← Back
Miscellaneous two family
139 ST FELIX STREET
BROOKLYN · BIN 3059192
💬 Discuss this project
1858Year Built
2Stories
B9Building Class
R6BZoning
2,360 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · 1,700 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEMO NY1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC508/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SESSA'S LICENSED PLB&HTGPlumbing307/08/2026
PALONE BROTHERS AIRGeneral Contractor203/21/2026
HILTON, TYRONEElectrical103/21/2026
NORTON, DORIONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503508/01/2023
Building Lifecycle
All (38)Filed (5)Permit Issued (4)Signed Off (3)Violation (2)Inspection (2)Special Inspection (22)
08/25/2023
Signed off — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-S1
08/25/2023
Signed off — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-I1
08/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/16/2023
Permit issued — Boiler Equipment
B08003093-S1-BE
08/01/2023
Filed — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-S1
08/01/2023
Filed — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-P2
07/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
07/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
07/31/2023
Special inspection requirement — Heating Systems
PIETRO ROSATO
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
07/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
07/27/2023
Special inspection requirement — Heating Systems
PIETRO ROSATO
07/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/26/2023
Filed — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-P1
06/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
06/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
06/23/2023
Special inspection requirement — Heating Systems
PIETRO ROSATO
06/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
06/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
06/06/2023
Permit issued — Boiler Equipment
B08003093-I1-BE
01/24/2023
Permit issued — Boiler Equipment
B08003093-I1-BE
01/04/2023
Filed — Alteration
Removal of (2 total ) existing gas burning boilers and (2 total) hot water retention tanks, under this application & B08003093-S1. Installation of (2 total) new wall mounted boilers for residential heating needs, under this application & B08003093-S1.
B08003093-I1
01/13/2022
Signed off — Alteration
Installation of (1) 3 ton roof top unit and (1) 1 1/2 ton split-system unit replacement on exact same steel dunnage.
B00631410-I1
01/11/2022
Permit issued — Mechanical Systems
B00631410-I1-MS
01/03/2022
Filed — Alteration
Installation of (1) 3 ton roof top unit and (1) 1 1/2 ton split-system unit replacement on exact same steel dunnage.
B00631410-I1
01/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
01/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
01/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
01/02/2022
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
01/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
11/15/2021
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
11/15/2021
Special inspection requirement — Final
PIETRO ROSATO
10/30/2008
Violation issued (ECB, closed)
Construction
10/30/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSESSA'S LICENSED PLB&HTG08/16/2023
DOB NOWBoiler EquipmentSigned-offSESSA'S LICENSED PLB&HTG06/06/2023
DOB NOWBoiler EquipmentSigned-offSESSA'S LICENSED PLB&HTG01/24/2023
DOB NOWMechanical SystemsSigned-offPALONE BROTHERS AIR01/11/2022
BISOTISSUEDH.D. NOBLE RENOVATION CORP.09/12/2008
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/31/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
07/31/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
07/31/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/31/2023Heating SystemsPIETRO ROSATOspecial
07/31/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/27/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
07/27/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
07/27/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/27/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
07/27/2023Heating SystemsPIETRO ROSATOspecial
06/23/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
06/23/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/23/2023Heating SystemsPIETRO ROSATOspecial
06/23/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
06/23/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
01/02/2022HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
01/02/2022Energy Code Compliance InspectionsPIETRO ROSATOprogress
01/02/2022Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
11/15/2021Mechanical SystemsPIETRO ROSATOspecial
11/15/2021FinalPIETRO ROSATOprogress
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00631410-I1Request digital key ↗
08/28/2026B08003093-P1Request digital key ↗
08/28/2026B08003093-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
11/15/2008310188141Open ↗
08/21/2008310188141Open ↗
▸BISWORK PERMIT APPLICATION2
10/21/2008310188141Open ↗
09/12/2008310188141Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026B00631410-I1Open ↗
08/13/2026B08003093-S1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature14
09/13/2026B08003093-P2Open ↗
09/13/2026B08003093-P2Open ↗
09/13/2026B08003093-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/13/2026B08003093-P2Open ↗
09/13/2026B08003093-P2Open ↗
08/30/2026B00631410-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B08003093-S1Open ↗
08/28/2026B08003093-I1Open ↗
08/28/2026B08003093-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/09/2010310188141Open ↗
08/21/2008310188141Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/21/2008310188141Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/21/2008310188141Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00631410-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
08/21/2008310188141Open ↗
▸BISLANDMARKS APPROVAL1
08/21/2008310188141Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/09/2010310188141Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/09/2010310188141Open ↗
08/21/2008310188141Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/21/2008310188141Open ↗