← Back
Two family brick
119 PARK PLACE
BROOKLYN · BIN 3018957
💬 Discuss this project
1872Year Built
3Stories
B1Building Class
R6BZoning
3,600 sfGross Floor Area
2Units
Two family brick · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 2 filings · 20 docs
Floor 3Under Construction22p · 4 filings · 20 docs
Floor 2Under Construction21p · 4 filings · 20 docs
Floor 1Under Construction21p · 4 filings · 20 docs
CellarUnder Construction4p · 1 filing · 12 docs
Sub-BasementUnder Construction9p · 2 filings · 17 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2024$3.7M—Private party → Private party$1,035/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AS ENGINEERING SERVICES PC308/11/2026
ROSENTHAL ENGINEERING PLLC203/19/2026
MICHAEL TOWER ARCHITECTURE101/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAND & SHORE CREATIVE LLCGeneral Contractor408/20/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE LIGHT CONSULTING &AM9394308/11/2026
LL ENGINEERING PC1618101/17/2026
MICHAEL TOWER ARCHITECTUR8029101/16/2026
Building Lifecycle
All (39)Filed (6)Permit Issued (5)Inspection (5)Special Inspection (23)
08/19/2026
Permit issued — Foundation
B01350540-I1-FO
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Feng Li
08/14/2026
Special inspection requirement — Final
Feng Li
08/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Feng Li
08/14/2026
Special inspection requirement — Structural Steel - Details
Feng Li
08/14/2026
Special inspection requirement — Structural Steel - Welding
Feng Li
08/14/2026
Special inspection requirement — Structural Cold-Formed Steel
Feng Li
08/11/2026
Filed — Alteration
New Rear deck and staircase. New Lintel in new door opening to rear yard, minor framing work under roof. . No change in use, egress or occupancy.
B01349939-P1
08/11/2026
Special inspection requirement — Final
Feng Li
08/11/2026
Special inspection requirement — Structural Cold-Formed Steel
Feng Li
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Feng Li
08/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Feng Li
08/11/2026
Special inspection requirement — Structural Steel - Welding
Feng Li
08/11/2026
Special inspection requirement — Structural Steel - Details
Feng Li
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/14/2026
Filed — Alteration
Concrete footings for new deck. The deck is filed under separate application. No change in use, egress or occupancy.
B01350540-I1
04/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2026
Permit issued — Plumbing
B01349420-I1-PL
03/23/2026
Permit issued — Structural
B01349939-I1-ST
03/19/2026
Filed — Alteration
Plumbing modifications as per plans.
B01349420-I1
03/19/2026
Filed — Alteration
New Rear deck and staircase. New Lintel in new door opening to rear yard, minor framing work under roof. . No change in use, egress or occupancy.
B01349939-I1
03/18/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Permit issued — Mechanical Systems
B01312573-I1-MS
02/03/2026
Permit issued — General Construction
B01311952-I1-GC
01/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Feng Li
01/30/2026
Special inspection requirement — Concrete - Cast-In-Place
Feng Li
01/23/2026
Special inspection requirement — Footing and Foundation
Feng Li
01/23/2026
Special inspection requirement — Final
Feng Li
01/17/2026
Filed — Alteration
INSTALLATION/MODIFICATION OF MECH EQUIPMENT AS INDICATED IN THE PLANS FILED HEREWITH. INSTALLATION OF NEW AIR HANDLING UNITS, NEW CONDENSING UNITS, AND EXHAUST FANS/SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01312573-I1
01/16/2026
Filed — Alteration
INTERIOR RENOVATION TO 2 FAMILY DWELLING. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01311952-I1
11/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS LEE
11/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS LEE
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS LEE
11/03/2025
Special inspection requirement — Final
