← Back
Primarily 2 family with 1 store or office
928 MANHATTAN AVENUE
BROOKLYN · BIN 3064607
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R7AZoning
—Gross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 14p · 1 filing · 19 docs
Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REDROVERBK403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS202/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOMINICK SIANO G'NL CONTGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474111/10/2022
Building Lifecycle
All (53)Filed (2)Permit Issued (1)Violation (2)Objection (34)Special Inspection (14)
07/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
07/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
07/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
07/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
06/27/2023
Permit issued — General Construction
B08036576-I1-GC
02/13/2023
Filed — Alteration
Application filed to renovate existing commercial store with work to include removal of ex. partition, new partitions, bar, exterior door within enlarged window opening, replace finish floor, patch, firestop and paint ceiling & walls. No change to use, eg
B08036576-S1
02/13/2023
Objection raised — Scope
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Admin
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Admin
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Scope
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Inspections
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Structural
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Scope
02/13/2023
Objection resolved — Addressed
02/08/2023
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Fire_Protection
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Admin
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Cost
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
12/02/2022
Objection resolved — Addressed
12/02/2022
Objection raised — Structural
12/02/2022
Objection resolved — Addressed
12/01/2022
Objection raised — Accessibility
12/01/2022
Objection resolved — Addressed
12/01/2022
Objection raised — Fire_Protection
12/01/2022
Objection resolved — Addressed
12/01/2022
Objection raised — Other
12/01/2022
Objection resolved — Addressed
11/10/2022
Filed — Alteration
Application filed to renovate existing commercial store with work to include removal of ex. partition, new partitions, bar, exterior door within enlarged window opening, replace finish floor, patch, firestop and paint ceiling & walls. No change to use, eg
B08036576-I1
11/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Fenestration air leakage
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Lighting controls
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Interior lighting power
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Fenestration areas
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
11/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDOMINICK SIANO G'NL CONT06/27/2023
BISEQISSUEDDEO LLC01/28/2000
BISOTISSUEDDEO LLC01/28/2000
1 project · most recent 02/13/2023
Water/Sanitary
FiledStatusContractorScope
02/13/2023——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/18/2023HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
07/18/2023HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
07/18/2023HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
07/18/2023Tenant Protection Plan Compliance—special
02/08/2023Energy Code Compliance InspectionsPHILIP TOSCANOprogress
11/08/2022Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
11/08/2022Fenestration air leakagePHILIP TOSCANOenergy_progress
11/08/2022Lighting controlsPHILIP TOSCANOenergy_progress
11/08/2022Interior lighting powerPHILIP TOSCANOenergy_progress
11/08/2022Fenestration areasPHILIP TOSCANOenergy_progress
11/08/2022Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
11/08/2022Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
11/08/2022Energy Code Compliance InspectionsPHILIP TOSCANOprogress
11/08/2022Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B08036576-I1Request digital key ↗
08/15/2026B08036576-S1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B08036576-I1Open ↗
09/01/2026B08036576-I1Open ↗
09/01/2026B08036576-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B08036576-I1Open ↗
08/13/2026B08036576-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B08036576-I1Open ↗
09/01/2026B08036576-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B08036576-I1Open ↗
08/13/2026B08036576-S1Open ↗