| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 1 | 08/20/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 2 | 03/20/2026 |
| D&B ENGINEERS AND ARCHITECTS | 2 | 03/17/2026 |
| NV/DESIGN.ARCHITECTURE PLLC | 1 | 08/21/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| KELLY CONSTRUCTION CO INC | General Contractor | 3 | 06/23/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 1 | 08/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ANZ CONSULTING ENGINEERIN | 3946 | 2 | 03/20/2026 |
| SOCOTEC ENGINEERING | 4983 | 2 | 03/17/2026 |
| NVDESIGN.ARCHITECTURE PLL | 4608 | 1 | 08/21/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PHOENIX SUTTON STR INC | 08/20/2026 |
| DOB NOW | Foundation | Permit Issued | KELLY CONSTRUCTION CO INC | 05/28/2026 |
| DOB NOW | Structural | Permit Issued | KELLY CONSTRUCTION CO INC | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | KELLY CONSTRUCTION CO INC | 03/06/2026 |
| BIS | PL | ISSUED | DONATO INC | 03/16/2010 |
| BIS | PL | ISSUED | DONATO INC | 02/17/2009 |
| BIS | MH | ISSUED | WINDSOR GENERAL CONSTRUCTION COR | 07/21/2004 |
| BIS | MH | ISSUED | WINDSOR GENERAL CONSTRUCTION COR | 03/03/2004 |
| BIS | — | ISSUED | WINDSOR GENERAL CONSTRUCTION | 07/17/2001 |
| BIS | PL | ISSUED | MICHAEL DONAHUE CORP | 08/10/2000 |
| BIS | — | ISSUED | WINDSOR GENERAL CONSTRUCTION | 04/12/2000 |
| BIS | PL | ISSUED | SAMCO MECH | 05/06/1999 |
| BIS | — | ISSUED | SAMCO MECHANICAL CORP | 04/30/1999 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/20/2026 | Permit Issued | KELLY CONSTRUCTION CO INC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Condensing Unit ×2 MXZ-SM60NL 60,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/20/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/28/2026 | Permit Issued | PHONG ELECTRIC INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/20/2026 | Permit Issued | KELLY CONSTRUCTION CO INC | Steel, Concrete, Masonry, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/18/2026 | Concrete - Cast-In-Place | ALEXIS SCHLESSINGERMAN | special |
| 02/18/2026 | Subgrade Inspections | ALEXIS SCHLESSINGERMAN | special |
| 02/18/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 02/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 02/17/2026 | Footing and Foundation | ALEXIS SCHLESSINGERMAN | progress |
| 02/11/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Construction Utilizing CLT or SCL, Type IV | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Structural Cold-Formed Steel | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Masonry | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 02/11/2026 | Structural Wood Frame | ALEXIS SCHLESSINGERMAN | progress |
| 02/11/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 12/23/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 12/23/2025 | Energy Code Compliance Inspections | ALBERT ZIRINO | progress |
| 12/23/2025 | HVAC-R and service water piping design and insulation | ALBERT ZIRINO | energy_progress |
| 12/23/2025 | HVAC-R and service water heating system controls | ALBERT ZIRINO | energy_progress |
| 12/23/2025 | HVAC-R and service water heating equipment | ALBERT ZIRINO | energy_progress |
| 12/23/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 12/23/2025 | Maintenance information | — | energy_progress |
| 12/23/2025 | Shutoff dampers | — | energy_progress |
| 12/23/2025 | Energy Code Compliance Inspections | ALBERT ZIRINO | progress |
| 12/21/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/21/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 12/21/2025 | HVAC-R and service water heating equipment | — | energy_progress |