General warehouse
242 RICHARDSON STREET
BROOKLYN · BIN 3069998
💬 Discuss this project
1930Year Built
2Stories
E1Building Class
R6BZoning
9,000 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
General warehouse · Owner of record: 242 RICHARDSON ST · 10,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 2 filings · 13 docs
Floor 1Under Construction3p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
242 RICHARDSON ST203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS406/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474106/24/2026
Building Lifecycle
All (44)Filed (4)Permit Issued (1)Violation (3)Objection (26)Special Inspection (10)
07/22/2026
Permit issued — General Construction
B01420966-I1-GC
06/24/2026
Filed — Alteration
APPLICATION FILED TO DISMISS VIOLATION #39156437R. WORK CONSISTS OF INSTALLATION OF FIREPROOFING GYPSUM WALLBOARD & INSULATION AT WALLS, CEILING & ROOF. REMOVE NON-LOAD BEARING FIRST FLOOR WOOD STUDS. NO CHANGE TO USE, EGRESS, NOR OCCUPANCY.
B01420966-I1
04/16/2026
Objection resolved — Resolved
03/16/2026
Special inspection requirement — Maintenance information
PHILIP TOSCANO
03/05/2026
Objection resolved — Resolved
03/05/2026
Objection resolved — Resolved
03/02/2026
Objection resolved — Resolved
03/02/2026
Objection resolved — Resolved
03/02/2026
Objection resolved — Resolved
03/02/2026
Objection resolved — Resolved
03/02/2026
Objection resolved — Resolved
02/26/2026
Objection raised — Structural
02/26/2026
Objection raised — Structural
02/26/2026
Objection raised — Structural
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Structural
02/26/2026
Objection raised — Admin
02/26/2026
Objection raised — Other
02/26/2026
Objection raised — Admin
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/25/2026
Objection raised — Structural
02/25/2026
Objection raised — Structural
02/25/2026
Objection raised — Zoning
02/25/2026
Objection raised — Structural
02/12/2026
Filed — Alteration CO
APPLICATION FILED TO DISMISS VIOLATION # 39156438Z & #39156437R. WORK CONSISTS OF A CHANGE IN OCCUPANCY FROM CLASS B2 TO B1 WAREHOUSE STORAGE OF COMBUSTIBLE MATERIALS AND INSTALLATION OF FIREPROOFING. SUBSEQUENT APPLICATIONS FILE FOR PLUMBING & SPRINKLER
B01323647-S2
02/12/2026
Filed — Alteration CO
APPLICATION FILED TO DISMISS VIOLATION # 39156438Z & #39156437R. WORK CONSISTS OF A CHANGE IN OCCUPANCY FROM CLASS B2 TO B1 WAREHOUSE STORAGE OF COMBUSTIBLE MATERIALS AND INSTALLATION OF FIREPROOFING. SUBSEQUENT APPLICATIONS FILE FOR PLUMBING & SPRINKLER
B01323647-S1
02/11/2026
Special inspection requirement — Sprinkler Systems
02/09/2026
Objection resolved — Addressed
01/13/2026
Objection raised — Structural
01/13/2026
Objection raised — Scope
01/13/2026
Objection raised — Admin
01/13/2026
Objection raised — Plumbing
01/13/2026
Objection raised — Scope
12/17/2025
Filed — Alteration CO
APPLICATION FILED TO DISMISS VIOLATION # 39156438Z & #39156437R. WORK CONSISTS OF A CHANGE IN OCCUPANCY FROM CLASS B2 TO B1 WAREHOUSE STORAGE OF COMBUSTIBLE MATERIALS AND INSTALLATION OF FIREPROOFING. SUBSEQUENT APPLICATIONS FILE FOR PLUMBING & SPRINKLER
B01323647-I1
11/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/24/2025
Special inspection requirement — Lighting controls
11/24/2025
Special inspection requirement — Interior lighting power
11/24/2025
Special inspection requirement — Insulation placement and R values
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
08/07/2025
Violation issued (ECB, open)
Construction
08/07/2025
Violation issued (ECB, open)
Construction
11/15/2022
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedACE GROUP NY CORP07/22/2026
1 project · most recent 10/03/2025
HVAC Wiring
FiledStatusContractorScope
10/03/2025Permit IssuedALTO ELECTRIC INCHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/16/2026Maintenance informationPHILIP TOSCANOenergy_progress
02/26/2026HVAC-R and service water piping design and insulation—energy_progress
02/11/2026Sprinkler Systems—special
11/24/2025Fire-Resistance Rated Construction—progress
11/24/2025Structural Stability – Alterations of existing buildings—special
11/24/2025Lighting controls—energy_progress
11/24/2025Interior lighting power—energy_progress
11/24/2025Insulation placement and R values—energy_progress
11/24/2025Fire-Resistant Penetrations and Joints—special
11/24/2025Energy Code Compliance Inspections—progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026B01420966-I1Request digital key ↗
08/15/2026B01323647-S1Request digital key ↗
08/15/2026B01323647-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026B01420966-I1Open ↗
08/13/2026B01323647-S1Open ↗
08/13/2026B01323647-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01323647-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026B01420966-I1Open ↗
08/13/2026B01323647-I1Open ↗
08/13/2026B01323647-S2Open ↗
Showing 3 of 4 on file for this type