One story retail building
84 BELMONT AVENUE
BROOKLYN · BIN 3081149
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R6Zoning
2,500 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: CORNBREAD BROWNSVILLE LLC · 2,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 16 docs
Floor 1Under Construction35p · 5 filings · 19 docs
MezzanineUnder Construction4p · 1 filing · 3 docs
CellarUnder Construction5p · 1 filing · 3 docs
Sub-BasementUnder Construction7p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARRYS BELMONT INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ENGINEERING PC107/02/2026
JARMEL KIZEL ARCHITECTS & ENGINEERS505/13/2026
JOADEM CORPORATION202/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP403/21/2026
A1 EXPEDITING SERVICE CORP.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COOPER WORKS INCGeneral Contractor608/26/2026
MHM CONSTRUCTION NYC INCGeneral Contractor303/21/2026
ROOPCHAND SINGHElectrical103/21/2026
HESO ELECTRICAL INCElectrical103/22/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
ACCURATE MECHANICAL INCFire Protection107/25/2026
MICHAEL KATZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291107/02/2026
METROSPEC SIA6420405/13/2026
JOADEM CORPORATION4350202/13/2023
Building Lifecycle
All (63)Filed (8)Permit Issued (9)Signed Off (1)Violation (6)Inspection (7)Objection (2)Special Inspection (30)
08/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2026
Permit issued — General Construction
B01109064-I1-GC
08/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/28/2026
Permit issued — General Construction
B01109064-I1-GC
07/28/2026
Permit issued — Mechanical Systems
B01109067-I1-MS
07/24/2026
Permit issued — Sprinklers
B01372463-I1-EW-SP
07/02/2026
Filed — Alteration
Modification to existing sprinkler systems. No change in use, egress or occupancy.
B01372463-I1
05/14/2026
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
05/14/2026
Special inspection requirement — Shutoff dampers
JOSEPH YOUNG
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
05/14/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
05/14/2026
Special inspection requirement — Final
JOSEPH YOUNG
05/13/2026
Filed — Alteration
Modification to HVAC systems. No change in use, egress or occupancy.
B01109067-P1
04/15/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/25/2025
Permit issued — Plumbing
B01174055-I1-PL
08/15/2025
Permit issued — Structural
B01109338-I1-ST
08/11/2025
Permit issued — General Construction
B01109064-I1-GC
08/11/2025
Permit issued — Mechanical Systems
B01109067-I1-MS
04/15/2025
Filed — Alteration
Modification to HVAC systems. No change in use, egress or occupancy.
B01109067-I1
04/09/2025
Filed — Alteration
Modification to existing structural systems as per plans filed. No change in use, egress or occupancy.
B01109338-I1
04/04/2025
Filed — Alteration
Modification to existing plumbing systems. No change in use, egress or occupancy.
B01174055-I1
04/02/2025
Filed — Alteration
Removal and renovation of interior non-load bearing partitions as per plans filed herewith.
B01109064-I1
03/31/2025
Violation issued (FDNY_NOV, closed)
03/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Fenestration air leakage
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Insulation placement and R values
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Fenestration areas
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Structural Steel - Welding
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH YOUNG
03/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH YOUNG
03/20/2025
Special inspection requirement — Structural Steel - Details
JOSEPH YOUNG
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH YOUNG
09/10/2024
Special inspection requirement — Final
JOSEPH YOUNG
09/10/2024
Special inspection requirement — Final
JOSEPH YOUNG
08/02/2024
Violation issued (FDNY_NOV, closed)
04/17/2024
Signed off — Alteration
Replace damaged wooden joists on the 1st-floor and the roof. No change in use, egress or occupency.
B00604757-I1
08/21/2023
Violation issued (FDNY_NOV, closed)
02/28/2023
Special inspection requirement — Wood – Prefabricated I-Joists
OLULADE ADEMOKUN
02/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
OLULADE ADEMOKUN
02/28/2023
Special inspection requirement — Final
KAMRUZ ZAMAN
02/28/2023
Special inspection requirement — Masonry
OLULADE ADEMOKUN
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
02/27/2023
Objection resolved — Addressed
02/14/2023
Objection raised — Scope
02/13/2023
Filed — Alteration
Replace damaged wooden joists on the 1st-floor and the roof. No change in use, egress or occupency.
