← Back
Primarily 5-6 family with 1 store or office
773 GRAND STREET
BROOKLYN · BIN 3069494
💬 Discuss this project
1920Year Built
4Stories
S5Building Class
C4-4AZoning
5,500 sfGross Floor Area
7Units
Rent Stabilized22 Open Violations 21 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 298 HUMBOLDT, LLC · 1,875 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 2 filings · 18 docs
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1250 38 STREET2307/08/2026
298 HUMBOLDT, LLC103/22/2026
TRI-NORTH BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CORNERSTONE ENGINEERING, INC.101/11/2024
SCHAEFER INC208/18/2023
LEON SKVIRSKY PE104/12/2023
LBI, LLC208/02/2022
CESO ARCHITECTS, INC.107/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP503/21/2026
UNIVERSAL SIGNS SERVICE203/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI-NORTH BUILDERS,INCGeneral Contractor507/08/2026
UNIVERSAL SIGNS & SERVICEGeneral Contractor303/21/2026
ROOPCHAND SINGHElectrical103/21/2026
PAUL SIGNS INCGeneral Contractor107/08/2026
LIPSKY & ROSENTHAL, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRO INSPECTIONS LLC7363101/11/2024
CROSSCHECK INSPECTION SER544408/18/2023
ROBERT PAPAZIAN ARCHITECT3491104/12/2023
Building Lifecycle
All (101)Filed (7)Permit Issued (6)Signed Off (5)Violation (39)Inspection (2)Objection (16)Special Inspection (26)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
03/03/2025
Violation issued (HPD, open)
C
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
03/03/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, closed)
I
11/17/2024
Violation issued (HPD, open)
C
11/17/2024
Violation issued (HPD, closed)
C
11/17/2024
Violation issued (HPD, open)
B
11/17/2024
Violation issued (HPD, open)
C
11/17/2024
Violation issued (HPD, open)
B
11/13/2024
Signed off — Alteration
TENANT IMPROVEMENTS OF AN EXISTING FIRST FLOOR LEASE SPACE, WITHIN A MIXED USE BUILDING AS SHOWN ON PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00689038-I1
11/12/2024
Signed off — Alteration
Filing for installation of plumbing fixtures as shown on drawings submitted herewith. No change in use, egress or occupancy.
B00689067-I1
11/12/2024
Signed off — Alteration
B00689077-I1
11/12/2024
Signed off — Alteration
Filing for the installation of mechanical equipment along with associated ductwork as shown on plans submitted herewith. No change in use, egress or occupancy.
B00689073-I1
04/10/2024
Violation issued (HPD, closed)
A
03/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2024
Permit issued — General Construction
B00975836-I1-GC
01/11/2024
Filed — Alteration
INSTALL STOREFRONT AWNING WITH NON-ILLUMINATED COPY READING "AMAZON HUB". COPY NOT TO EXCEED 12 SQ FT TOTAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00975836-I1
01/10/2024
Special inspection requirement — Final
James King III
01/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL ADLY
11/17/2023
Violation issued (HPD, closed)
I
11/09/2023
Violation issued (HPD, open)
C
11/09/2023
Violation issued (HPD, open)
C
11/09/2023
Violation issued (HPD, closed)
C
08/22/2023
Permit issued — Structural
B00689077-I1-ST
08/22/2023
Violation issued (ECB, open)
Construction
08/22/2023
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
08/22/2023
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
08/22/2023
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/22/2023
Special inspection requirement — Final
EUGENE BIFULCO
08/22/2023
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
08/22/2023
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
08/18/2023
Filed — Alteration
B00689077-P1
08/15/2023
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
08/15/2023
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
08/15/2023
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
08/15/2023
Special inspection requirement — Final
EUGENE BIFULCO
08/15/2023
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
07/13/2023
Signed off — Alteration
B00850238-I1
07/06/2023
Permit issued — Mechanical Systems
B00689073-I1-MS
06/30/2023
Permit issued — Plumbing
B00689067-I1-PL
06/12/2023
Permit issued — General Construction
B00689038-I1-GC
05/11/2023
Permit issued — General Construction
B00850238-I1-GC
04/12/2023
