← Back
Church, synagogue, chapel
155 QUINCY STREET
BROOKLYN · BIN 3056468
💬 Discuss this project
1931Year Built
2Stories
M1Building Class
R7AZoning
2,000 sfGross Floor Area
1Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: NEW CASTLE BAPTST CHURCH · 1,006 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW CASTLE BAPTIST CHURCH1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS304/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW GLOBE DEVELOPERS INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474304/02/2024
Building Lifecycle
All (19)Filed (3)Permit Issued (2)Signed Off (1)Violation (6)Inspection (2)Objection (2)Special Inspection (3)
03/05/2026
Violation issued (ECB, closed)
Construction
03/05/2026
Violation issued (ECB, closed)
Construction
05/22/2024
Signed off — Alteration
Application filed to install cellar temp. shoring to facilitate partial demolition while replacing existing 1st flr. floor joist at cellar. Under PAA P1 replace cellar partition & wood stair. This amendment to show sistered joist with detail only.
B00880275-I1
05/21/2024
Permit issued — Structural
B00880275-I1-ST
04/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/10/2024
Objection resolved — Addressed
04/09/2024
Objection raised — Scope
04/02/2024
Filed — Alteration
Application filed to install cellar temp. shoring to facilitate partial demolition while replacing existing 1st flr. floor joist at cellar. Under PAA P1 replace cellar partition & wood stair. This amendment to show sistered joist with detail only.
B00880275-P2
04/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
04/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
04/02/2024
Special inspection requirement — Final
XIU CHEN
04/01/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/28/2024
Filed — Alteration
Application filed to install cellar temp. shoring to facilitate partial demolition while replacing existing 1st flr. floor joist at cellar. Under PAA P1 replace cellar partition & wood stair. This amendment to show sistered joist with detail only.
B00880275-P1
10/18/2023
Permit issued — Structural
B00880275-I1-GC
05/31/2023
Filed — Alteration
Application filed to install cellar temp. shoring to facilitate partial demolition while replacing existing 1st flr. floor joist at cellar. Under PAA P1 replace cellar partition & wood stair. This amendment to show sistered joist with detail only.
B00880275-I1
02/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2023
Violation issued (ECB, open)
Construction
02/04/2023
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNEW GLOBE DEVELOPERS INC05/21/2024
DOB NOWStructuralSigned-offNEW GLOBE DEVELOPERS INC10/18/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/01/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/02/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
04/02/2024Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
04/02/2024FinalXIU CHENprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00880275-P1Request digital key ↗
08/27/2026B00880275-I1Request digital key ↗
08/15/2026B00880275-P2Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00880275-P1Open ↗
08/27/2026B00880275-I1Open ↗
08/27/2026B00880275-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00880275-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00880275-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00880275-P1Open ↗
08/27/2026B00880275-I1Open ↗
08/15/2026B00880275-P2Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B00880275-P1Open ↗
08/13/2026B00880275-I1Open ↗
08/13/2026B00880275-P2Open ↗