values
Eric Safyan
12/06/2023
Special inspection requirement — Fenestration areas
Eric Safyan
12/06/2023
Special inspection requirement — Protection of exposed foundation insulation
Eric Safyan
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
12/06/2023
Special inspection requirement — Final
Eric Safyan
12/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Eric Safyan
12/06/2023
Special inspection requirement — Mechanical Systems
Eric Safyan
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
12/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Safyan
11/29/2023
Filed — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-P3
11/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
11/23/2023
Special inspection requirement — Mechanical Systems
Eric Safyan
11/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Safyan
11/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
11/23/2023
Special inspection requirement — Final
Eric Safyan
11/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Eric Safyan
11/23/2023
Special inspection requirement — Insulation placement and R values
Eric Safyan
11/23/2023
Special inspection requirement — Fenestration air leakage
Eric Safyan
11/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Safyan
11/23/2023
Special inspection requirement — Protection of exposed foundation insulation
Eric Safyan
11/23/2023
Special inspection requirement — Lighting in dwelling units
Eric Safyan
11/23/2023
Special inspection requirement — Air barrier - visual inspection
Eric Safyan
11/23/2023
Special inspection requirement — Fenestration areas
Eric Safyan
11/20/2023
Violation issued (HPD, open)
I
11/01/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dmitry Levin
10/23/2023
Special inspection requirement — Sprinkler Systems
Dmitry Levin
10/16/2023
Objection resolved — Addressed
10/03/2023
Objection raised — Other
09/22/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00795544-P1
09/18/2023
Permit issued — Plumbing
B00729264-S1-PL
09/14/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/07/2023
Signed off — Alteration
INSTALL 8 FT HEIGHT PLYWOOD FENCE AT THE BACK OF THE HOUSE AS PER PLAN.
B00793004-I1
09/06/2023
Signed off — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-S5
07/18/2023
Permit issued — Sprinklers
B00795544-I1-EW-SP
07/07/2023
Signed off — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-S6
03/24/2023
Violation issued (HPD, open)
A
02/14/2023
Filed — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-P1
02/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
02/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
02/03/2023
Filed — Alteration CO
Plumbing work filed in conjunction with the renovation of the building
B00729264-P2
11/17/2022
Permit issued — Mechanical Systems
B00729264-I1-GC-CX
11/17/2022
Permit issued — Structural
B00729264-S5-ST
11/17/2022
Permit issued — Foundation
B00729264-S6-FO
11/09/2022
Violation issued (HPD, open)
I
10/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/18/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC07/18/2023
DOB NOWMechanical SystemsPermit IssuedTUMEN, INC11/17/2022
DOB NOWStructuralSigned-offTUMEN, INC11/17/2022
DOB NOWFoundationSigned-offTUMEN, INC11/17/2022
DOB NOWFoundationSigned-offTUMEN, INC09/20/2022
DOB NOWConstruction FenceSigned-offTUMEN, INC09/20/2022
DOB NOWStructuralSigned-offTUMEN, INC09/16/2022
DOB NOWGeneral ConstructionPermit IssuedTUMEN, INC09/13/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC08/31/2022
DOB NOWMechanical SystemsPermit IssuedTUMEN, INC08/26/2022
BIS—ISSUEDDESIGN TECH CONSTRUCT COR07/19/2010
BISPLISSUEDA+ INSTALLATION09/12/2007
BIS—ISSUEDDESIGN TECH CONSTRUCT COR07/18/2007
BIS—ISSUEDDESIGN TECH CONSTRUCT COR04/21/1999
BISPLISSUEDLIQUID PLBG & HTNG SCS IN09/10/1998
1 project · most recent 11/29/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/29/2023Signed-offTUMEN, INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ 3 tons · Condensing Unit ×4
MXZ-3C24NAHZ3 2 tons · Condensing Unit ×2
MXZ-3C30NAHZ3 30,000 BTU · Condensing Unit ×2
1 project · most recent 11/29/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/29/2023Signed-offXH&RC PLBG AND HTG INCGas, Storm, Water/Sanitary
1 project · most recent 11/01/2023
General Wiring
FiledStatusContractorScope
11/01/2023CompleteA.M.J ELECTRIC CORPGeneral Wiring
1 project · most recent 11/29/2023
Steel Wood
FiledStatusContractorScope
11/29/2023Signed-offXH&RC PLBG AND HTG INCSteel, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/18/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
12/06/2023Lighting in dwelling unitsEric Safyanenergy_progress
12/06/2023Air barrier - visual inspectionEric Safyanenergy_progress
12/06/2023Fenestration and door U-factor and product ratingsEric Safyanenergy_progress
12/06/2023Fenestration air leakageEric Safyanenergy_progress
12/06/2023Insulation placement and R valuesEric Safyanenergy_progress
12/06/2023Fenestration areasEric Safyanenergy_progress
12/06/2023Protection of exposed foundation insulationEric Safyanenergy_progress
12/06/2023Energy Code Compliance InspectionsEric Safyanprogress
12/06/2023FinalEric Safyanprogress
12/06/2023Fire-Resistance Rated ConstructionEric Safyanprogress
12/06/2023Mechanical SystemsEric Safyanspecial
12/06/2023Fire-Resistant Penetrations and JointsEric Safyanspecial
12/06/2023Structural Stability – Alterations of existing buildingsEric Safyanspecial
11/23/2023Fire-Resistant Penetrations and JointsEric Safyanspecial
11/23/2023Mechanical SystemsEric Safyanspecial
11/23/2023Structural Stability – Alterations of existing buildingsEric Safyanspecial
11/23/2023Energy Code Compliance InspectionsEric Safyanprogress
11/23/2023FinalEric Safyanprogress
11/23/2023Fire-Resistance Rated ConstructionEric Safyanprogress
11/23/2023Insulation placement and R valuesEric Safyanenergy_progress
11/23/2023Fenestration air leakageEric Safyanenergy_progress
11/23/2023Fenestration and door U-factor and product ratingsEric Safyanenergy_progress
11/23/2023Protection of exposed foundation insulationEric Safyanenergy_progress
11/23/2023Lighting in dwelling unitsEric Safyanenergy_progress
11/23/2023Air barrier - visual inspectionEric Safyanenergy_progress
Latest 25 of 57.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00729264-P1Request digital key ↗
08/27/2026B00729264-P3Request digital key ↗
08/27/2026B00729264-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00729264-P3Open ↗
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00729264-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B00729264-S5Open ↗
08/28/2026B00729264-S1Open ↗
08/28/2026B00729264-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00795544-I1Open ↗
08/27/2026B00729264-P1Open ↗
08/27/2026B00729264-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026B00729264-S5Open ↗
08/31/2026B00729264-S5Open ↗
08/28/2026B00729264-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00729264-I1Open ↗
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-P3Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00729264-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00729264-S6Open ↗
08/27/2026B00729264-P3Open ↗
08/27/2026B00729264-P2Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00729264-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B00729264-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00729264-S6Open ↗
▸Other Documents17
▸DOB NOWPlot Diagram4
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-S6Open ↗
08/13/2026B00729264-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B00729264-P3Open ↗
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00729264-P3Open ↗
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/27/2026B00729264-P3Open ↗
08/27/2026B00729264-P1Open ↗
08/15/2026B00729264-I1Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026B00729264-P1Open ↗
08/13/2026B00729264-I1Open ↗
08/13/2026B00729264-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00729264-I1Open ↗