← Back
Three families
1025 41 STREET
BROOKLYN · BIN 3135420
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
Rent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 1025 41ST STREET LLC · 2,504 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction16p · 2 filings · 6 docs
Floor 2Under Construction14p · 2 filings · 6 docs
Floor 1Under Construction14p · 2 filings · 6 docs
CellarUnder Construction16p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1025 41ST STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2025$1.4M—Private party → 1025 41ST STREET LLC$483/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC203/13/2026
PRAMODRAY SHAH, P.E.107/15/2025
MOHAMMAD AHEAD, PE105/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRS Consulting203/21/2026
BMG GROUP USA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIPLE J & R INCGeneral Contractor207/03/2026
M. FRIED STORE FIXTURES,General Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524103/13/2026
Building Lifecycle
All (45)Filed (4)Permit Issued (4)Signed Off (1)Violation (23)Inspection (6)Objection (6)Special Inspection (1)
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2026
Violation issued (ECB, open)
Construction
07/01/2026
Permit issued — General Construction
B01253570-I1-GC
05/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/01/2026
Permit issued — Plumbing
B01371420-I1-PL
05/01/2026
Violation issued (HPD, open)
A
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Plumbing
03/13/2026
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES
B01371420-I1
02/10/2026
Filed — Alteration
APPLICATION FILED TO PROPOSE INTERIOR RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. NO LOAD-BEARING WALLS SHALL BE REMOVED UNDER THIS TYPE OF WORK/APPLICATION
B01253570-S1
11/19/2025
Violation issued (HPD, open)
I
07/17/2025
Permit issued — General Construction
B01253570-I1-GC
07/15/2025
Filed — Alteration
APPLICATION FILED TO PROPOSE INTERIOR RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. NO LOAD-BEARING WALLS SHALL BE REMOVED UNDER THIS TYPE OF WORK/APPLICATION
B01253570-I1
07/14/2025
Signed off — Alteration
NEW CONCRETE SIDEWALK WITH CONCRETE CURB CUT
B01221088-I1
07/10/2025
Special inspection requirement — Final
PRAMODRAY SHAH
07/08/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/17/2025
Permit issued — Curb Cut
B01221088-I1-CC
06/06/2025
Violation issued (HPD, open)
A
05/19/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Scope
05/06/2025
Filed — Alteration
NEW CONCRETE SIDEWALK WITH CONCRETE CURB CUT
B01221088-I1
11/27/2024
Violation issued (HPD, open)
I
10/30/2024
Violation issued (ECB, closed)
Construction
04/08/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
03/20/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
I
02/18/2020
Violation issued (ECB, open)
Construction
10/28/2019
Violation issued (HPD, open)
I
10/12/2018
Violation issued (HPD, open)
I
11/16/2017
Violation issued (HPD, open)
I
11/02/2016
Violation issued (HPD, open)
I
10/06/2015
Violation issued (HPD, open)
I
02/06/2015
Violation issued (HPD, open)
I
04/11/1997
Violation issued (HPD, closed)
A
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRIPLE J & R INC07/01/2026
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN05/01/2026
DOB NOWGeneral ConstructionPermit IssuedTRIPLE J & R INC07/17/2025
DOB NOWCurb CutSigned-offM. FRIED STORE FIXTURES,06/17/2025
1 project · most recent 03/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/13/2026Permit IssuedPRIME PIPING & HEATING INGas, Water/Sanitary
1 project · most recent 06/18/2025
General Wiring
FiledStatusContractorScope
06/18/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/10/2025FinalPRAMODRAY SHAHprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01221088-I1Request digital key ↗
08/18/2026B01253570-I1Request digital key ↗
08/18/2026B01371420-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026B01371420-I1Open ↗
08/13/2026B01221088-I1Open ↗
08/13/2026B01253570-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01253570-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01253570-I1Open ↗