← Back
Primarily 2 family with 1 store or office
575 WOODWARD AVENUE
QUEENS · BIN 4080893
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R6BZoning
3,460 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: WHITE HORSE CAPITAL LP IC LLC · 2,000 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction3p · 2 filings · 20 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1
CellarUnder Construction3p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DESIGN BUILD REALTY LLC203/22/2026
WHITE HORSE CAPITAL LP IC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2023$900K—DESIGNBUILD REALTY LLC → WHITE HORSE CAPITAL LP IC LLC$260/sf building
06/30/2014$970K—— → —$280/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC408/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing208/07/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376408/04/2026
Building Lifecycle
All (46)Filed (4)Permit Issued (3)Violation (11)Inspection (2)Special Inspection (26)
08/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/07/2026
Special inspection requirement — Maintenance information
Jian Yang
08/06/2026
Permit issued — Boiler Equipment
Q01425280-I1-BE
08/04/2026
Filed — Alteration
INSTALL NEW (1) GAS COMBI BOILER AT 2ND FLOOR, NEW (1) COMBI BOILER AT 3RD FLOOR. BOILER WORK AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01425280-I1
08/04/2026
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON CELLAR, 2ND FLOOR & 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. EXISTING BOILER ID #: 40000059379N0001 TO BE CAPPED AND REMOVED. GC FILE UNDER DOB NOW JOB# Q01392777-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01392777-P1
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
07/27/2026
Special inspection requirement — Maintenance information
Jian Yang
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
07/09/2026
Special inspection requirement — Heating Systems
Jian Yang
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
07/01/2026
Special inspection requirement — Maintenance information
Jian Yang
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
06/08/2026
Permit issued — Plumbing
Q01392777-S1-PL
06/02/2026
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON CELLAR, 2ND FLOOR & 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. EXISTING BOILER ID #: 40000059379N0001 TO BE CAPPED AND REMOVED. GC FILE UNDER DOB NOW JOB# Q01392777-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01392777-S1
06/01/2026
Permit issued — General Construction
Q01392777-I1-GC
04/27/2026
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON CELLAR, 2ND FLOOR & 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. EXISTING BOILER ID #: 40000059379N0001 TO BE CAPPED AND REMOVED. GC FILE UNDER DOB NOW JOB# Q01392777-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01392777-I1
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/24/2026
Special inspection requirement — Maintenance information
Jian Yang
04/24/2026
Special inspection requirement — Interior lighting power
Jian Yang
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
11/25/2025
Violation issued (HPD, closed)
I
11/18/2025
Violation issued (HPD, closed)
C
11/18/2025
Violation issued (HPD, closed)
C
12/04/2024
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2018
Violation issued (ECB, closed)
Construction
02/26/2018
Violation issued (ECB, closed)
Construction
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/1999
Violation issued (ECB, closed)
Boilers
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedCATMAN PLUMBING INC08/06/2026
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC06/01/2026
1 project · most recent 08/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 11/14/2019
General Wiring
FiledStatusContractorScope
11/14/2019CompleteGEMINI ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/07/2026HVAC-R and service water piping design and insulationJian Yangenergy_progress
08/07/2026HVAC-R and service water heating system controlsJian Yangenergy_progress
08/07/2026HVAC-R and service water heating equipmentJian Yangenergy_progress
08/07/2026Energy Code Compliance InspectionsJian Yangprogress
08/07/2026Fire-Resistant Penetrations and JointsJian Yangspecial
08/07/2026Maintenance informationJian Yangenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsJian Yangspecial
07/27/2026Energy Code Compliance InspectionsJian Yangprogress
07/27/2026HVAC-R and service water piping design and insulationJian Yangenergy_progress
07/27/2026Maintenance informationJian Yangenergy_progress
07/27/2026HVAC-R and service water heating equipmentJian Yangenergy_progress
07/27/2026HVAC-R and service water heating system controlsJian Yangenergy_progress
07/09/2026Heating SystemsJian Yangspecial
07/01/2026Fire-Resistant Penetrations and JointsJian Yangspecial
07/01/2026Maintenance informationJian Yangenergy_progress
07/01/2026HVAC-R and service water heating equipmentJian Yangenergy_progress
07/01/2026HVAC-R and service water piping design and insulationJian Yangenergy_progress
07/01/2026HVAC-R and service water heating system controlsJian Yangenergy_progress
04/24/2026HVAC-R and service water heating system controlsJian Yangenergy_progress
04/24/2026HVAC-R and service water heating equipmentJian Yangenergy_progress
04/24/2026Maintenance informationJian Yangenergy_progress
04/24/2026Interior lighting powerJian Yangenergy_progress
04/24/2026HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/24/2026Fire-Resistance Rated ConstructionJian Yangprogress
04/24/2026Energy Code Compliance InspectionsJian Yangprogress
Latest 25 of 26.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01392777-P1Request digital key ↗
08/17/2026Q01392777-I1Request digital key ↗
08/17/2026Q01392777-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01425280-I1Open ↗
09/01/2026Q01392777-I1Open ↗
09/01/2026Q01392777-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01392777-I1Open ↗
08/17/2026Q01392777-S1Open ↗
08/17/2026Q01392777-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01425280-I1Open ↗
09/01/2026Q01392777-I1Open ↗
08/26/2026Q01392777-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01392777-I1Open ↗
08/17/2026Q01392777-S1Open ↗
08/17/2026Q01392777-P1Open ↗
Showing 3 of 4 on file for this type