← Back
Church, synagogue, chapel
Elyon College
1400 WEST 6 STREET · BIN 3173333
💬 Discuss this project
1958Year Built
2Stories
M1Building Class
R5BZoning
4,600 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Church, synagogue, chapel · 6,133 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT301/09/2025
JIMENEZ BUILDING CONSULTING LLC207/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE403/21/2026
ERETZ BUILDERS ASSISTANCE.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN POWER ELECT CONSElectrical103/22/2026
LINDNER, SHMUELElectrical103/21/2026
WINWAY DEVELOPMENT LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376207/19/2022
Building Lifecycle
All (36)Filed (5)Permit Issued (1)Signed Off (1)Violation (4)Inspection (1)Objection (6)Special Inspection (18)
01/21/2025
Special inspection requirement — Maintenance information
01/21/2025
Special inspection requirement — Exterior lighting power
01/21/2025
Special inspection requirement — Electrical motors and elevators
01/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/21/2025
Special inspection requirement — Lighting controls
01/21/2025
Special inspection requirement — Fenestration air leakage
01/21/2025
Special inspection requirement — Insulation placement and R values
01/21/2025
Special inspection requirement — Metering
01/21/2025
Special inspection requirement — Fenestration areas
01/21/2025
Special inspection requirement — Interior lighting power
01/21/2025
Special inspection requirement — Air barrier - visual inspection
01/21/2025
Special inspection requirement — Lighting in dwelling units
01/09/2025
Filed — Alteration
Plumbing work filed in conjunction with GC #B01068327-I1
B01164610-I1
01/09/2025
Filed — Alteration CO
INTERIOR RENOVATION TO ENLARGE MEZZANINE AND CONVERT BASEMENT TO A CELLAR
B01068327-P1
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/01/2024
Objection resolved — Addressed
09/30/2024
Objection raised — Other
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
08/23/2024
Objection raised — Accessibility
07/09/2024
Objection raised — Scope
07/04/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ENLARGE MEZZANINE AND CONVERT BASEMENT TO A CELLAR
B01068327-I1
03/24/2023
Violation issued (ECB, closed)
Unknown
08/31/2022
Signed off — Alteration
B00570776-I1
08/25/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2022
Filed — Alteration
B00570776-P1
07/19/2022
Special inspection requirement — Lighting controls
Jian Yang
07/19/2022
Special inspection requirement — Interior lighting power
Jian Yang
07/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
07/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/06/2021
Permit issued — General Construction
B00570776-I1-GC
08/05/2021
Filed — Alteration
B00570776-I1
03/29/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/1991
Violation issued (ECB, closed)
Public Assembly
10/05/1987
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC08/06/2021
BISMHISSUEDITY COOLING ENT.11/12/1999
1 project · most recent 01/09/2025
Water/Sanitary
FiledStatusContractorScope
01/09/2025——Water/Sanitary
3 projects · most recent 11/09/2023
General Wiring
FiledStatusContractorScope
11/09/2023Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
10/18/2023CompleteAMERICAN POWER ELECT CONS—
03/14/2023CompleteAMERICAN POWER ELECT CONS—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/25/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/21/2025Maintenance information—energy_progress
01/21/2025Exterior lighting power—energy_progress
01/21/2025Electrical motors and elevators—energy_progress
01/21/2025Fenestration and door U-factor and product ratings—energy_progress
01/21/2025Structural Stability – Alterations of existing buildings—special
01/21/2025Lighting controls—energy_progress
01/21/2025Fenestration air leakage—energy_progress
01/21/2025Insulation placement and R values—energy_progress
01/21/2025Metering—energy_progress
01/21/2025Fenestration areas—energy_progress
01/21/2025Interior lighting power—energy_progress
01/21/2025Air barrier - visual inspection—energy_progress
01/21/2025Lighting in dwelling units—energy_progress
01/09/2025Fire-Resistant Penetrations and Joints—special
07/19/2022Lighting controlsJian Yangenergy_progress
07/19/2022Interior lighting powerJian Yangenergy_progress
07/19/2022Energy Code Compliance InspectionsJian Yangprogress
07/19/2022Fire-Resistant Penetrations and JointsJian Yangspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00570776-P1Request digital key ↗
09/01/2026B00570776-I1Request digital key ↗
08/24/2026B01068327-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00570776-I1Open ↗
09/01/2026B00570776-P1Open ↗
08/24/2026B01068327-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00570776-P1Open ↗
08/26/2026B00570776-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00570776-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00570776-P1Open ↗
09/01/2026B00570776-I1Open ↗
08/24/2026B01068327-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00570776-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/01/2026B00570776-P1Open ↗
09/01/2026B00570776-I1Open ↗
08/13/2026B01164610-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/24/2026B01068327-P1Open ↗
08/24/2026B01068327-I1Open ↗