DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB07/21/2021FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTROL NO.322124 ISSUED ON 04/23/2020 AFTER A 3-ALARM FIRE TOOK PLACE AT THE PROPERTY ON 04/20/2020.THIS ORDER REQ'D THAT STRUCTRL REPR WORK PERMIT BE OBT'D NO LATER THAN 05/29/2020.AS OF 07/21/2021,NO STRUCTRL REPR PERMT HAS BEEN OBT'D TO RPR THE BLDG.CMPLY WITH COMMISH ORDR-CONTROL NO-322124 IMMED
DOB04/23/2020FAILURE TO MAINTAIN-BLDG SUFFERED FIRE DMG ON 4/20/20.ROOF&ROOF JOISTS ABOVE UNIT#7@4FL SEVERLY DMGD.ROOF ABOVE UNIT#8 SEVERAL HOLES,ORNAMNTL METAL @EXP1&2-SEVERLY DMGD & AT RISK OF COLLAPSE ONTO PUBLIC SIDEWALK UNITS 7&8 INTER DMG,UNITS@1,2&3 FLS WATER DMG.THRUOUT.OWNR ENGAGE NYPE &CONTRCT-EVAL ENTIRE BLDG OBTN PRMT NLT5/29/20 SIGNOFF NLT 10/12/20
DOB04/20/2020EMERG WORK-FIRE4/20/20-SEVERAL UNITS SUFFRD FIRE DMG ROOF&ROOF JOISTS ABOV UNIT#7-4FL,ROOF ABOV UNIT#8 SEVRL HOLES,EXP1&2 ORNAMENTL METAL CORNICE SEVRLY DMGD&AT RISK OF COLLAPSE ONTO PUBLC SIDEWLK.OWNR IMMED ENGAGE NYSPE&CONTRCT.INSTAL SWS ALNG EXP1&2 EXTND 5'BEYND PROP LINES& SEAL&WATER TITE ROOF OPNG ABV#8 ONLY UNDR CONT PE SPRV,FILE W/I 2BS DA
DOB04/20/2020PREMISE RENDERED NON COMPLIANT DUE TO FIRE LEAVING ROOF OPEN WITH HAZARD FROM DAMGE TO CORNICE
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB01/23/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/23/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/23/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/23/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB11/05/2020NO LIGHTS UNDER SIDEWALK SHED NOTE:AT TIME OF MY INSPECTION OF AN INACTIVE JOBSITE I OBSERVED THAT THE 8 FIXTURES UNDER SHED IN FRONT OF BLDG WAS NOT ILLUMINATED AFTER DARK THIS CONSTRUCTION,CREATES A HAZARD FONothing owed — awaiting certificate of correction
ECB11/02/2018ELECTRICAL WORK WITHOUT A PERMIT.OBSERVED AT 8:00AM (1)100 AMP SERVICESWITCH INSTALLED IN BASEMENT AND DISCONNECT SWITCH INSTALLED FOR BOILER IN BASEMENT.NO APPLICATION ON FILE FOR ELECTRICAL WORK IN BASEMENT.RNothing owed — awaiting certificate of correction
ECB11/02/2018UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT DEVICES APPARATUS APPLIANCES MATERIALS OR WIRING IN USE.DEFECTIVE ELECTRICAL FIXTURES THROUGHOUT APARTMENT.(2)AND EXPOSE ELECTRICAL WIRING THROUGHTOUT BASEMENTNothing owed — awaiting certificate of correction
ECB10/31/2018WORK WITHOUT A PERMIT. NOTED: AT TIME OF INSPECTION, OBSERVED AT THE REAR YARD A MAKE SHIFT SHANTY WAS CONSTRUCTED OUT OF COMBUSTIBLE MATERIALS. REMVOE THE SHANTY OR OBTAIN A PERMIT. REM: COMPLY WITH CODE.Nothing owed — awaiting certificate of correction
ECB10/31/2018FAILURE TO MAINTAIN BUILDING. NOTED: AT TIME OF INSPECTION, OBSERVED AT THE ROOF, DECORATIVE CORNICE BEING SUPPORTED BY A PIECE OF 8 X 8 LUMBER NEEDS TO BE REPLACED OR REPAIRED. REM: COMPLY WITH CODE.Nothing owed — awaiting certificate of correction
ECB01/03/200651/50A/50B. 50A-COVER MISSING ON MAN. RESET PRESSURE CONTROL. 50B-VALVES MISSING ON GAUGE GLASS VALVES. 51-PICK UP 86 PARTS PER MILLION CO ON FRONT OF BOILER I SHUT BOILER.Nothing owed — awaiting certificate of correction