← Back
One story retail building
1526 70 STREET
BROOKLYN · BIN 3157168
💬 Discuss this project
1975Year Built
1Stories
K1Building Class
R5Zoning
21,425 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: PICK QUICK FOODS INC · 28,030 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 2 filings · 20 docs
Floor 1Under Construction20p · 1 filing · 20 docs
CellarUnder Construction36p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1403/21/2026
J SIBAJA KITCHEN VENTILATION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FUSHION NYC CORPGeneral Contractor407/08/2026
J. SIBAJA KITCHEN AND VE*General Contractor104/09/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613605/14/2026
CHONG ENGINEERING P.C.7411212/05/2025
Building Lifecycle
All (83)Filed (10)Permit Issued (6)Signed Off (1)Violation (1)Inspection (2)Objection (63)
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/22/2026
Objection raised — Other
05/22/2026
Objection raised — Other
05/22/2026
Objection raised — Other
05/14/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS AND ALTERATIONS TO EXISTING GROCERY STORE INCLUDING NEW STOREFRONT. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01246825-P2
05/14/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS AND ALTERATIONS TO EXISTING GROCERY STORE INCLUDING NEW STOREFRONT. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01246825-P1
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/28/2026
Permit issued — Foundation
B01246825-S4-FO
04/28/2026
Permit issued — Structural
B01246825-S3-ST
04/22/2026
Permit issued — Plumbing
B01246825-S2-PL
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
03/31/2026
Permit issued — Mechanical Systems
B01246825-S1-MS
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/06/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Energy
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Structural
02/12/2026
Objection raised — Structural
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/06/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS AND ALTERATIONS TO EXISTING GROCERY STORE INCLUDING NEW STOREFRONT. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01246825-S4
02/06/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS AND ALTERATIONS TO EXISTING GROCERY STORE INCLUDING NEW STOREFRONT. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01246825-S3
01/09/2026
Permit issued — General Construction
B01246825-I1-GC
01/06/2026
Signed off — Alteration
Alteration of existing roof access structural members. Installation of new steel dunnage frame to support rooftop units. There is no change in occupancy, use or egress.
B01226838-I1
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Fire_Protection
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedFUSHION NYC CORP04/28/2026
DOB NOWStructuralPermit IssuedFUSHION NYC CORP04/28/2026
DOB NOWPlumbingPermit IssuedJUST PLBG & HTG INC04/22/2026
DOB NOWMechanical SystemsPermit IssuedJ. SIBAJA KITCHEN AND VE*03/31/2026
DOB NOWGeneral ConstructionPermit IssuedFUSHION NYC01/09/2026
DOB NOWStructuralSigned-offFUSHION NYC08/27/2025
BISPLISSUEDALCYONE PLBG. CO. INC12/06/1995
1 project · most recent 05/14/2026
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/14/2026Permit IssuedFUSHION NYC CORPHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Daikin ×4
Refrigeration
Daikin ×2
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026——145 heads
1 project · most recent 05/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2026Permit IssuedJUST PLBG & HTG INCGas, Water/Sanitary
4 projects · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026Permit IssuedFISHMAN ELECT. & SON CORPGeneral Wiring
01/16/2026CompleteFISHMAN ELECT. & SON CORP1 meters
01/16/2026CompleteFISHMAN ELECT. & SON CORP1 meters
01/16/2026CompleteFISHMAN ELECT. & SON CORPGeneral Wiring
1 project · most recent 05/14/2026
Steel Concrete Wood
FiledStatusContractorScope
05/14/2026Permit IssuedFUSHION NYC CORPSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/10/2026Subgrade InspectionsFran Huangspecial
06/10/2026FinalFran Huangprogress
06/10/2026Footing and FoundationFran Huangprogress
06/10/2026Concrete - Cast-In-PlaceFran Huangspecial
06/10/2026Subsurface Investigations (Borings/Test Pits)Fran Huangspecial
06/10/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
05/07/2026Construction Utilizing CLT or SCL, Type IVFran Huangspecial
05/07/2026Concrete - Cast-In-PlaceFran Huangspecial
05/07/2026Structural Steel - DetailsFran Huangspecial
05/07/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
05/07/2026Structural Cold-Formed SteelFran Huangspecial
05/07/2026FinalFran Huangprogress
05/07/2026Wood – Seismic Resistance—special
05/07/2026Structural Steel - WeldingFran Huangspecial
05/07/2026Structural Steel - High Strength BoltingFran Huangspecial
12/02/2025Chimneys and ventsTae Chongspecial
12/02/2025Fire-Resistant Penetrations and Joints—special
12/02/2025Post-installed Anchors—special
11/25/2025Post-installed AnchorsTae Chongspecial
11/25/2025HVAC-R and service water heating equipmentTae Chongenergy_progress
11/25/2025Duct leakage testing, insulation and designTae Chongenergy_progress
11/25/2025HVAC-R and service water piping design and insulationTae Chongenergy_progress
11/25/2025HVAC-R and service water heating system controlsTae Chongenergy_progress
11/25/2025Shutoff dampersTae Chongenergy_progress
11/25/2025Electrical motors and elevatorsTae Chongenergy_progress
Latest 25 of 39.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026B01226838-I1Request digital key ↗
08/21/2026B01226838-P1Request digital key ↗
08/17/2026B01246825-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B01246825-P1Open ↗
09/01/2026B01246825-P1Open ↗
09/01/2026B01246825-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026B01226838-P1Open ↗
08/21/2026B01226838-I1Open ↗
08/17/2026B01246825-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01246825-P1Open ↗
08/28/2026B01246825-I1Open ↗
08/28/2026B01246825-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/21/2026B01226838-I1Open ↗
08/21/2026B01226838-P1Open ↗
08/17/2026B01246825-P3Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026B01246825-P2Open ↗
08/14/2026B01246825-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B01246825-S4Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/17/2026B01246825-S3Open ↗