1931Year Built
3Stories
S9Building Class
R6AZoning
4,211 sfGross Floor Area
6Units
14 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 2,545 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof2p · 2 filings · 20 docs
Floor 33p · 2 filings · 12 docs
Floor 23p · 2 filings · 12 docs
Floor 1
Cellar5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE209/05/2022
POST & LINTEL306/07/2022
LIGHT HOUSE405/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SERVICE CORP703/21/2026
SERVICE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAMOUS RESTORATION INCGeneral Contractor707/08/2026
ALL PRO PLBG & HTG INCPlumbing407/08/2026
FOSTER ELECL SVC INC 000536General Contractor203/22/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659406/07/2022
LIGHTHOUSE5538204/18/2022
Building Lifecycle
All (86)Filed (9)Permit Issued (10)Signed Off (7)Violation (30)Inspection (7)Objection (14)Special Inspection (9)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2023
Signed off — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-S2
10/03/2022
Signed off — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-I1
09/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2022
Permit issued — Plumbing
B00668139-S2-PL
09/05/2022
Filed — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-S2
08/25/2022
Signed off — Alteration
INTERIOR RENOVATION AS PER PLAN NO CHANGE OF USE EGRESS AND EXIT.
B00585186-I1
06/27/2022
Signed off — Alteration
1. EXISTING PLUMBINGFIXTURE WATER CLOSET(01),BATHTUB (01),WASH BASIN(01) & KITCHEN SINK (01) WILLBE REPLACED IN THE 2NDFLOOR & 3RD FLOOR. AS PER PLAN. 2. REPLACE EXISTING GAS STOVE IN THE 2ND AND 3RD FLOOR IN THE KITCHEN ON EXISTING ROUGHING.
B00585187-I1
06/21/2022
Signed off — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-S1
06/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/07/2022
Filed — Alteration
1. EXISTING PLUMBINGFIXTURE WATER CLOSET(01),BATHTUB (01),WASH BASIN(01) & KITCHEN SINK (01) WILLBE REPLACED IN THE 2NDFLOOR & 3RD FLOOR. AS PER PLAN. 2. REPLACE EXISTING GAS STOVE IN THE 2ND AND 3RD FLOOR IN THE KITCHEN ON EXISTING ROUGHING.
B00585187-P1
06/04/2022
Permit issued — Boiler Equipment
B00668139-S1-BE
06/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
06/02/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMIR ABDALLA
05/24/2022
Filed — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-S1
05/08/2022
Special inspection requirement — Maintenance information
SAMIR ABDALLA
05/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMIR ABDALLA
05/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMIR ABDALLA
05/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
05/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMIR ABDALLA
05/04/2022
Objection resolved — Addressed
04/22/2022
Objection raised — Scope
04/18/2022
Filed — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-P1
04/11/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/04/2022
Signed off — Alteration
REPLACE AND SISTER OF EXISTING JOIST AT CELLAR FLOOR, 1ST AND 2ND FLOOR ROOF AS PER PLAN
B00627256-I1
04/04/2022
Signed off — Alteration
B00592215-I1
03/04/2022
Permit issued — Boiler Equipment
B00668139-I1-BE
03/02/2022
Permit issued — Boiler Equipment
B00668139-I1-BE
02/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2022
Filed — Alteration
THIS IS TO ADD 2 BOILERS AS PER DOB INSPECTOR COMMENTS FOR ADMINISTRATIVE PROCEDURE TO SIGN OFF PURPOSE ONLY. NO ACTUAL WORK REQUIRED. WORK COMPLETED UNDER B00668139-I1
B00668139-I1
12/03/2021
Permit issued — Plumbing
B00585187-I1-PL
11/29/2021
Permit issued — Structural
B00627256-I1-ST
11/16/2021
Objection raised — Admin
11/16/2021
Objection resolved — Addressed
11/16/2021
Objection raised — Scope
11/16/2021
Objection resolved — Addressed
11/16/2021
Objection raised — Structural
11/16/2021
Objection resolved — Addressed
11/16/2021
Objection raised — Scope
11/16/2021
Objection resolved — Addressed
11/16/2021
Objection raised — Scope
11/16/2021
Objection resolved — Addressed
11/16/2021
Objection raised — Zoning
11/16/2021
Objection resolved — Addressed
11/09/2021
Filed — Alteration
REPLACE AND SISTER OF EXISTING JOIST AT CELLAR FLOOR, 1ST AND 2ND FLOOR ROOF AS PER PLAN
B00627256-I1
11/08/2021
Special inspection requirement — Wood – Prefabricated I-Joists
ALBERTO ROMAN
11/08/2021
Special inspection requirement — Final
SAMIR ABDALLA
09/29/2021
Permit issued — General Construction
B00585186-I1-GC
09/29/2021
Permit issued — Structural
B00592215-I1-ST
09/15/2021
Permit issued — Structural
B00592215-I1-ST
09/12/2021
Filed — Alteration
B00592215-I1
09/07/2021
Permit issued — General Construction
