← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
110 HOYT STREET
BROOKLYN · BIN 3325948
💬 Discuss this project
1900Year Built
4Stories
R6Building Class
R6AZoning
4,004 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 1,823 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralLandscape
Roof3p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARCELLO FERRI ARCHITECT607/27/2025
BARRY STRUCTURAL ENGINEERING, PLLC210/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ART - TECH CONSTR CORPGeneral Contractor303/21/2026
R&R CONTRACTING MGMT CORPGeneral Contractor303/21/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423607/27/2025
BARRY STRUCTURAL ENGINEER749210/18/2024
Building Lifecycle
All (18)Filed (8)Permit Issued (3)Signed Off (3)Violation (4)
08/25/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-I1
08/25/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-S1
07/27/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-P5
07/27/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-P4
07/10/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-S3
04/08/2025
Permit issued — Structural
B00970457-S3-ST
10/18/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-P3
08/19/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-P2
06/27/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-P1
05/06/2024
Permit issued — Plumbing
B00970457-S1-PL
03/18/2024
Permit issued — General Construction
B00970457-I1-GC
02/03/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-S3
12/22/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-I1
12/22/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT 2. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTIVE 14/75.
B00970457-S1
10/30/2019
Violation issued (HPD, closed)
I
10/11/2017
Violation issued (ECB, closed)
Construction
10/09/2015
Violation issued (HPD, closed)
I
12/09/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offR&R CONTRACTING MGMT CORP04/08/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/06/2024
DOB NOWGeneral ConstructionSigned-offART - TECH CONSTR CORP03/18/2024
BISOTISSUEDBURDA CONSTRUCTION CORP10/04/2017
BISEQISSUEDBURDA CONSTRUCTION CORP09/05/2017
BISOTISSUEDBURDA CONSTRUCTION CORP09/05/2017
BISOTISSUEDBURDA CONSTRUCTION CORP03/09/2017
BISEQISSUEDBURDA CONSTRUCTION CORP02/22/2017
BISPLISSUEDDOB05/05/1994
3 projects · most recent 04/30/2024
General Wiring
FiledStatusContractorScope
04/30/2024CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
07/31/2019CompleteANTONIO CERIELLO ELEC INC—
07/31/2019CompleteANTONIO CERIELLO ELEC INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/04/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/04/2025FinalMARCELLO FERRIprogress
08/04/2025Lighting in dwelling unitsMARCELLO FERRIenergy_progress
08/04/2025Insulation placement and R valuesMARCELLO FERRIenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
07/25/2025Insulation placement and R valuesMARCELLO FERRIenergy_progress
07/25/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
07/25/2025FinalMARCELLO FERRIprogress
07/25/2025Lighting in dwelling unitsMARCELLO FERRIenergy_progress
10/25/2024Wood – Seismic ResistanceMICHAEL BARRYspecial
10/25/2024Structural Steel - DetailsMICHAEL BARRYspecial
10/25/2024Structural Steel - High Strength BoltingMICHAEL BARRYspecial
10/25/2024FinalMICHAEL BARRYprogress
10/25/2024Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
10/15/2024Structural Steel - High Strength BoltingMICHAEL BARRYspecial
10/15/2024Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
10/15/2024Structural Steel - DetailsMICHAEL BARRYspecial
10/15/2024Wood – Seismic Resistance—special
10/15/2024FinalMICHAEL BARRYprogress
06/26/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
06/26/2024FinalMARCELLO FERRIprogress
06/26/2024Insulation placement and R valuesMARCELLO FERRIenergy_progress
06/26/2024Lighting in dwelling unitsMARCELLO FERRIenergy_progress
06/26/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B00970457-P4Request digital key ↗
08/21/2026B00970457-S1Request digital key ↗
08/21/2026B00970457-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
10/04/2017340498474Open ↗
09/13/2017340467444Open ↗
09/13/2017340467444Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/09/2019321991859Open ↗
05/14/2019321991859Open ↗
05/08/2017340498474Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/17/2017340498474Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING APPEAL1
07/09/2019321991859Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/09/2019321991859Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00970457-P1Open ↗
08/28/2026B00970457-P3Open ↗
08/28/2026B00970457-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00970457-P1Open ↗
09/01/2026B00970457-P1Open ↗
09/01/2026B00970457-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B00970457-P4Open ↗
08/21/2026B00970457-P3Open ↗
08/21/2026B00970457-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/08/2017340498474Open ↗
01/31/2017340467444Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/08/2017340498474Open ↗
01/31/2017340467444Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/08/2017340498474Open ↗
01/31/2017340467444Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/22/2020340498474Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
07/18/2017340498474Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/18/2017340498474Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B00970457-P4Open ↗
08/21/2026B00970457-S1Open ↗
08/21/2026B00970457-P5Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/08/2017340498474Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/18/2017340498474Open ↗
07/18/2017340498474Open ↗
05/08/2017340498474Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/08/2017340498474Open ↗
01/31/2017340467444Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/22/2020340498474Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/22/2020340498474Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/18/2017340498474Open ↗
07/18/2017340498474Open ↗
05/08/2017340498474Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/18/2017340498474Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/31/2020340498474Open ↗
02/25/2020340498474Open ↗
02/22/2020340498474Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
02/25/2020340498474Open ↗
02/22/2020340498474Open ↗
05/08/2017340498474Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
03/31/2020340498474Open ↗
02/25/2020340498474Open ↗
02/22/2020340498474Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/08/2017340498474Open ↗
01/31/2017340467444Open ↗
▸BISADDITIONAL INFORMATION1
07/18/2017340498474Open ↗
▸BISEFILING COVER SHEET1
05/14/2019321991859Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
07/09/2019321991859Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/09/2019321991859Open ↗