← Back
Three families
31 ORIENT AVENUE
BROOKLYN · BIN 3070248
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,700 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 31 ORIENT AVENUE LLC · 2,500 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof23p · 1 filing · 20 docs
Floor 315p · 1 filing · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Sub-Basement14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLANK PROPERTY GROUP2107/08/2026
31 ORIENT AVENUE LLC103/22/2026
BOXWOOD CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2021$1.9M—— → —$685/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS904/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOXWOOD CONSTRUCTION LLCGeneral Contractor1207/08/2026
VIRGINIA LIGHTING FIXTURE 001487General Contractor703/22/2026
VIRGINIA LIGHTING FIXTUREElectrical203/22/2026
STARLITE PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474904/25/2023
Building Lifecycle
All (62)Filed (9)Permit Issued (9)Signed Off (1)Violation (10)Inspection (3)Special Inspection (30)
06/10/2025
Violation issued (HPD, closed)
A
04/25/2023
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-P2
04/11/2023
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-P5
04/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
04/11/2023
Special inspection requirement — Metering
PHILIP TOSCANO
04/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
04/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
04/11/2023
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
04/11/2023
Special inspection requirement — Maintenance information
PHILIP TOSCANO
04/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
03/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
03/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
03/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
03/28/2023
Special inspection requirement — Maintenance information
PHILIP TOSCANO
03/28/2023
Special inspection requirement — Metering
PHILIP TOSCANO
03/24/2023
Violation issued (HPD, closed)
A
03/21/2023
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-P4
03/13/2023
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-P3
03/08/2023
Special inspection requirement — Mechanical Systems
PHILIP TOSCANO
03/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
03/08/2023
Special inspection requirement — Final
PHILIP TOSCANO
03/08/2023
Special inspection requirement — Heating Systems
PHILIP TOSCANO
03/06/2023
Permit issued — Plumbing
B00537283-S1-PL
01/05/2023
Signed off — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-S3
12/22/2022
Permit issued — General Construction
B00537283-I1-GC
11/07/2022
Violation issued (HPD, closed)
I
11/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2022
Special inspection requirement — Fenestration areas
PHILIP TOSCANO
04/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2022
Permit issued — Plumbing
B00537283-S1-PL
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (ECB, closed)
Construction
01/27/2022
Special inspection requirement — Interior lighting power
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Fenestration air leakage
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Lighting controls
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Final
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Lighting in dwelling units
PHILIP TOSCANO
01/27/2022
Special inspection requirement — Insulation placement and R values
PHILIP TOSCANO
01/26/2022
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-P1
12/29/2021
Permit issued — General Construction
B00537283-I1-GC
12/28/2021
Permit issued — Protection and Mechanical Methods
B00537283-S3-PM
12/28/2021
Permit issued — Mechanical Systems
B00537283-S2-MS
10/18/2021
Permit issued — Protection and Mechanical Methods
B00537283-S3-PM
10/18/2021
Permit issued — Mechanical Systems
B00537283-S2-MS
10/12/2021
Permit issued — General Construction
B00537283-I1-GC
08/27/2021
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-S1
08/27/2021
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-S2
08/25/2021
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-S3
06/23/2021
Filed — Alteration
APPLICATION FILED FOR MODIFICATION AND NEW INSTALLTION OF PLUMBING FIXTURES FILED IN CONJUNCTION WITH GUT/REHAB GC#B00537283-I1 & MS#B00537283-S2. NO CHANGE TO USE EGRESS NOR OCCUPANCY.
B00537283-I1
04/12/2021
Violation issued (HPD, closed)
A
11/14/2016
Violation issued (HPD, closed)
I
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offB-EZ PLUMBING & HTG CORP03/06/2023
DOB NOWGeneral ConstructionPermit IssuedBOXWOOD CONSTRUCTION LLC12/22/2022
DOB NOWPlumbingSigned-offB-EZ PLUMBING & HTG CORP03/02/2022
DOB NOWGeneral ConstructionPermit IssuedBOXWOOD CONSTRUCTION LLC12/29/2021
DOB NOWProtection and Mechanical MethodsSigned-offBOXWOOD CONSTRUCTION LLC12/28/2021
DOB NOWMechanical SystemsSigned-offBOXWOOD CONSTRUCTION LLC12/28/2021
DOB NOWProtection and Mechanical MethodsSigned-offBOXWOOD CONSTRUCTION LLC10/18/2021
DOB NOWMechanical SystemsSigned-offBOXWOOD CONSTRUCTION LLC10/18/2021
DOB NOWGeneral ConstructionPermit IssuedBOXWOOD CONSTRUCTION LLC10/12/2021
1 project · most recent 04/25/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/25/2023Signed-offB-EZ PLUMBING & HTG CORPGas, Water/Sanitary
1 project · most recent 04/25/2023
General Wiring
FiledStatusContractorScope
04/25/2023CompleteVIRGINIA LIGHTING FIXTUREGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
04/11/2023Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
04/11/2023MeteringPHILIP TOSCANOenergy_progress
04/11/2023HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
04/11/2023HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
04/11/2023Energy Code Compliance InspectionsPHILIP TOSCANOprogress
04/11/2023Maintenance informationPHILIP TOSCANOenergy_progress
04/11/2023HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
03/28/2023HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
03/28/2023HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
03/28/2023Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
03/28/2023Energy Code Compliance InspectionsPHILIP TOSCANOprogress
03/28/2023HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
03/28/2023Maintenance informationPHILIP TOSCANOenergy_progress
03/28/2023MeteringPHILIP TOSCANOenergy_progress
03/08/2023Mechanical SystemsPHILIP TOSCANOspecial
03/08/2023HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
03/08/2023FinalPHILIP TOSCANOprogress
03/08/2023Heating SystemsPHILIP TOSCANOspecial
05/16/2022Fenestration areasPHILIP TOSCANOenergy_progress
01/27/2022Interior lighting powerPHILIP TOSCANOenergy_progress
01/27/2022Fenestration air leakagePHILIP TOSCANOenergy_progress
01/27/2022Lighting controlsPHILIP TOSCANOenergy_progress
01/27/2022FinalPHILIP TOSCANOprogress
01/27/2022Fenestration and door U-factor and product ratingsPHILIP TOSCANOenergy_progress
01/27/2022Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
Latest 25 of 53.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00537283-I1Request digital key ↗
09/01/2026B00537283-P5Request digital key ↗
09/01/2026B00537283-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature33
09/17/2026B00537283-P2Open ↗
09/17/2026B00537283-P2Open ↗
09/17/2026B00537283-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/17/2026B00537283-P2Open ↗
09/17/2026B00537283-P2Open ↗
09/01/2026B00537283-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00537283-I1Open ↗
09/01/2026B00537283-P5Open ↗
09/01/2026B00537283-P4Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00537283-S2Open ↗
09/01/2026B00537283-S1Open ↗
09/01/2026B00537283-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00537283-S2Open ↗