Primarily 5-6 family with 1 store or office
1073 MANHATTAN AVENUE
BROOKLYN · BIN 3063824
💬 Discuss this project
1930Year Built
4Stories
S5Building Class
R7AZoning
5,499 sfGross Floor Area
7Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: CEHA ASSOCIATES, LLC · 2,500 sf lot · 2.2 FAR built · Flood zone X500
Locations of Work
Plumbing
Floor 41p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HANCOCK ASSOCIATES, LLC1703/22/2026
CEHA ASSOCIATES803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC210/19/2023
ASR ENGINEERING PC110/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC GC CORPGeneral Contractor603/21/2026
G.N. CONSTRUCTION INCGeneral Contractor403/21/2026
SUPERB PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949210/19/2023
Building Lifecycle
All (32)Filed (3)Permit Issued (5)Signed Off (3)Violation (13)Inspection (3)Special Inspection (5)
05/15/2024
Signed off — Alteration
Installation of Exterior Insulation Finish System on the front facade as per plans attached herewith. No change in use, egress and occupancy,
B00943437-I1
04/19/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00942452-I1
02/05/2024
Permit issued — General Construction
B00943437-I1-GC
01/08/2024
Violation issued (ECB, closed)
Construction
01/08/2024
Violation issued (ECB, closed)
Construction
11/15/2023
Permit issued — General Construction
B00943437-I1-GC
10/19/2023
Filed — Alteration
Installation of Exterior Insulation Finish System on the front facade as per plans attached herewith. No change in use, egress and occupancy,
B00943437-I1
10/17/2023
Permit issued — Sidewalk Shed
B00942452-I1-SH
10/17/2023
Permit issued — Supported Scaffold
B00942452-I1-SF
10/11/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
CARL HAMANN
10/11/2023
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
10/11/2023
Special inspection requirement — Insulation placement and R values
CARL HAMANN
10/10/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00942452-I1
10/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
10/04/2023
Special inspection requirement — Final
CARL HAMANN
11/04/2022
Signed off — Alteration
B00351670-I1
09/26/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2022
Permit issued — Plumbing
B00351670-I1-PL
04/14/2022
Filed — Alteration
B00351670-I1
02/13/2021
Violation issued (HPD, open)
C
02/13/2021
Violation issued (HPD, open)
C
02/13/2021
Violation issued (HPD, open)
C
08/29/2020
Violation issued (HPD, open)
C
02/24/2020
Violation issued (HPD, open)
C
12/24/2014
Violation issued (FDNY_ORDER, closed)
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/1996
Violation issued (ECB, closed)
Construction
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDYNAMIC GC CORP02/05/2024
DOB NOWGeneral ConstructionSigned-offDYNAMIC GC CORP11/15/2023
DOB NOWSidewalk ShedSigned-offEMPIRE CONSTRUCTION ASSOC10/17/2023
DOB NOWSupported ScaffoldSigned-offEMPIRE CONSTRUCTION ASSOC10/17/2023
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING05/27/2022
BISOTISSUEDH&T DESIGNS CORP12/10/2021
BISFPISSUEDLUND FIRE PRODUCTS CO INC01/09/2014
BISPLISSUEDERAX PLUMBING, INC02/16/2011
BISOTISSUEDRAY CONSTRUCTION07/13/2010
BISOTISSUEDMETROPOLITAN HEAT & POWER CO01/18/2005
BISPLISSUEDMETROPOLITAN HEAT & POWER CO01/18/2005
3 projects · most recent 10/22/2023
General Wiring
FiledStatusContractorScope
10/22/2023Permit IssuedRICHARD NEU—
08/27/2022CompleteDENMAR ELECTRIC CORPGeneral Wiring
10/16/2019CompleteWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/11/2023Exterior Insulation and Finish Systems (EIFS)CARL HAMANNspecial
10/11/2023Energy Code Compliance InspectionsCARL HAMANNprogress
10/11/2023Insulation placement and R valuesCARL HAMANNenergy_progress
10/09/2023Tenant Protection Plan ComplianceCARL HAMANNspecial
10/04/2023FinalCARL HAMANNprogress
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/26/2026B00942452-I1Request digital key ↗
08/26/2026B00943437-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/30/2026B00351670-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
11/04/2022321633069Open ↗
10/06/2022321633069Open ↗
08/18/2021321633069Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
12/10/2021321633069Open ↗
01/11/2014320816266Open ↗
02/22/2011320178026Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/26/2020321633069Open ↗
04/11/2016321123869Open ↗
05/14/2015321123869Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00943437-I1Open ↗
08/13/2026B00942452-I1Open ↗
08/13/2026B00351670-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00943437-I1Open ↗
08/27/2026B00943437-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00943437-I1Open ↗
08/27/2026B00943437-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/26/2020321633069Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/26/2020321633069Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
05/03/2011320178026Open ↗
▸BISSCHEDULE B - PLUMBING1
06/23/2010320178026Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
05/14/2015321123869Open ↗
03/02/2015321091545Open ↗
▸BISTenant Protection Plan and Notes1
05/26/2020321633069Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00351670-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/26/2020321633069Open ↗
04/12/2016321123869Open ↗
12/23/2013320816266Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00351670-I1Open ↗
08/13/2026B00943437-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/23/2010320178026Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/05/2020321633069Open ↗
04/11/2016321123869Open ↗
05/14/2015321123869Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/21/2022321633069Open ↗
11/21/2022321633069Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/18/2022321633069Open ↗
11/29/2021321633069Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/21/2022321633069Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/18/2022321633069Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/18/2022321633069Open ↗
11/18/2022321633069Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/21/2022321633069Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/11/2014320816266Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/22/2022321633069Open ↗
06/16/2011320178026Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/23/2013320816266Open ↗
06/23/2010320178026Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/14/2015321123869Open ↗
03/02/2015321091545Open ↗
▸BISFINAL1
11/21/2022321633069Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
11/18/2022321633069Open ↗
05/26/2020321633069Open ↗
05/14/2015321123869Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/21/2022321633069Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
05/26/2020321633069Open ↗
05/14/2015321123869Open ↗
03/02/2015321091545Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
11/04/2022321633069Open ↗
08/18/2021321633069Open ↗
03/25/2011320178026Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
05/14/2015321123869Open ↗
▸DOB NOWDHCR Document1
08/13/2026B00351670-I1Open ↗