← Back
City university
CUNY SC > BKC_408_Brooklyn College
2895 BEDFORD AVENUE · BIN 3327319
💬 Discuss this project
1900Year Built
5Stories
W5Building Class
R6Zoning
1,073,920 sfGross Floor Area
3Units
LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
City university · 720,000 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
Structural
Floor 41p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY507/08/2026
HARRY CONSTRUCTION GROUP407/08/2026
DORMITORY AUTHORITY-STATE OF NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADS ENGINEERS112/17/2025
SUPERSTRUCTURES ENG. + ARCH.107/22/2025
ASR ENGINEERING PC107/29/2024
RAMBOLL102/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
METROPOLIS GROUP INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC US, INCGeneral Contractor907/08/2026
HARRY CONSTRUCTION GROUPGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983112/17/2025
FUTURE TECH CONSULTANTS O589107/22/2025
TECTONIC ENGINEERING CONS106102/01/2022
Building Lifecycle
All (20)Filed (4)Permit Issued (9)Signed Off (3)Violation (2)Special Inspection (2)
12/17/2025
Filed — Alteration
EXETENSION OF EXISTING STANDPIPE RISERS AND PROVISION OF NEW FHV STATION AND 3 WAY MANFOLD.
B01271813-I1
09/05/2025
Signed off — Alteration
Work includes per the filed plans remove/replace cracked masonry, replace sealant joints, repoint mortar joints, crack repair, spall repair.
B01256830-I1
09/03/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01087301-I1
08/26/2025
Permit issued — General Construction
B01256830-I1-GC
07/22/2025
Filed — Alteration
Work includes per the filed plans remove/replace cracked masonry, replace sealant joints, repoint mortar joints, crack repair, spall repair.
B01256830-I1
07/16/2025
Special inspection requirement — Post-installed Anchors
MARISA HARTE
07/16/2025
Special inspection requirement — Final
Paul Millman
07/01/2025
Permit issued — Sidewalk Shed
B01087301-I1-SH
06/05/2025
Signed off — Alteration
B00641350-I1
03/20/2025
Violation issued (FDNY_ORDER, closed)
03/20/2025
Violation issued (FDNY_ORDER, closed)
07/29/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01087301-I1
07/29/2024
Permit issued — Sidewalk Shed
B01087301-I1-SH
06/26/2024
Permit issued — Mechanical Systems
B00641350-I1-GC
06/26/2024
Permit issued — General Construction
B00641350-I1-GC
07/25/2023
Permit issued — General Construction
B00641350-I1-GC
07/25/2023
Permit issued — Mechanical Systems
B00641350-I1-MS
08/24/2022
Permit issued — Mechanical Systems
B00641350-I1-GC
08/24/2022
Permit issued — Mechanical Systems
B00641350-I1-MS
02/01/2022
Filed — Alteration
B00641350-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHARRY CONSTRUCTION GROUP08/26/2025
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/01/2025
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP07/29/2024
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC06/26/2024
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC06/26/2024
DOB NOWGeneral ConstructionSigned-offDYNAMIC US, INC07/25/2023
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC07/25/2023
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC08/24/2022
DOB NOWMechanical SystemsSigned-offDYNAMIC US, INC08/24/2022
BISOTISSUEDHERITAGE ARCHITECTURE01/09/2018
BISMHISSUEDSAM'S AIRCONDITIONING INC05/14/2012
BISOTISSUEDJAMES MCCULLAUGH OF NY INC06/05/2007
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025——2 outlets
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025———
1 project · most recent 01/27/2025
FiledStatusContractorScope
01/27/2025Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/16/2025Post-installed AnchorsMARISA HARTEspecial
07/16/2025FinalPaul Millmanprogress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00641350-I1Request digital key ↗
08/24/2026B01087301-I1Request digital key ↗
08/21/2026B01256830-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
01/10/2018321703135Open ↗
05/15/2012320474713Open ↗
09/05/2008310053492Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/02/2018321703135Open ↗
05/09/2012320474713Open ↗
▸BISPLACE OF ASSEMBLY1
01/14/2019321843047Open ↗
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/27/2019321843047Open ↗
12/04/2012320474713Open ↗
05/09/2012320474713Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00641350-I1Open ↗
08/24/2026B01087301-I1Open ↗
08/13/2026B01256830-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
10/26/2007310053492Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B01256830-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01256830-I1Open ↗
▸Trade Schedules & Equipment3
▸BISBOILERS - SUPPORTING DOCUMENTATION1
01/10/2018321703135Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/04/2012320474713Open ↗
▸BISEQUIPMENT USE PERMITS1
12/04/2012320474713Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00641350-I1Open ↗
08/13/2026B01256830-I1Open ↗
08/13/2026B01271813-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/26/2007310053492Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY1
05/09/2012320474713Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/04/2012320474713Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/04/2012320474713Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/31/2026B00641350-I1Open ↗
08/13/2026B01087301-I1Open ↗
08/13/2026B01271813-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/09/2012320474713Open ↗
10/26/2007310053492Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/04/2012320474713Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
12/04/2012320474713Open ↗
05/09/2012320474713Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/10/2018321703135Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/02/2018321703135Open ↗
05/09/2012320474713Open ↗
▸Other Documents1
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
01/02/2018321703135Open ↗