← Back
Miscellaneous two family
611 11 STREET
BROOKLYN · BIN 3026242
💬 Discuss this project
1891Year Built
2Stories
B9Building Class
R6BZoning
2,268 sfGross Floor Area
2Units
Miscellaneous two family · 1,842 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
Basement19p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JSPY ARCHITECTURE508/30/2023
GREEN SOLUTIONS ENGINEERING & ENERG101/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EPAC BUILDING CONSULTING INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED OAK RENOVATIONS CORPGeneral Contractor607/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749207/19/2023
PATH ARCHITECTURE P.C.1567207/19/2023
ADAL ENGINEERING PLLC4205101/17/2023
Building Lifecycle
All (101)Filed (6)Permit Issued (6)Inspection (8)Objection (66)Special Inspection (15)
10/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2025
Permit issued — General Construction
B00719832-I1-GC
09/20/2024
Permit issued — General Construction
B00719832-I1-GC
06/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2024
Permit issued — Plumbing
B00719832-S1-PL
05/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WOJCIECH OKTAWIEC
09/28/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Chris Yiu
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
JASON SHANNON
09/28/2023
Special inspection requirement — Interior lighting power
JASON SHANNON
09/28/2023
Special inspection requirement — Lighting controls
JASON SHANNON
09/28/2023
Special inspection requirement — Fenestration air leakage
JASON SHANNON
09/25/2023
Objection resolved — Addressed
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Objection resolved — Addressed
09/05/2023
Objection raised — Admin
08/30/2023
Filed — Alteration CO
subsequent filing for plumbing works.
B00719832-P3
08/22/2023
Objection raised — Other
08/17/2023
Objection resolved — Addressed
07/26/2023
Objection resolved — Addressed
07/25/2023
Objection raised — Other
07/25/2023
Objection raised — Accessibility
07/19/2023
Filed — Alteration CO
subsequent filing for plumbing works.
B00719832-P2
07/18/2023
Filed — Alteration CO
subsequent filing for plumbing works.
B00719832-P1
06/05/2023
Permit issued — Plumbing
B00719832-S1-PL
05/24/2023
Permit issued — General Construction
B00719832-I1-GC
05/10/2023
Permit issued — Mechanical Systems
B00719832-S2-MS
01/30/2023
Objection resolved — Addressed
01/26/2023
Objection resolved — Addressed
01/19/2023
Objection raised — Scope
01/17/2023
Filed — Alteration CO
subsequent filing for plumbing works.
B00719832-S2
01/17/2023
Filed — Alteration CO
subsequent filing for plumbing works.
B00719832-S1
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Accessibility
11/14/2022
Objection resolved — Addressed
08/12/2022
Objection raised — Other
08/12/2022
Objection resolved — Addressed
08/12/2022
Objection resolved — Addressed
08/04/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Structural
07/25/2022
Objection resolved — Addressed
07/25/2022
Objection resolved — Addressed
07/25/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Other
07/14/2022
Objection resolved — Addressed
06/27/2022
Special inspection requirement — Mechanical Systems
Dariusz Makara
06/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
06/27/2022
Special inspection requirement — Final
Dariusz Makara
06/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Dariusz Makara
06/27/2022
Special inspection requirement — Maintenance information
Dariusz Makara
06/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
06/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP02/26/2025
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP09/20/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/18/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/05/2023
DOB NOWGeneral ConstructionPermit IssuedRED OAK RENOVATIONS CORP05/24/2023
DOB NOWMechanical SystemsPermit IssuedRED OAK RENOVATIONS CORP05/10/2023
1 project · most recent 08/30/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/30/2023Permit IssuedRED OAK RENOVATIONS CORPAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C24NAHZ3-U1 22,000 BTU · Condensing Unit ×1
1 project · most recent 08/30/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/30/2023Signed-offORBIT PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 03/26/2024
General Wiring
FiledStatusContractorScope
03/26/2024CompleteP & Z ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/28/2023Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
09/28/2023Fire-Resistant Penetrations and JointsWOJCIECH OKTAWIECspecial
09/28/2023Subsurface Investigations (Borings/Test Pits)Chris Yiuspecial
09/28/2023Energy Code Compliance InspectionsJASON SHANNONprogress
09/28/2023Interior lighting powerJASON SHANNONenergy_progress
09/28/2023Lighting controlsJASON SHANNONenergy_progress
09/28/2023Fenestration air leakageJASON SHANNONenergy_progress
06/27/2022Mechanical SystemsDariusz Makaraspecial
06/27/2022HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
06/27/2022Fire-Resistant Penetrations and JointsDariusz Makaraspecial
06/27/2022FinalDariusz Makaraprogress
06/27/2022Energy Code Compliance InspectionsDariusz Makaraprogress
06/27/2022Maintenance informationDariusz Makaraenergy_progress
06/27/2022HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
06/27/2022HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00719832-P1Request digital key ↗
08/27/2026B00719832-S1Request digital key ↗
08/15/2026B00719832-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/27/2026B00719832-P1Open ↗
08/27/2026B00719832-S1Open ↗
08/15/2026B00719832-I1Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00719832-S2Open ↗
08/27/2026B00719832-P1Open ↗
08/27/2026B00719832-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00719832-I1Open ↗
08/29/2026B00719832-I1Open ↗
08/23/2026B00719832-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B00719832-I1Open ↗
08/29/2026B00719832-I1Open ↗
08/29/2026B00719832-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00719832-P1Open ↗
08/27/2026B00719832-S1Open ↗
08/15/2026B00719832-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/15/2026B00719832-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B00719832-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWPlot Diagram2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗
▸DOB NOWSURVEY: INITIAL2
08/15/2026B00719832-I1Open ↗
08/14/2026B00719832-P2Open ↗