← Back
Three families
1178 71 STREET
BROOKLYN · BIN 3157557
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R5BZoning
3,480 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 2,550 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2025$1.8M—Private party → Private party$503/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC403/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180303/30/2026
Building Lifecycle
All (70)Filed (4)Permit Issued (2)Signed Off (2)Violation (17)Inspection (8)Objection (7)Special Inspection (30)
05/15/2026
Signed off — Alteration
SUBSEQUENT FILING PLUMBING WORK TO INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01315431-S1
05/01/2026
Violation issued (HPD, open)
A
04/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/14/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF CEL, 1ST AND 2ND FLOOR. REMOVE & INSTALL PARTITIONS, FLOOR, AND WINDOWS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01336254-I1
04/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/10/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
03/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
03/31/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
03/31/2026
Special inspection requirement — Fenestration areas
YUK LAM
03/31/2026
Special inspection requirement — Permanent certificate
YUK LAM
03/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
03/31/2026
Special inspection requirement — Air barrier - visual inspection
YUK LAM
03/31/2026
Special inspection requirement — Interior lighting power
YUK LAM
03/31/2026
Special inspection requirement — Maintenance information
YUK LAM
03/30/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CEL, 1ST AND 2ND FLOOR. REMOVE & INSTALL PARTITIONS, FLOOR, AND WINDOWS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01336254-P1
03/29/2026
Special inspection requirement — Interior lighting power
YUK LAM
03/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
03/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
03/29/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
03/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
03/29/2026
Special inspection requirement — Air barrier - visual inspection
YUK LAM
03/29/2026
Special inspection requirement — Maintenance information
YUK LAM
03/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
03/29/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
03/29/2026
Special inspection requirement — Permanent certificate
YUK LAM
03/29/2026
Special inspection requirement — Fenestration areas
YUK LAM
02/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2026
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
01/13/2026
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
01/05/2026
Objection raised — Plumbing
01/05/2026
Objection raised — Scope
01/05/2026
Objection raised — Structural
01/05/2026
Objection raised — Structural
01/05/2026
Objection raised — Zoning
12/29/2025
Permit issued — Plumbing
B01315431-S1-PL
12/24/2025
Permit issued — General Construction
B01336254-I1-GC
12/20/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CEL, 1ST AND 2ND FLOOR. REMOVE & INSTALL PARTITIONS, FLOOR, AND WINDOWS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01336254-I1
12/12/2025
Filed — Alteration
SUBSEQUENT FILING PLUMBING WORK TO INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01315431-S1
12/11/2025
Objection resolved — Addressed
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
11/26/2025
Special inspection requirement — Maintenance information
YUK LAM
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
11/26/2025
Special inspection requirement — Permanent certificate
YUK LAM
11/21/2025
Objection raised — Scope
11/20/2025
Violation issued (HPD, open)
I
11/09/2025
Filed — Alteration
SUBSEQUENT FILING PLUMBING WORK TO INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01315431-I1
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC12/29/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN12/24/2025
1 project · most recent 12/12/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/12/2025Signed-offS & L PLUMBING INCGas, Water/Sanitary
1 project · most recent 12/28/2025
General Wiring
FiledStatusContractorScope
12/28/2025CompleteCL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/29/2026Pass-Final PL - UndergroundPassView ↗
04/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Fail-Final Sign Permit InspectionFailView ↗
01/13/2026Fail-Final Sign Permit InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
03/31/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
03/31/2026Structural Stability – Alterations of existing buildingsYUK LAMspecial
03/31/2026Energy Code Compliance InspectionsYUK LAMprogress
03/31/2026Fire-Resistance Rated ConstructionYUK LAMprogress
03/31/2026Fenestration air leakageYUK LAMenergy_progress
03/31/2026Fenestration areasYUK LAMenergy_progress
03/31/2026Permanent certificateYUK LAMenergy_progress
03/31/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
03/31/2026Air barrier - visual inspectionYUK LAMenergy_progress
03/31/2026Interior lighting powerYUK LAMenergy_progress
03/31/2026Maintenance informationYUK LAMenergy_progress
03/29/2026Interior lighting powerYUK LAMenergy_progress
03/29/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
03/29/2026Structural Stability – Alterations of existing buildingsYUK LAMspecial
03/29/2026Energy Code Compliance InspectionsYUK LAMprogress
03/29/2026Fire-Resistance Rated ConstructionYUK LAMprogress
03/29/2026Air barrier - visual inspectionYUK LAMenergy_progress
03/29/2026Maintenance informationYUK LAMenergy_progress
03/29/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
03/29/2026Fenestration air leakageYUK LAMenergy_progress
03/29/2026Permanent certificateYUK LAMenergy_progress
03/29/2026Fenestration areasYUK LAMenergy_progress
11/26/2025HVAC-R and service water heating equipmentYUK LAMenergy_progress
11/26/2025HVAC-R and service water piping design and insulationYUK LAMenergy_progress
11/26/2025Maintenance informationYUK LAMenergy_progress
Latest 25 of 40.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01315431-S1Request digital key ↗
08/17/2026B01336254-I1Request digital key ↗
08/17/2026B01336254-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01336254-P1Open ↗
09/02/2026B01336254-P1Open ↗
08/27/2026B01315431-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01315431-S1Open ↗
08/19/2026B01315431-I1Open ↗
08/17/2026B01336254-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01336254-P1Open ↗
08/27/2026B01315431-S1Open ↗
08/26/2026B01336254-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01315431-S1Open ↗
08/17/2026B01336254-P1Open ↗
08/17/2026B01336254-I1Open ↗
Showing 3 of 4 on file for this type