← Back
Three families
347 65 STREET
BROOKLYN · BIN 3144155
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R5BZoning
2,080 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Sub-Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2025$1.3M—JOSEPH BUCCHIERI TRUST → Private party$625/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC411/13/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180411/13/2025
Building Lifecycle
All (66)Filed (4)Permit Issued (2)Signed Off (2)Violation (22)Inspection (6)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
12/23/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-S1
12/01/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-I1
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/19/2025
Violation issued (HPD, open)
I
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
11/17/2025
Special inspection requirement — Air barrier - visual inspection
YUK LAM
11/17/2025
Special inspection requirement — Maintenance information
YUK LAM
11/17/2025
Special inspection requirement — Interior lighting power
YUK LAM
11/17/2025
Special inspection requirement — Permanent certificate
YUK LAM
11/17/2025
Special inspection requirement — Fenestration areas
YUK LAM
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
11/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
11/17/2025
Special inspection requirement — Fenestration air leakage
YUK LAM
11/13/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-P2
11/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
10/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
10/24/2025
Special inspection requirement — Maintenance information
YUK LAM
10/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
10/24/2025
Special inspection requirement — Permanent certificate
YUK LAM
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
10/23/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-P1
10/23/2025
Special inspection requirement — Fenestration areas
YUK LAM
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
10/23/2025
Special inspection requirement — Maintenance information
YUK LAM
10/23/2025
Special inspection requirement — Permanent certificate
YUK LAM
10/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
10/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
10/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
10/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
10/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2025
Violation issued (ECB, closed)
Unknown
06/27/2025
Permit issued — General Construction
B01241533-I1-GC
06/26/2025
Permit issued — Plumbing
B01241533-S1-PL
06/18/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-S1
06/18/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT SUBCELLAR. GENERAL CONSTRUCTION WORK AND INSTALL A BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01241533-I1
04/08/2024
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
05/28/1996
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
10/23/1985
Violation issued (HPD, open)
B
10/23/1985
Violation issued (HPD, open)
B
03/14/1980
Violation issued (HPD, open)
B
03/14/1980
Violation issued (HPD, open)
A
03/14/1980
Violation issued (HPD, open)
A
03/14/1980
Violation issued (HPD, open)
A
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN06/27/2025
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO06/26/2025
1 project · most recent 08/08/2025
General Wiring
FiledStatusContractorScope
08/08/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
11/17/2025Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
11/17/2025Air barrier - visual inspectionYUK LAMenergy_progress
11/17/2025Maintenance informationYUK LAMenergy_progress
11/17/2025Interior lighting powerYUK LAMenergy_progress
11/17/2025Permanent certificateYUK LAMenergy_progress
11/17/2025Fenestration areasYUK LAMenergy_progress
11/17/2025Fire-Resistant Penetrations and JointsYUK LAMspecial
11/17/2025Structural Stability – Alterations of existing buildingsYUK LAMspecial
11/17/2025Energy Code Compliance InspectionsYUK LAMprogress
11/17/2025Fire-Resistance Rated ConstructionYUK LAMprogress
11/17/2025Fenestration air leakageYUK LAMenergy_progress
10/24/2025Fire-Resistant Penetrations and JointsYUK LAMspecial
10/24/2025HVAC-R and service water heating equipmentYUK LAMenergy_progress
10/24/2025Maintenance informationYUK LAMenergy_progress
10/24/2025HVAC-R and service water heating system controlsYUK LAMenergy_progress
10/24/2025Permanent certificateYUK LAMenergy_progress
10/24/2025HVAC-R and service water piping design and insulationYUK LAMenergy_progress
10/24/2025Energy Code Compliance InspectionsYUK LAMprogress
10/23/2025Fenestration areasYUK LAMenergy_progress
10/23/2025Fire-Resistant Penetrations and JointsYUK LAMspecial
10/23/2025Energy Code Compliance InspectionsYUK LAMprogress
10/23/2025Maintenance informationYUK LAMenergy_progress
10/23/2025Permanent certificateYUK LAMenergy_progress
10/23/2025HVAC-R and service water heating equipmentYUK LAMenergy_progress
10/23/2025HVAC-R and service water heating system controlsYUK LAMenergy_progress
Latest 25 of 36.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01241533-S1Request digital key ↗
08/20/2026B01241533-I1Request digital key ↗
08/20/2026B01241533-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B01241533-I1Open ↗
08/29/2026B01241533-I1Open ↗
08/28/2026B01241533-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01241533-S1Open ↗
08/20/2026B01241533-I1Open ↗
08/20/2026B01241533-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B01241533-I1Open ↗
08/28/2026B01241533-P2Open ↗
08/25/2026B01241533-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01241533-S1Open ↗
08/20/2026B01241533-I1Open ↗
08/20/2026B01241533-P2Open ↗
Showing 3 of 4 on file for this type