ECB12/26/2025AT TIME OF INSPECTION OBSERVED, STRUCTURAL WORK DONE AT CELLAR LEVEL. JACK POST/SHORING, COLD FORM STEEL MEMBERS, CONCRETE, AND REBAR HAVE BEEN INSTALLED. ADDITIONAL, SHORING IS LAYING OUTSIDE. WORK HAS CREATED$2K due
ECB12/24/2025AT TIME OF INSPECTION OBSERVED, NEW PLUMBING WORK DONE AT CELLAR FLOOR. NEW OPEN COPPER PIPES, SUB PUMP, WATER HEATER, AND PVC WERE NOTICED INSTALLED. PLUMBING WORK HAS YET TO BE COMPLETED AS PIPES INSTALLED HA$2K due
DOB12/24/2025AT TIME OF INSPECTION, OBSERVED UNPERMITTED STRUCTURAL WORK TAKING PLACE IN CELLAR. CELLAR WAS TO OBSERVE FOR NEW FOUNDATION. FULL VACATE TO BE ISSUED FOR POTENTIAL COMPROMISED STRUCTURE.
DOB12/24/2025AT TIME OF INSPECTION, OBSERVED UNPERMITTED STRUCTURAL WORK TAKING PLACE IN CELLAR. CELLAR WAS TO OBSERVE FOR NEW FOUNDATION, EARTHWORK, AND STRUCTURAL. ENGINEER'S REPORT REQUIRED WITHIN 5 DAYS
ECB12/24/2025AT TIME OF INSPECTION, OBSERVED FOUNDATION WORK DONE AT CELLAR LEVEL. CURRENT (NEW)FOUNDATION LEVEL IS NOW ~2' DUG DOWN FROM PREVIOUS FLOOR LEVEL. HAZARD CREATED AS NO APPROVAL FOR WORK WAS DONE WHICH IS JEOPAR$2K due