DOB07/20/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321807826 ON 7/19/22 DUE TO CONSTRUCTION SUPERINTENDENT .WITHDRAWAL.
DOB07/20/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER .APPLICATION #321807826 ON 7/19/22 DUE TO CONSTRUCTION SUPERINTENDENT .WITHDRAWAL.
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/20/2020FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.AT THE TIME OF MY INSPECTION I OBSERVED MATERIALS AND EQUIPMENT STORED ON THE LOW EXISTING ROOF AT EXP.2.THE PARAPET WALL WAS T-1$5K due
ECB03/20/2020BC 3309.10 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES,DURING CONSTRUCTION OR DEMOLITION OPERATIONS.AT THE TIME OF MY INSPECTION I OBSERVED A STEEL ERECTION(2 STORY)WITH A CONCRETE SLAB.THERE$2K due
ECB03/20/2020FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33.AT THE TIME OF MY INSPECTION I OBSERVED TENANTS OCCUPYING THE BUILDING UPON MY REQUEST FOR OCCUPANT PROTECTION PLAN THAT DOCUMENTS WAS NOT AV$2K due
ECB03/20/2020FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.AT THE TIME OF MY INSPECTION I OBSERVED TENANT OCCUPYING THE BUILDING AT THE GF LEVEL AND COMPETENT PERSON,ARCHITECT "HELPER" AND$5K due
ECB03/20/2020FAILURE TO SAFEGUARD ALL PERSON AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-GUARDRAILS.AT THE TIME OF MY INSPECTION I OBSERVED GUARDRAILS INSTALLED AT THE PERMIMETERS AT THE 2ND AND 3RD STORY LEVELS THE GU$25K due