Filed — Alteration
B00850238-I1
03/23/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/15/2022
Objection raised — Admin
08/15/2022
Objection resolved — Addressed
08/15/2022
Objection raised — Zoning
08/15/2022
Objection resolved — Addressed
08/15/2022
Objection raised — Zoning
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUNIVERSAL SIGNS & SERVICE01/25/2024
DOB NOWStructuralPermit IssuedTRI-NORTH BUILDERS,INC08/22/2023
DOB NOWMechanical SystemsSigned-offTRI-NORTH BUILDERS,INC07/06/2023
DOB NOWPlumbingSigned-offA&M WARSHAW PLUMBNG & HTG06/30/2023
DOB NOWGeneral ConstructionSigned-offTRI-NORTH BUILDERS,INC06/12/2023
DOB NOWGeneral ConstructionSigned-offPAUL SIGNS INC05/11/2023
BISOTISSUEDPARK REMODELING LLC08/18/2016
BISPLISSUEDNCA PLUMBING&HEATING LLC06/23/2016
BISOTISSUEDPARK REMODELING LLC06/17/2016
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/10/2024FinalJames King IIIprogress
01/04/2024Tenant Protection Plan ComplianceDANIEL ADLYspecial
08/22/2023Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
08/22/2023Structural Steel - WeldingEUGENE BIFULCOspecial
08/22/2023Post-installed AnchorsEUGENE BIFULCOspecial
08/22/2023FinalEUGENE BIFULCOprogress
08/22/2023Structural Steel - DetailsEUGENE BIFULCOspecial
08/22/2023Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
08/15/2023Post-installed AnchorsEUGENE BIFULCOspecial
08/15/2023Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
08/15/2023Structural Steel - DetailsEUGENE BIFULCOspecial
08/15/2023Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
08/15/2023FinalEUGENE BIFULCOprogress
08/15/2023Structural Steel - WeldingEUGENE BIFULCOspecial
09/06/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/15/2022Interior lighting powerBRADY HARDINGenergy_progress
07/15/2022Lighting controlsBRADY HARDINGenergy_progress
07/01/2022Maintenance informationEUGENE BIFULCOenergy_progress
03/02/2022Energy Code Compliance InspectionsBRADY HARDINGprogress
03/02/2022FinalBRADY HARDINGprogress
03/02/2022HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/02/2022HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
03/02/2022HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/02/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/28/2022Mechanical SystemsEUGENE BIFULCOspecial
Latest 25 of 26.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00850238-I1Request digital key ↗
08/27/2026B00689077-P1Request digital key ↗
08/27/2026B00689077-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION4
01/25/2017321404235Open ↗
01/18/2017321404235Open ↗
01/12/2017321404235Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
01/24/2017321404235Open ↗
01/24/2017321404235Open ↗
12/05/2016321404235Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/23/2016321404235Open ↗
06/17/2016321404235Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026B00975836-I1Open ↗
09/07/2026B00689038-I1Open ↗
09/07/2026B00689038-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00850238-I1Open ↗
08/27/2026B00689077-I1Open ↗
08/26/2026B00975836-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/13/2017321404235Open ↗
02/13/2017321404235Open ↗
02/08/2017321404235Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/22/2026B00975836-I1Open ↗
09/07/2026B00689038-I1Open ↗
08/30/2026B00689077-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/17/2016321404235Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/17/2016321404235Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/12/2017321404235Open ↗
12/14/2016321404235Open ↗
12/12/2016321404235Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00689077-I1Open ↗
08/26/2026B00975836-I1Open ↗
08/13/2026B00689073-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/13/2017321404235Open ↗
02/13/2017321404235Open ↗
02/08/2017321404235Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00689073-I1Open ↗
08/13/2026B00689038-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/13/2017321404235Open ↗
02/08/2017321404235Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/17/2016321404235Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/17/2022321404235Open ↗
08/12/2022321404235Open ↗
02/13/2017321404235Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/15/2016321404235Open ↗