← Back
Three families
375 2 STREET
BROOKLYN · BIN 3020856
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6BZoning
2,668 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Three families · 1,800 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSHIELDS STUDIO203/26/2026
BARRY STRUCTURAL ENGINEERING, PLLC203/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749203/26/2026
Building Lifecycle
All (40)Filed (4)Violation (11)Objection (7)Special Inspection (18)
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/23/2026
Objection raised — Zoning
04/23/2026
Objection raised — Zoning
04/23/2026
Objection raised — Structural
04/22/2026
Objection raised — Fire_Protection
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Inspections
04/21/2026
Objection raised — Zoning
03/26/2026
Filed — Alteration
FO FILING FOR STRUCTURAL SCOPE ASSOCIATED WITH CONCRETE FOOTING AND GRADE BEAMS FOR A PROPOSED SINGLE STORY HORIZONTAL ADDITION AT THE REAR BASEMENT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370611-I1
03/26/2026
Filed — Alteration
FO FILING FOR STRUCTURAL SCOPE ASSOCIATED WITH CONCRETE FOOTING AND GRADE BEAMS FOR A PROPOSED SINGLE STORY HORIZONTAL ADDITION AT THE REAR BASEMENT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370611-S1
03/26/2026
Filed — Alteration
FO FILING FOR STRUCTURAL SCOPE ASSOCIATED WITH CONCRETE FOOTING AND GRADE BEAMS FOR A PROPOSED SINGLE STORY HORIZONTAL ADDITION AT THE REAR BASEMENT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370611-S3
03/26/2026
Filed — Alteration
FO FILING FOR STRUCTURAL SCOPE ASSOCIATED WITH CONCRETE FOOTING AND GRADE BEAMS FOR A PROPOSED SINGLE STORY HORIZONTAL ADDITION AT THE REAR BASEMENT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01370611-S2
03/25/2026
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
03/25/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
MICHAEL BARRY
03/25/2026
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
03/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
03/25/2026
Special inspection requirement — Final
MICHAEL BARRY
03/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/11/2026
Special inspection requirement — Fenestration areas
03/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
03/11/2026
Special inspection requirement — Protection of exposed foundation insulation
03/11/2026
Special inspection requirement — Interior lighting power
03/11/2026
Special inspection requirement — Insulation placement and R values
03/11/2026
Special inspection requirement — Air barrier - visual inspection
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/11/2026
Special inspection requirement — Final
03/11/2026
Special inspection requirement — Fenestration air leakage
06/05/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
09/10/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/10/1994
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Nothing on file for this building.
1 project · most recent 03/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/26/2026——Gas, Water/Sanitary
1 project · most recent 03/26/2026
Steel
FiledStatusContractorScope
03/26/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/05/2026Structural Stability – Alterations of existing buildings—special
03/25/2026Structural Steel - DetailsMICHAEL BARRYspecial
03/25/2026Construction Utilizing CLT or SCL, Type IVMICHAEL BARRYspecial
03/25/2026Structural Cold-Formed SteelMICHAEL BARRYspecial
03/25/2026Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
03/25/2026FinalMICHAEL BARRYprogress
03/11/2026Fenestration and door U-factor and product ratings—energy_progress
03/11/2026Fenestration areas—energy_progress
03/11/2026Exterior Insulation and Finish Systems (EIFS)—special
03/11/2026Protection of exposed foundation insulation—energy_progress
03/11/2026Interior lighting power—energy_progress
03/11/2026Insulation placement and R values—energy_progress
03/11/2026Air barrier - visual inspection—energy_progress
03/11/2026Fire-Resistant Penetrations and Joints—special
03/11/2026Energy Code Compliance Inspections—progress
03/11/2026Fire-Resistance Rated Construction—progress
03/11/2026Final—progress
03/11/2026Fenestration air leakage—energy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026B01370611-S1Request digital key ↗
08/17/2026B01370611-I1Request digital key ↗
08/15/2026B01370611-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01370611-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01370611-S2Open ↗
08/27/2026B01370611-S2Open ↗
08/27/2026B01370611-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01370611-I1Open ↗
08/17/2026B01370611-S3Open ↗
08/17/2026B01370611-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01370611-S2Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026B01370611-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/17/2026B01370611-I1Open ↗
08/15/2026B01370611-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01370611-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01370611-I1Open ↗