← Back
Two family brick
902 45 STREET
BROOKLYN · BIN 3136559
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6Zoning
2,720 sfGross Floor Area
2Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: 90245 LLC · 2,053 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 18 docs
Floor 1Under Construction6p · 1 filing · 18 docs
CellarUnder Construction6p · 1 filing · 18 docs
1 job · most recent 07/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/23/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
Building Lifecycle
All (26)Filed (4)Permit Issued (2)Violation (6)Inspection (1)Objection (2)Special Inspection (11)
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
08/10/2026
Special inspection requirement — Lighting controls
Jian Yang
08/10/2026
Special inspection requirement — Lighting in dwelling units
Jian Yang
08/10/2026
Special inspection requirement — Interior lighting power
Jian Yang
07/23/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 THRU 002 FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01357954-I1.
B01357954-P2
07/23/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 THRU 002 FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01357954-I1.
B01357954-P1
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
07/23/2026
Special inspection requirement — Maintenance information
Jian Yang
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
05/19/2026
Permit issued — Plumbing
B01357954-S1-PL
04/01/2026
Permit issued — General Construction
B01357954-I1-GC
03/26/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Cost
03/10/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 THRU 002 FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01357954-I1.
B01357954-S1
02/11/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 THRU 002 FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:B01357954-I1.
B01357954-I1
02/20/2010
Violation issued (ECB, open)
Construction
01/10/2009
Violation issued (ECB, closed)
Construction
07/23/2008
Violation issued (ECB, closed)
Unknown
02/27/2008
Violation issued (ECB, closed)
Construction
02/27/2008
Violation issued (ECB, open)
Construction
06/19/1996
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2026$1.9M—— → —$699/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC407/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376407/23/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.05/19/2026
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC04/01/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and JointsJian Yangspecial
08/10/2026Energy Code Compliance InspectionsJian Yangprogress
08/10/2026Lighting controlsJian Yangenergy_progress
08/10/2026Lighting in dwelling unitsJian Yangenergy_progress
08/10/2026Interior lighting powerJian Yangenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsJian Yangspecial
07/23/2026Energy Code Compliance InspectionsJian Yangprogress
07/23/2026Maintenance informationJian Yangenergy_progress
07/23/2026HVAC-R and service water heating system controlsJian Yangenergy_progress
07/23/2026HVAC-R and service water heating equipmentJian Yangenergy_progress
07/23/2026HVAC-R and service water piping design and insulationJian Yangenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01357954-P1Request digital key ↗
08/18/2026B01357954-I1Request digital key ↗
08/18/2026B01357954-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026B01357954-P1Open ↗
08/18/2026B01357954-S1Open ↗
08/18/2026B01357954-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026B01357954-P2Open ↗
08/31/2026B01357954-P2Open ↗
08/24/2026B01357954-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01357954-P2Open ↗
08/24/2026B01357954-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B01357954-P1Open ↗
08/18/2026B01357954-S1Open ↗
08/18/2026B01357954-I1Open ↗
Showing 3 of 4 on file for this type