← Back
Miscellaneous religious facility
118 CONKLIN AVENUE
BROOKLYN · BIN 3229630
💬 Discuss this project
1925Year Built
2Stories
M9Building Class
R4-1Zoning
2,650 sfGross Floor Area
1Units
0 Open Violations
Miscellaneous religious facility · Owner of record: CANARSIE CHURCH OF CHRIST INC. · 2,650 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 7 docs
Floor 2Under Construction8p · 1 filing · 13 docs
Floor 1Under Construction3p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANARSIE CHURCH OF CHRIST INC.709/18/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS108/03/2026
MOHAMMAD AHEAD, PE207/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPITOL CONTRACTING LLCGeneral Contractor409/18/2026
ALL PRO PLBG & HTG INCPlumbing108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOHAMMAD AHEAD - PROFESSI9286107/14/2026
Building Lifecycle
All (21)Filed (3)Permit Issued (5)Violation (5)Special Inspection (8)
09/17/2026
Permit issued — General Construction
B01425953-I1-GC
09/17/2026
Permit issued — General Construction
B01424406-I1-GC
08/27/2026
Permit issued — General Construction
B01424406-I1-GC
08/27/2026
Permit issued — General Construction
B01425953-I1-GC
08/25/2026
Permit issued — Plumbing
B01424406-S1-PL
08/03/2026
Filed — Alteration
1. REPLACE EXISTING SIDING WITH NEW FROM 2ND FLOOR TO ROOF AT EXPOSURE #2=312 SF 2. REPAIR & REPLACE THE EXISTING ROOF COVERING AT UPPER ROOF AS PER PLAN =1882 SF 3. REPLACE THE EXISTING FRONT DOOR AT BUILDING AT FRONT FACADE IN KIND =1 NOS
B01425953-I1
07/14/2026
Filed — Alteration
1. REPLACE SHEET ROCK CEILING IN THE 1ST FLOOR.2. REPLACE SHEET ROCK IN THE ALL WALLS AND CEILING IN THE 2ND FLOOR.3. REPLACE FLOOR TILES IN THE 2ND FLOOR4. REPLACE EXISTING DOOR =4 NOS5. REPLACE EXISTING WINDOWS =5 NOS
B01424406-S1
07/14/2026
Filed — Alteration
1. REPLACE SHEET ROCK CEILING IN THE 1ST FLOOR.2. REPLACE SHEET ROCK IN THE ALL WALLS AND CEILING IN THE 2ND FLOOR.3. REPLACE FLOOR TILES IN THE 2ND FLOOR4. REPLACE EXISTING DOOR =4 NOS5. REPLACE EXISTING WINDOWS =5 NOS
B01424406-I1
07/02/2026
Special inspection requirement — Final
ADITYA DESAI
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
ADITYA DESAI
07/02/2026
Special inspection requirement — Insulation placement and R values
ADITYA DESAI
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD AHEAD
06/30/2026
Special inspection requirement — Final
ADITYA DESAI
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD AHEAD
06/30/2026
Special inspection requirement — Lighting in dwelling units
MOHAMMAD AHEAD
06/30/2026
Special inspection requirement — Fenestration areas
MOHAMMAD AHEAD
03/16/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCAPITOL CONTRACTING LLC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedCAPITOL CONTRACTING LLC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedCAPITOL CONTRACTING LLC08/27/2026
DOB NOWGeneral ConstructionPermit IssuedCAPITOL CONTRACTING LLC08/27/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC08/25/2026
1 project · most recent 07/14/2026
Water/Sanitary
FiledStatusContractorScope
07/14/2026Permit IssuedALL PRO PLBG & HTG INCWater/Sanitary
1 project · most recent 09/12/2026
FiledStatusContractorScope
09/12/2026Permit IssuedAGIR ELEC'L LTD. D/B/A—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/02/2026FinalADITYA DESAIprogress
07/02/2026Energy Code Compliance InspectionsADITYA DESAIprogress
07/02/2026Insulation placement and R valuesADITYA DESAIenergy_progress
06/30/2026Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
06/30/2026FinalADITYA DESAIprogress
06/30/2026Energy Code Compliance InspectionsMOHAMMAD AHEADprogress
06/30/2026Lighting in dwelling unitsMOHAMMAD AHEADenergy_progress
06/30/2026Fenestration areasMOHAMMAD AHEADenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026B01424406-I1Request digital key ↗
08/16/2026B01424406-S1Request digital key ↗
08/16/2026B01425953-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B01424406-I1Open ↗
08/31/2026B01424406-I1Open ↗
08/31/2026B01424406-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01424406-I1Open ↗
08/16/2026B01424406-S1Open ↗
08/16/2026B01425953-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01424406-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026B01424406-S1Open ↗
08/16/2026B01424406-I1Open ↗
08/16/2026B01425953-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026B01424406-S1Open ↗
08/16/2026B01424406-I1Open ↗
08/16/2026B01425953-I1Open ↗