B00604757-P1
02/10/2023
Special inspection requirement — Masonry
02/10/2023
Special inspection requirement — Wood – Prefabricated I-Joists
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
02/01/2023
Special inspection requirement — Final
OLULADE ADEMOKUN
09/14/2022
Permit issued — Structural
B00604757-I1-ST
10/21/2021
Filed — Alteration
Replace damaged wooden joists on the 1st-floor and the roof. No change in use, egress or occupency.
B00604757-I1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCOOPER WORKS INC08/12/2026
DOB NOWGeneral ConstructionPermit IssuedCOOPER WORKS INC07/28/2026
DOB NOWMechanical SystemsPermit IssuedCOOPER WORKS INC07/28/2026
DOB NOWSprinklersPermit IssuedACCURATE MECHANICAL INC07/24/2026
DOB NOWPlumbingPermit IssuedANTHONY DISABATO08/25/2025
DOB NOWStructuralPermit IssuedCOOPER WORKS08/15/2025
DOB NOWGeneral ConstructionPermit IssuedCOOPER WORKS08/11/2025
DOB NOWMechanical SystemsPermit IssuedCOOPER WORKS08/11/2025
DOB NOWStructuralSigned-offMHM CONSTRUCTION NYC INC09/14/2022
1 project · most recent 05/13/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026Permit IssuedCOOPER WORKS INCAir Conditioning Systems, Ventilation Systems
Cooling
Carrier 48FCEM08 90,470 BTU · Rooftop Unit ×4
Ventilation
Captiveaire A2-D250-20D 2,000 CFM · Kitchen Exhaust ×2
DU85HFA 1,900 CFM · Exhaust Fan ×1
DU8SHFA 2,000 CFM · Exhaust Fan ×1
1 project · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026Permit IssuedACCURATE MECHANICAL INC—
1 project · most recent 04/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2025Permit IssuedQPR MECHANICAL INCGas, Water/Sanitary
1 project · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025Permit IssuedHESO ELECTRICAL INCGeneral Wiring
1 project · most recent 04/09/2025
Steel
FiledStatusContractorScope
04/09/2025Permit IssuedCOOPER WORKS INCSteel
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/14/2026Mechanical SystemsJOSEPH YOUNGspecial
05/14/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
05/14/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
05/14/2026Shutoff dampersJOSEPH YOUNGenergy_progress
05/14/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
05/14/2026Maintenance informationJOSEPH YOUNGenergy_progress
05/14/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
05/14/2026FinalJOSEPH YOUNGprogress
03/25/2025Fenestration and door U-factor and product ratingsJOSEPH YOUNGenergy_progress
03/25/2025Fenestration air leakageJOSEPH YOUNGenergy_progress
03/25/2025Energy Code Compliance InspectionsJOSEPH YOUNGprogress
03/25/2025Insulation placement and R valuesJOSEPH YOUNGenergy_progress
03/25/2025Fenestration areasJOSEPH YOUNGenergy_progress
03/25/2025Structural Steel - WeldingJOSEPH YOUNGspecial
03/25/2025Structural Steel - High Strength BoltingJOSEPH YOUNGspecial
03/25/2025Structural Stability – Alterations of existing buildingsJOSEPH YOUNGspecial
03/20/2025Structural Steel - DetailsJOSEPH YOUNGspecial
02/06/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
02/06/2025Fire-Resistance Rated ConstructionJOSEPH YOUNGprogress
09/10/2024FinalJOSEPH YOUNGprogress
09/10/2024FinalJOSEPH YOUNGprogress
02/28/2023Wood – Prefabricated I-JoistsOLULADE ADEMOKUNspecial
02/28/2023Structural Stability – Alterations of existing buildingsOLULADE ADEMOKUNspecial
02/28/2023FinalKAMRUZ ZAMANprogress
02/28/2023MasonryOLULADE ADEMOKUNspecial
Latest 25 of 31.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00604757-I1Request digital key ↗
08/22/2026B01109064-I1Request digital key ↗
08/22/2026B01109338-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature8
08/25/2026B00604757-P1Open ↗
08/25/2026B00604757-P1Open ↗
08/24/2026B01109338-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00604757-P1Open ↗
08/31/2026B00604757-I1Open ↗
08/22/2026B01109064-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026B00604757-P1Open ↗
08/24/2026B01109338-I1Open ↗
08/23/2026B00604757-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/22/2026B01109064-I1Open ↗
08/17/2026B01109067-I1Open ↗
08/13/2026B01109338-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01372463-I1Open ↗