B00585186-I1-GC
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC09/09/2022
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC06/04/2022
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC03/04/2022
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN03/02/2022
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN12/03/2021
DOB NOWStructuralSigned-offSE ENERGY11/29/2021
DOB NOWGeneral ConstructionSigned-offSE ENERGY09/29/2021
DOB NOWStructuralSigned-offSE ENERGY09/29/2021
DOB NOWStructuralSigned-offSE ENERGY09/15/2021
DOB NOWGeneral ConstructionSigned-offSE ENERGY09/07/2021
BIS—ISSUEDMANHATTAN EXTERIORS INC05/07/2015
BISEQISSUEDMANHATTAN EXTERIORS INC05/07/2015
BIS—ISSUEDMANHATTAN EXTERIORS INC07/20/2012
BIS—ISSUEDMANHATTAN EXTERIORS INC07/20/2012
BISEQISSUEDMANHATTAN EXTERIORS INC07/20/2012
1 project · most recent 07/02/2022
General Wiring
FiledStatusContractorScope
07/02/2022CompleteFOSTER ELEC'L SVC., INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/11/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/02/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
06/02/2022Energy Code Compliance InspectionsSAMIR ABDALLAprogress
05/08/2022Maintenance informationSAMIR ABDALLAenergy_progress
05/08/2022HVAC-R and service water heating equipmentSAMIR ABDALLAenergy_progress
05/08/2022HVAC-R and service water piping design and insulationSAMIR ABDALLAenergy_progress
05/08/2022Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
05/08/2022HVAC-R and service water heating system controlsSAMIR ABDALLAenergy_progress
11/08/2021Wood – Prefabricated I-JoistsALBERTO ROMANspecial
11/08/2021FinalSAMIR ABDALLAprogress
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00585187-I1Request digital key ↗
09/01/2026B00585187-P1Request digital key ↗
09/01/2026B00585186-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
05/20/2016320283527Open ↗
12/22/2015320283527Open ↗
09/15/2015320283527Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
05/12/2015320283527Open ↗
05/12/2015320283527Open ↗
07/23/2012320283527Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/16/2016320283527Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZoning Diagram (ZD1)2
08/02/2011320283527Open ↗
08/02/2011320283527Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/17/2017320283527Open ↗
▸BISZONING DIAGRAM1
08/02/2011320283527Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00585187-P1Open ↗
09/01/2026B00585187-I1Open ↗
09/01/2026B00585186-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B00668139-I1Open ↗
09/23/2026B00668139-I1Open ↗
09/23/2026B00668139-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/24/2017320283527Open ↗
04/24/2017320283527Open ↗
08/05/2011320283527Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00668139-I1Open ↗
09/01/2026B00585187-P1Open ↗
08/30/2026B00627256-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/22/2015320283527Open ↗
12/01/2015320283527Open ↗
09/15/2015320283527Open ↗
▸BISSCHEDULE B - PLUMBING1
03/11/2011320283527Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
03/11/2011320283527Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00592215-I1Open ↗
08/31/2026B00668139-I1Open ↗
08/31/2026B00668139-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00585187-P1Open ↗
09/01/2026B00585187-I1Open ↗
09/01/2026B00585186-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/24/2017320283527Open ↗
04/24/2017320283527Open ↗
04/24/2017320283527Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00585186-I1Open ↗
08/31/2026B00668139-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/15/2011320283527Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/24/2017320283527Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/05/2011320283527Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/18/2017320283527Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/05/2011320283527Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
12/22/2015320283527Open ↗
12/01/2015320283527Open ↗
12/01/2015320283527Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/25/2017320283527Open ↗
05/17/2017320283527Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/11/2011320283527Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
04/24/2017320283527Open ↗
03/11/2011320283527Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/12/2015320283527Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
04/18/2017320283527Open ↗
01/22/2016320283527Open ↗
01/22/2016320283527Open ↗
▸BISEFILING COVER SHEET1
03/11/2011320283527Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/17/2017320283527Open ↗