← Back
Elevator apt, semi-fireproof without stores
470 OCEAN AVENUE
BROOKLYN · BIN 3116536
💬 Discuss this project
1949Year Built
6Stories
D1Building Class
R7AZoning
121,636 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized411 Open Violations 399 unresolved · 12 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 470 REALTY NY LLC · 30,000 sf lot · 4.05 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES309/13/2026
TOPLINE NYC CONTRACTING303/22/2026
470 REALTY NY LLC3803/22/2026
SENTRY ELEVATOR CORP103/22/2026
470 REALTY LLC103/22/2026
470 REALTY NO LLC103/22/2026
PINNACLE MANAGEMENT203/22/2026
NEISS MANAGEMENT503/22/2026
NIESS MANAGEMENT103/22/2026
470 OCEAN LIMITED LIA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CORP108/06/2026
RCGA ARCHITECTS, P.C207/10/2026
MCHENERY TESTING LAB105/15/2026
MOHAMMAD AHEAD, PE103/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor208/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ PROFESSIONAL ENGINEERI766107/10/2026
Building Lifecycle
All (84)Filed (5)Permit Issued (3)Signed Off (1)Violation (60)Objection (8)Special Inspection (7)
09/02/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/14/2026
Objection raised — Other
08/10/2026
Permit issued — Sidewalk Shed
B01402848-I1-SH
08/07/2026
Objection resolved — Resolved
08/06/2026
Filed — Alteration
REPAIR THE DAMAGED, SPALLING AND DELAMINATED CONCRETE FLOOR OF THE BALCONY AS PER THE DETAILS PROVIDED. REPAIR OR REPLACE THE STEEL BEAM BASED ON INSPECTION FINDINGS AND ENGINEER'S RECOMMENDATION. REPAIR THE MASONRY CRACKS AT THE BALCONY.
B01437892-I1
07/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2026
Objection raised — Other
07/10/2026
Filed — Alteration
Installation of washer and dryer. No change in use, egress and occupancy.
B01422943-I1
07/10/2026
Filed — Alteration
Installation of washer and dryer. No change in use, egress and occupancy.
B01422943-S1
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
VIJAY KUMAR
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
VIJAY KUMAR
07/06/2026
Violation issued (ECB, open)
Elevators
07/02/2026
Violation issued (HPD, closed)
C
07/02/2026
Violation issued (HPD, open)
C
07/02/2026
Violation issued (HPD, closed)
C
06/11/2026
Violation issued (ECB, closed)
Elevators
06/10/2026
Violation issued (HPD, closed)
A
06/10/2026
Violation issued (HPD, closed)
C
06/01/2026
Violation issued (HPD, closed)
A
05/30/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (ECB, open)
Construction
05/27/2026
Violation issued (ECB, open)
Construction
05/27/2026
Violation issued (ECB, open)
Construction
05/27/2026
Violation issued (ECB, closed)
Construction
05/27/2026
Violation issued (ECB, open)
Construction
05/27/2026
Violation issued (ECB, open)
Construction
05/17/2026
Violation issued (HPD, closed)
C
05/17/2026
Violation issued (HPD, closed)
C
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
C
05/17/2026
Violation issued (HPD, closed)
C
05/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01402848-I1
05/15/2026
Permit issued — Sidewalk Shed
B01402848-I1-SH
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
A
05/15/2026
Violation issued (HPD, closed)
B
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC08/10/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/15/2026
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING03/31/2022
BISFSISSUEDNEAL M. RUDIKOFF05/23/1996
1 project · most recent 07/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/10/2026——Gas, Water/Sanitary
1 project · most recent 05/15/2026
FiledStatusContractorScope
05/15/2026Permit IssuedRICHARD NEU—
1 project · most recent 05/15/2026
Sidewalk Shed
FiledStatusContractorScope
05/15/2026Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/29/2026Fire-Resistance Rated Construction—progress
07/29/2026Fire-Resistant Penetrations and Joints—special
07/29/2026Tenant Protection Plan Compliance—special
07/09/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
07/09/2026Tenant Protection Plan ComplianceVIJAY KUMARspecial
07/09/2026Energy Code Compliance InspectionsVIJAY KUMARprogress
03/26/2022FinalMOHAMMAD AHEADprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/30/2026B00707001-I1Request digital key ↗
08/17/2026B01402848-I1Request digital key ↗
08/16/2026B01437892-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/30/2015321289609Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01402848-I1Open ↗
08/16/2026B01437892-I1Open ↗
08/13/2026B00707001-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01422943-S1Open ↗
08/26/2026B00707001-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/30/2015321289609Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01422943-S1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/30/2015321289609Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
12/30/2015321289609Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/30/2015321289609Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/30/2015321289609Open ↗