DOB07/31/2025AT TIME OF INSPECTION OBSERVED ALL FLOOR JOISTS REMOVED AND ARE IN PROCESS OF BEING REPLACED, ALSO LOAD BEARING WALLS REMOVED WHICH WILL AFFECT STRUCTURAL STABILITY.
ECB07/31/2025AT TIME OF INSPECTION OBSERVED CONSTRUCTION TAKING PLACE IN A B1- 2 FAMILY DWELLING, FLOOR JOIST AT FLOOR LEVEL 1 BEING INSTALLED (2X8 PINE WOOD) APPROX 15 JOISTS ALREADY INSTALLED, WORK IS IN PRELIMINARY STAGE$2K due
ECB07/31/2025AT TIME OF INSPECTION OBSERVED DEMOLITION TAKING PLACE IN A B1- 2 FAMILY DWELLING, FLOOR JOIST AT FLOOR LEVEL 1 REMOVED, LOAD BEARING WALLS REMOVED AS WELL AS CEILING.(FULL GUTTED DEMO).WORK IS APPROX 30% COMPL$5K due
ECB07/31/2025AT TIME OF INSPECTION OBSERVED PLUMBING WORK TAKING PLACE IN A B1- 2 FAMILY DWELLING, ALL EXISTING PLUMBING FOR KITCHEN AND BATHROOM WERE REMOVED TO FACILITATE DEMOLITION. SEVERAL EXISTING PIPES WERE ALSO CUT A$2K due
DOB07/31/2025AT TIME OF INSPECTION OBSERVED UNPERMITTED/UNDOCUMENTED WORK TO INTERIOR JOISTS AND COLUMNS WERE CUT AND REMOVED MAKING STRUCTURE UNSAFE. FULL VACATE ISSUED.
ECB07/31/2025AT TIME OF INSPECTION OBSERVED EXCESSIVE DEBRIS AT REAR OF PROPERTY AT EXPOSURE 3, LARGE QUALITY OF DAMAGE WOOD WAS DUMPED AT REAR YARD TO FACILITATE ON GOING DEMOLITION WORKS., REPAIR AND/REPLACE$2K due
ECB07/31/2025AT TIME OF INSPECTION OBSERVED ELECTRICAL WORK TAKING PLACE IN A B1- 2 FAMILY DWELLING, EXISTING BX CABLES WERE EITHER REMOVED OR CUT TO FACILITATE DEMOLITION AND RENOVATION. EXPOSED MAIN BREAKER PANEL BOX CANHearing held — result not yet published