← Back
Two family frame
139 QUINCY STREET
BROOKLYN · BIN 3056474
💬 Discuss this project
1899Year Built
3Stories
B2Building Class
R6BZoning
2,660 sfGross Floor Area
2Units
Two family frame · 1,875 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 10 docs
Floor 3Under Construction9p · 2 filings · 20 docs
Floor 2Under Construction7p · 1 filing · 18 docs
Floor 1Under Construction8p · 1 filing · 18 docs
CellarUnder Construction11p · 1 filing · 18 docs
BasementUnder Construction7p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2025$1.9M—Private party → Private party$714/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES STOUT ARCHITECT & ASSOCIATES112/30/2025
ANTHONY BONSIGNORE, RA512/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNKEEPER SOLAR ELECTRIC LLC203/21/2026
CITY BUILDING NY ARCHITECT P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROFOUNDSPACE A&D LLCGeneral Contractor104/08/2026
SUNKEEPER SOLAR ELECTRICGeneral Contractor104/09/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES J STOUT ARCHITECTS5913112/30/2025
AVT ENGINEERING345412/05/2025
Building Lifecycle
All (63)Filed (5)Permit Issued (3)Inspection (3)Objection (22)Special Inspection (30)
08/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/02/2026
Permit issued — Solar
B01340874-I1-SL
12/30/2025
Filed — Alteration
B01340874-I1
12/30/2025
Special inspection requirement — Final
JAMES J STOUT
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
12/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
12/30/2025
Special inspection requirement — Post-installed Anchors
JAMES J STOUT
12/30/2025
Special inspection requirement — Maintenance information
JAMES J STOUT
12/30/2025
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
12/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
12/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH PASATURO
12/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH PASATURO
12/05/2025
Filed — Alteration
replace and install new plumbing fixtures on the cellar, basement, 1 thru 3rd floors as per plans filed
B01229307-P1
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH PASATURO
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH PASATURO
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Permit issued — Structural
B01233535-I1-GC-CX
10/03/2025
Filed — Alteration CO
INTERIOR RENOVATION WORK ON THE CELLAR, BASEMENT,1ST, 2ND & 3RD FLOORS, REPLACE WINDOWS, NEW OPEN DECK AT REAR, NEW MECHANICAL EQUIPMENT AND CONVERT BUILDING FROM A 1 FAMILY TO A 2 FAMILY DWELLING.
B01233535-P1
09/23/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
08/20/2025
Permit issued — Plumbing
B01229307-I1-PL
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Other
07/22/2025
Objection raised — Scope
07/22/2025
Objection raised — Other
07/22/2025
Objection raised — Zoning
07/22/2025
Objection raised — Other
07/22/2025
Objection raised — Other
07/22/2025
Objection raised — Zoning
07/22/2025
Objection raised — Zoning
07/22/2025
Objection raised — Zoning
07/22/2025
Objection raised — Scope
07/22/2025
Objection raised — Fire_Protection
07/07/2025
Filed — Alteration CO
INTERIOR RENOVATION WORK ON THE CELLAR, BASEMENT,1ST, 2ND & 3RD FLOORS, REPLACE WINDOWS, NEW OPEN DECK AT REAR, NEW MECHANICAL EQUIPMENT AND CONVERT BUILDING FROM A 1 FAMILY TO A 2 FAMILY DWELLING.
B01233535-I1
07/07/2025
Filed — Alteration
replace and install new plumbing fixtures on the cellar, basement, 1 thru 3rd floors as per plans filed
B01229307-I1
05/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/12/2025
Special inspection requirement — Interior lighting power
05/12/2025
Special inspection requirement — Mechanical Systems
05/12/2025
Special inspection requirement — Structural Steel - Details
05/12/2025
Special inspection requirement — Concrete - Cast-In-Place
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2025
Special inspection requirement — Structural Steel - High Strength Bolting
05/12/2025
Special inspection requirement — Subgrade Inspections
05/12/2025
Special inspection requirement — Final
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNKEEPER SOLAR ELECTRIC01/02/2026
DOB NOWStructuralPermit IssuedPROFOUNDSPACE A&D LLC10/09/2025
DOB NOWPlumbingSigned-offNICE PLUMBING CORP08/20/2025
2 projects · most recent 10/03/2025
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2025Permit IssuedPROFOUNDSPACE A&D LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric 3 UNITS, MOD# MXZ-3624NA3, AND 1 UNIT MOD# MXZ-30NA3 8 tons · Split System ×8
———Air Conditioning Systems
Cooling
Mitsubishi Electric 3-MXZ-3C24NA3 AND 1- MXZ-C30NA3 8 tons · Vrf Outdoor ×4
3 projects · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
09/22/2025CompleteSUNKEEPER SOLAR LLC2 meters, 1 new_meters
09/22/2025CompleteSUNKEEPER SOLAR LLC—
2 projects · most recent 10/03/2025
Steel
FiledStatusContractorScope
10/03/2025Permit IssuedPROFOUNDSPACE A&D LLCSteel
———Steel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/30/2025FinalJAMES J STOUTprogress
12/30/2025Energy Code Compliance InspectionsJAMES J STOUTprogress
12/30/2025Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
12/30/2025Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
12/30/2025Post-installed AnchorsJAMES J STOUTspecial
12/30/2025Maintenance informationJAMES J STOUTenergy_progress
12/30/2025Air barrier - visual inspectionJAMES J STOUTenergy_progress
12/26/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
12/26/2025Energy Code Compliance InspectionsJOSEPH PASATUROprogress
12/26/2025HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
12/26/2025HVAC-R and service water heating system controlsJOSEPH PASATUROenergy_progress
12/26/2025HVAC-R and service water heating equipmentJOSEPH PASATUROenergy_progress
12/02/2025HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
12/02/2025HVAC-R and service water heating system controlsJOSEPH PASATUROenergy_progress
12/02/2025HVAC-R and service water heating equipmentJOSEPH PASATUROenergy_progress
12/02/2025Energy Code Compliance InspectionsJOSEPH PASATUROprogress
12/02/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
05/12/2025HVAC-R and service water heating system controls—energy_progress
05/12/2025Structural Stability – Alterations of existing buildings—special
05/12/2025Interior lighting power—energy_progress
05/12/2025Mechanical Systems—special
05/12/2025Structural Steel - Details—special
05/12/2025Concrete - Cast-In-Place—special
05/12/2025Fire-Resistant Penetrations and Joints—special
05/12/2025Structural Steel - High Strength Bolting—special
Latest 25 of 36.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01233535-I1Request digital key ↗
08/20/2026B01233535-P2Request digital key ↗
08/20/2026B01233535-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01233535-I1Open ↗
08/13/2026B01233535-P1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B01229307-I1Open ↗
09/02/2026B01229307-I1Open ↗
08/24/2026B01340874-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01233535-P2Open ↗
08/20/2026B01233535-P1Open ↗
08/20/2026B01233535-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01229307-I1Open ↗
08/24/2026B01340874-I1Open ↗
08/24/2026B01340874-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/20/2026B01233535-P2Open ↗
08/13/2026B01233535-I1Open ↗
08/13/2026B01233535-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026B01233535-P2Open ↗
08/20/2026B01233535-P1Open ↗
08/20/2026B01233535-I1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/20/2026B01233535-P2Open ↗
08/20/2026B01233535-P1Open ↗
08/20/2026B01233535-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01233535-I1Open ↗