LOUIS LEE
11/03/2025
Special inspection requirement — Mechanical Systems
LOUIS LEE
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
11/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS LEE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedLAND & SHORE CREATIVE LLC08/19/2026
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP03/24/2026
DOB NOWStructuralPermit IssuedLAND & SHORE CREATIVE LLC03/23/2026
DOB NOWMechanical SystemsPermit IssuedLAND & SHORE CREATIVE LLC02/06/2026
DOB NOWGeneral ConstructionPermit IssuedLAND & SHORE CREATIVE LLC02/03/2026
1 project · most recent 01/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/17/2026Permit IssuedLAND & SHORE CREATIVE LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NL 3 tons · Condensing Unit ×3
PEFY-L18NMAU-A 600 CFM · Vrf Indoor ×2
PVFY-L18NAMU-A 600 CFM · Vrf Indoor ×2
PEFY-L08NMAU-A 300 CFM · Vrf Indoor ×1
PEFY-L12NMAU-A 600 CFM · Vrf Indoor ×1
PEFY-L15NMAU-A 490 CFM · Vrf Indoor ×1
Fantech DEDPV-705 110 CFM · Exhaust Fan ×1
Greenheck G-060-VG 150 CFM · Exhaust Fan ×1
Panasonic FV-0511VK2 110 CFM · Exhaust Fan ×1
1 project · most recent 03/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/19/2026Permit IssuedMETROTECH MECHANICAL CORPGas, Water/Sanitary
1 project · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026Permit IssuedURBAN TECH ELECTRIC INCGeneral Wiring
2 projects · most recent 08/11/2026
Steel
FiledStatusContractorScope
08/11/2026Permit IssuedLAND & SHORE CREATIVE LLCSteel
05/14/2026Permit IssuedLAND & SHORE CREATIVE LLC1 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/14/2026Structural Stability – Alterations of existing buildingsFeng Lispecial
08/14/2026FinalFeng Liprogress
08/14/2026Structural Steel - High Strength BoltingFeng Lispecial
08/14/2026Structural Steel - DetailsFeng Lispecial
08/14/2026Structural Steel - WeldingFeng Lispecial
08/14/2026Structural Cold-Formed SteelFeng Lispecial
08/11/2026FinalFeng Liprogress
08/11/2026Structural Cold-Formed SteelFeng Lispecial
08/11/2026Structural Stability – Alterations of existing buildingsFeng Lispecial
08/11/2026Structural Steel - High Strength BoltingFeng Lispecial
08/11/2026Structural Steel - WeldingFeng Lispecial
08/11/2026Structural Steel - DetailsFeng Lispecial
01/30/2026Structural Stability – Alterations of existing buildingsFeng Lispecial
01/30/2026Concrete - Cast-In-PlaceFeng Lispecial
01/23/2026Footing and FoundationFeng Liprogress
01/23/2026FinalFeng Liprogress
11/03/2025HVAC-R and service water heating equipmentLOUIS LEEenergy_progress
11/03/2025HVAC-R and service water piping design and insulationLOUIS LEEenergy_progress
11/03/2025Energy Code Compliance InspectionsLOUIS LEEprogress
11/03/2025FinalLOUIS LEEprogress
11/03/2025Mechanical SystemsLOUIS LEEspecial
11/03/2025Fire-Resistant Penetrations and JointsLOUIS LEEspecial
11/03/2025HVAC-R and service water heating system controlsLOUIS LEEenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B01349939-P1Request digital key ↗
09/03/2026B01349939-I1Request digital key ↗
09/03/2026B01349420-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
09/03/2026B01349939-P1Open ↗
08/17/2026B01350540-I1Open ↗
08/13/2026B01349420-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026B01312573-I1Open ↗
09/23/2026B01312573-I1Open ↗
08/27/2026B01349939-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B01312573-I1Open ↗
09/23/2026B01312573-I1Open ↗
09/23/2026B01312573-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B01349939-P1Open ↗
09/03/2026B01349939-I1Open ↗
09/03/2026B01349420-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist6
09/03/2026B01349939-P1Open ↗
08/17/2026B01350540-I1Open ↗
08/13/2026B01311952-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026B01349939-P1Open ↗
09/03/2026B01349939-I1Open ↗
09/03/2026B01349420-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/17/2026B01350540-I1Open ↗