← Back
Two family converted from one family
359 11 STREET
BROOKLYN · BIN 3022655
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
2,091 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,700 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Basement3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BARRY STRUCTURAL ENGINEERING, PLLC212/12/2025
ERIC SAFYAN ARCHITECT PC212/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERIC SAFYAN ARCHITECT PC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TUMEN, INCGeneral Contractor304/09/2026
DOOKER, KENYElectrical103/21/2026
RYAN, ROBERTElectrical103/21/2026
VOSILLA, ALBERTOElectrical103/21/2026
L.J.S. PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749212/12/2025
ERIC SAFYAN ARCHITECTPC3248212/04/2025
Building Lifecycle
All (41)Filed (4)Permit Issued (4)Signed Off (3)Violation (3)Inspection (5)Special Inspection (22)
03/23/2026
Signed off — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-S2
03/10/2026
Signed off — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-S1
03/02/2026
Signed off — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-I1
02/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Permit issued — Structural
B01242207-S1-ST
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
12/16/2025
Special inspection requirement — Final
MICHAEL BARRY
12/16/2025
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
12/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
12/16/2025
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
12/16/2025
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
12/16/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
12/12/2025
Filed — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-P1
12/11/2025
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
12/11/2025
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
12/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
12/11/2025
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
12/11/2025
Special inspection requirement — Final
MICHAEL BARRY
12/10/2025
Permit issued — Plumbing
B01242207-S2-PL
12/04/2025
Filed — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-S2
08/27/2025
Permit issued — General Construction
B01242207-I1-GC
08/18/2025
Permit issued — General Construction
B01242207-I1-GC
07/28/2025
Filed — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-S1
07/24/2025
Filed — Alteration
Structural Work in Conjunction with Architectural filing. New Rear Porch.
B01242207-I1
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Safyan
07/14/2025
Special inspection requirement — Fenestration areas
Eric Safyan
07/14/2025
Special inspection requirement — Air barrier - visual inspection
Eric Safyan
07/14/2025
Special inspection requirement — Interior lighting power
Eric Safyan
07/14/2025
Special inspection requirement — Fenestration air leakage
Eric Safyan
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
07/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Safyan
07/14/2025
Special inspection requirement — Final
Eric Safyan
06/18/2007
Violation issued (ECB, closed)
Cranes and Derricks
06/18/2007
Violation issued (ECB, closed)
Unknown
06/18/2007
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTUMEN, INC12/16/2025
DOB NOWPlumbingSigned-offL.J.S. PIPING AND HEATING12/10/2025
DOB NOWGeneral ConstructionSigned-offTUMEN, INC08/27/2025
DOB NOWGeneral ConstructionSigned-offTUMEN, INC08/18/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/16/2025Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
12/16/2025FinalMICHAEL BARRYprogress
12/16/2025Structural Steel - WeldingMICHAEL BARRYspecial
12/16/2025Structural Steel - High Strength BoltingMICHAEL BARRYspecial
12/16/2025Structural Cold-Formed SteelMICHAEL BARRYspecial
12/16/2025Structural Steel - DetailsMICHAEL BARRYspecial
12/16/2025Concrete - Cast-In-PlaceMICHAEL BARRYspecial
12/11/2025Structural Steel - DetailsMICHAEL BARRYspecial
12/11/2025Concrete - Cast-In-PlaceMICHAEL BARRYspecial
12/11/2025Structural Cold-Formed SteelMICHAEL BARRYspecial
12/11/2025Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
12/11/2025Structural Steel - High Strength BoltingMICHAEL BARRYspecial
12/11/2025Structural Steel - WeldingMICHAEL BARRYspecial
12/11/2025FinalMICHAEL BARRYprogress
07/14/2025Fire-Resistance Rated ConstructionEric Safyanprogress
07/14/2025Fenestration areasEric Safyanenergy_progress
07/14/2025Air barrier - visual inspectionEric Safyanenergy_progress
07/14/2025Interior lighting powerEric Safyanenergy_progress
07/14/2025Fenestration air leakageEric Safyanenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsEric Safyanspecial
07/14/2025Fenestration and door U-factor and product ratingsEric Safyanenergy_progress
07/14/2025FinalEric Safyanprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01242207-S2Request digital key ↗
08/21/2026B01242207-P1Request digital key ↗
08/21/2026B01242207-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
05/10/2017321417025Open ↗
05/09/2017321417025Open ↗
07/14/2016321417025Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature13
08/28/2026B01242207-S1Open ↗
08/28/2026B01242207-S1Open ↗
08/28/2026B01242207-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026B01242207-S1Open ↗
08/25/2026B01242207-P1Open ↗
08/22/2026B01242207-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01242207-S2Open ↗
08/21/2026B01242207-P1Open ↗
08/21/2026B01242207-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/02/2016321417025Open ↗
07/14/2016321417025Open ↗
07/14/2016321417025Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/02/2016321417025Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01242207-S2Open ↗
08/21/2026B01242207-P1Open ↗
08/21/2026B01242207-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/14/2016321417025Open ↗
07/14/2016321417025Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/02/2016321417025Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/02/2016321417025Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/14/2016321417025Open ↗
07/14/2016321417025Open ↗