← Back
Primarily 5-6 family with 1 store or office
192 GRAND STREET
BROOKLYN · BIN 3062793
💬 Discuss this project
1910Year Built
4Stories
S5Building Class
R6BZoning
6,000 sfGross Floor Area
7Units
Rent Stabilized88 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: HATIRJHEEL CORP · 2,075 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 4Under Construction4p · 3 filings · 20 docs
Floor 3Under Construction5p · 4 filings · 20 docs
Floor 21p · 1 filing · 4 docs
Floor 1Under Construction10p · 3 filings · 19 docs
CellarUnder Construction9p · 3 filings · 19 docs
1 job · most recent 02/28/2025
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/28/2025Permit IssuedQUALIFIED CONSTRN INCAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Fujitsu AOU36LUAS1 36,000 BTU · Heat Pump Outdoor ×1
Ventilation
Hoodmart HoodMart 4,500 CFM ×1
Refrigeration
Amerikooler Amerikooler QC060872 6,800 BTU ×2
1 job · most recent 02/28/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/28/2025Permit IssuedKA&C MECH LLCGas, Water/Sanitary
3 jobs · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedRIVIERA ELECTRIC CORPGeneral Wiring
11/20/2025Permit IssuedRIVIERA ELECTRIC CORPGeneral Wiring
09/04/2020Permit IssuedRIVIERA ELECTRIC CORP8 meters, 8 new_meters
Building Lifecycle
All (183)Filed (5)Permit Issued (6)Violation (60)Inspection (9)Objection (80)Special Inspection (23)
08/11/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/03/2026
Permit issued — Plumbing
B01185436-S1-PL
07/27/2026
Objection raised — Fire_Protection
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Other
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Inspections
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Structural
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Structural
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Accessibility
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Other
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Fire_Protection
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Fire_Protection
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Structural
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Open
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Resolved
07/07/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Addressed
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Admin
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Admin
06/10/2026
Objection raised — Admin
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
06/10/2026
Objection raised — Zoning
Latest 60 of 183 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FATHER REALTY109/01/2026
HATIRJHEEL1204/09/2026
SURMA REALTY CORP203/22/2026
SUMA REALTY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE106/02/2026
BASSIRI404/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUALIFIED CONSTRN INCGeneral Contractor504/09/2026
KA&C MECH LLCPlumbing208/26/2026
RIVIERA ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394404/08/2025
MOHAMMAD AHEAD - PROFESSI9286102/28/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKA&C MECH LLC08/03/2026
DOB NOWGeneral ConstructionPermit IssuedQUALIFIED CONSTRN03/09/2026
DOB NOWGeneral ConstructionPermit IssuedQUALIFIED CONSTRN03/09/2026
DOB NOWPlumbingPermit IssuedKA&C MECH LLC07/16/2025
DOB NOWGeneral ConstructionPermit IssuedQUALIFIED CONSTRN07/03/2025
DOB NOWGeneral ConstructionPermit IssuedQUALIFIED CONSTRN07/02/2025
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/11/2026Fail-Final Boiler Equipment InspectionFailView ↗
05/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/16/2025DemolitionMOHAMMAD AHEADspecial
04/08/2025Fenestration air leakageFARHAD BASSIRI-TEHRANIenergy_progress
04/08/2025Fenestration and door U-factor and product ratingsFARHAD BASSIRI-TEHRANIenergy_progress
04/08/2025Lighting in dwelling unitsFARHAD BASSIRI-TEHRANIenergy_progress
04/08/2025Fenestration areasFARHAD BASSIRI-TEHRANIenergy_progress
04/08/2025Interior lighting powerFARHAD BASSIRI-TEHRANIenergy_progress
04/08/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/08/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/08/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/08/2025Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
04/07/2025Structural Stability – Alterations of existing buildingsFARHAD BASSIRI-TEHRANIspecial
02/26/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/26/2025Lighting in dwelling unitsFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Fenestration air leakageFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Interior lighting powerFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Air barrier - visual inspectionFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Lighting controlsFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Fenestration areasFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Fenestration and door U-factor and product ratingsFARHAD BASSIRI-TEHRANIenergy_progress
02/26/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
02/26/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/26/2025Insulation placement and R valuesFARHAD BASSIRI-TEHRANIenergy_progress
02/25/2025Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01185436-S1Request digital key ↗
08/22/2026B01185436-I1Request digital key ↗
08/22/2026B01186969-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01185436-S1Open ↗
08/22/2026B01185436-I1Open ↗
08/16/2026B01410469-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026B01185436-I1Open ↗
08/23/2026B01185436-I1Open ↗
08/23/2026B01207396-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026B01185436-I1Open ↗
08/23/2026B01185436-I1Open ↗
08/23/2026B01207396-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-1: Anti-Harassment Area Checklist5
08/13/2026B01185436-I1Open ↗
08/13/2026B01185436-S1Open ↗
08/13/2026B01186969-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026B01185436-S1Open ↗
08/14/2026B01410469-I1Open ↗
08/13/2026B01207396-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026B01185436-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/14/2026B01410469-I1Open ↗