← Back
Two family converted from one family
320 WALSH COURT
BROOKLYN · Flatbush (West)-Ditmas Park-Parkville · BIN 3170360
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5Zoning
1,120 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,165 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 16 docs
Floor 2Under Construction3p · 1 filing · 16 docs
Floor 1Under Construction3p · 1 filing · 16 docs
CellarUnder Construction3p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/03/2017$940K—Private party → Private party$839/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE210/21/2025
ZENITH HOME INSPECTIONS109/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDMUND S. JOSEPHGeneral Contractor104/08/2026
YAFE MEOD CORPGeneral Contractor107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818210/21/2025
Building Lifecycle
All (30)Filed (3)Permit Issued (3)Violation (3)Objection (14)Special Inspection (7)
04/24/2026
Permit issued — General Construction
B01305589-I1-GC
04/23/2026
Permit issued — Plumbing
B01305589-S1-PL
02/25/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Other
01/19/2026
Objection resolved — Addressed
01/19/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Admin
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/18/2025
Violation issued (ECB, open)
Construction
12/18/2025
Violation issued (ECB, open)
Construction
12/18/2025
Violation issued (ECB, open)
Construction
12/18/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Structural
11/18/2025
Objection raised — Structural
11/18/2025
Objection raised — Scope
11/18/2025
Objection raised — Other
11/18/2025
Objection raised — Admin
10/21/2025
Filed — Alteration
HEREWITH FILING FOR A SECOND FLOOR EXTENSION. FILING TO REMOVE EXISTING ROOF STRUCTURE AND REPLACE WITH LOW SLOPED FRAMED ROOF PATCH AND REPAIR ALL SURFACES AND FINISHES AS REQUIRED, NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01305589-S1
10/21/2025
Filed — Alteration
HEREWITH FILING FOR A SECOND FLOOR EXTENSION. FILING TO REMOVE EXISTING ROOF STRUCTURE AND REPLACE WITH LOW SLOPED FRAMED ROOF PATCH AND REPAIR ALL SURFACES AND FINISHES AS REQUIRED, NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01305589-I1
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
10/20/2025
Special inspection requirement — Final
ADITYA DESAI
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
NORMAN LOK
10/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
NORMAN LOK
10/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NORMAN LOK
10/20/2025
Special inspection requirement — Insulation placement and R values
NORMAN LOK
09/30/2025
Permit issued — Construction Fence
B01289893-I1-FN
09/23/2025
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE
B01289893-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP04/24/2026
DOB NOWPlumbingPermit IssuedKISHAN PLUMBING INC04/23/2026
DOB NOWConstruction FencePermit IssuedEDMUND S. JOSEPH09/30/2025
1 project · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 09/23/2025
Fence
FiledStatusContractorScope
09/23/2025Permit IssuedEDMUND S. JOSEPHFence
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/20/2025Fire-Resistant Penetrations and JointsNORMAN LOKspecial
10/20/2025Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
10/20/2025FinalADITYA DESAIprogress
10/20/2025Energy Code Compliance InspectionsNORMAN LOKprogress
10/20/2025Fire-Resistance Rated ConstructionNORMAN LOKprogress
10/20/2025Fenestration and door U-factor and product ratingsNORMAN LOKenergy_progress
10/20/2025Insulation placement and R valuesNORMAN LOKenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01289893-I1Request digital key ↗
08/20/2026B01305589-I1Request digital key ↗
08/20/2026B01305589-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01305589-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01305589-I1Open ↗
09/02/2026B01305589-I1Open ↗
09/02/2026B01305589-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01289893-I1Open ↗
08/13/2026B01305589-I1Open ↗
08/13/2026B01305589-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01305589-I1Open ↗
08/26/2026B01305589-S1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01305589-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01305589-I1Open ↗
08/13/2026B01305589-S1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01305589-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01305589-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01305589-I1Open ↗