← Back
Miscellaneous warehouse
611 MANHATTAN AVENUE
BROOKLYN · BIN 3338026
💬 Discuss this project
1931Year Built
2Stories
E9Building Class
M1-2/R6Zoning
13,450 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous warehouse · Owner of record: MC CARREN REALTY CORP · 7,500 sf lot · 1.79 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MCCARREN REALTY503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEEL CORE ENGINEERING PLLC208/14/2024
PHILIP TOSCANO ARCHITECTS606/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
BOXWOOD CONSTRUCTION LLCGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIP TOSCANO, ARCHITECT2474606/13/2024
Building Lifecycle
All (68)Filed (8)Permit Issued (3)Signed Off (2)Violation (2)Inspection (5)Objection (18)Special Inspection (30)
12/05/2024
Signed off — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-S2
11/13/2024
Permit issued — Mechanical Systems
B00891032-S2-MS
08/14/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-P4
08/14/2024
Special inspection requirement — Final
CHRISTINA TOSCANO
08/14/2024
Special inspection requirement — Shutoff dampers
PHILIP TOSCANO
08/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
PHILIP TOSCANO
08/14/2024
Special inspection requirement — Maintenance information
PHILIP TOSCANO
08/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
08/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
PHILIP TOSCANO
08/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
08/14/2024
Special inspection requirement — Heating Systems
PHILIP TOSCANO
08/14/2024
Special inspection requirement — Mechanical Systems
PHILIP TOSCANO
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2024
Special inspection requirement — Heating Systems
07/30/2024
Special inspection requirement — Mechanical Systems
07/30/2024
Special inspection requirement — Final
07/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/30/2024
Special inspection requirement — Maintenance information
07/30/2024
Special inspection requirement — Shutoff dampers
07/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2024
Signed off — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-I1
06/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/13/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-P3
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
06/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Interior lighting power
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Lighting controls
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
06/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
06/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILIP TOSCANO
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
05/31/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/30/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-P2
05/16/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-P1
04/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2024
Permit issued — Plumbing
B00891032-S3-PL
03/15/2024
Permit issued — General Construction
B00891032-I1-GC
03/04/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-S2
03/04/2024
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH A1 TO RENOVATE PART OF FIRST FLOOR FOR MANUFACTURING FOOD PRODUCTS, USE GROUP 17B. WITH WORK TO INCLUDE REMOVAL OF EX. PARTITION, NEW PARTITIONS, NEW LIGHTING, PATCH, FIRE STOP AND PAINT CEILING & WALLS.
B00891032-S3
02/26/2024
Objection resolved — Addressed
02/09/2024
Objection raised — Other
11/07/2023
Objection resolved — Addressed
08/21/2023
Filed — Alteration CO
B00919632-I1
08/21/2023
Objection resolved — Addressed
08/01/2023
Objection raised — Admin
07/06/2023
Objection resolved — Addressed
07/06/2023
Objection resolved — Addressed
07/05/2023
Objection raised — Scope
07/05/2023
Objection resolved — Addressed
07/05/2023
Objection raised — Scope
07/05/2023
Objection raised — Scope
07/05/2023
Objection resolved — Addressed
07/05/2023
Objection raised — Inspections
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBOXWOOD CONSTRUCTION LLC11/13/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC04/04/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC03/15/2024
BISOTISSUEDGRT CONST OF NY CORP12/11/2013
BIS—ISSUEDPHILIP TOSCANO08/21/2002
BIS—ISSUEDMCCARREN REALTY CORP10/09/2001
BISOTISSUEDPHILIP TOSCANO06/16/2000
1 project · most recent 08/14/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2024Signed-offBOXWOOD CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-55MES-230VO 57,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 08/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/14/2024Signed-offXH&RC PLBG AND HTG INCGas, Water/Sanitary
1 project · most recent 06/10/2024
General Wiring
FiledStatusContractorScope
06/10/2024CompletePOWER FULL ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/31/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/14/2024FinalCHRISTINA TOSCANOprogress
08/14/2024Shutoff dampersPHILIP TOSCANOenergy_progress
08/14/2024HVAC-R and service water heating system controlsPHILIP TOSCANOenergy_progress
08/14/2024Maintenance informationPHILIP TOSCANOenergy_progress
08/14/2024HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
08/14/2024HVAC-R and service water heating equipmentPHILIP TOSCANOenergy_progress
08/14/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
08/14/2024Heating SystemsPHILIP TOSCANOspecial
08/14/2024Mechanical SystemsPHILIP TOSCANOspecial
07/30/2024Fire-Resistant Penetrations and Joints—special
07/30/2024Heating Systems—special
07/30/2024Mechanical Systems—special
07/30/2024Final—progress
07/30/2024HVAC-R and service water heating system controls—energy_progress
07/30/2024HVAC-R and service water piping design and insulation—energy_progress
07/30/2024Maintenance information—energy_progress
07/30/2024Shutoff dampers—energy_progress
07/30/2024HVAC-R and service water heating equipment—energy_progress
06/13/2024Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
06/13/2024Energy Code Compliance InspectionsPHILIP TOSCANOprogress
06/13/2024HVAC-R and service water piping design and insulationPHILIP TOSCANOenergy_progress
06/12/2024Interior lighting powerPHILIP TOSCANOenergy_progress
06/12/2024Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
06/12/2024Energy Code Compliance InspectionsPHILIP TOSCANOprogress
06/12/2024Lighting controlsPHILIP TOSCANOenergy_progress
Latest 25 of 37.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00891032-S2Request digital key ↗
08/27/2026B00891032-P4Request digital key ↗
08/27/2026B00891032-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
08/16/2022301226554Open ↗
12/10/2013340105433Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026B00891032-I1Open ↗
08/13/2026B00891032-P2Open ↗
▸BISWORK PERMIT APPLICATION1
12/10/2013340105433Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00919632-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00891032-S2Open ↗
09/01/2026B00891032-S2Open ↗
09/01/2026B00891032-S3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00891032-S1Open ↗
08/27/2026B00891032-S2Open ↗
08/27/2026B00891032-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00891032-S2Open ↗
09/01/2026B00891032-S3Open ↗
08/29/2026B00891032-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
05/20/2014340105433Open ↗
12/10/2013340105433Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/10/2013340105433Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2013340105433Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/10/2013340105433Open ↗
▸Safety & Tenant Protection5
▸DOB NOWCertificate of No Harassment3
08/13/2026B00891032-P2Open ↗
08/13/2026B00891032-I1Open ↗
08/13/2026B00919632-I1Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
12/10/2013340105433Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00919632-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00891032-S1Open ↗
08/27/2026B00891032-P4Open ↗
08/27/2026B00891032-P3Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/10/2013340105433Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/10/2013340105433Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/20/2014340105433Open ↗
▸BISEN2 - As Built Energy Analysis1
05/20/2014340105433Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/10/2013340105433Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00891032-S3Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/10/2013340105433Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
05/20/2014340105433Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/20/2014340105433Open ↗
12/10/2013340105433Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/10/2013340105433Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/27/2026B00919632-I1Open ↗