← Back
Two family converted from one family
62-01 68 AVENUE
QUEENS · Ridgewood · BIN 4087928
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R5BZoning
2,360 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof6p · 2 filings · 17 docs
Floor 215p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar12p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2022$1.2M—Private party → Private party$493/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC201/22/2026
RICHARD JIMENEZ ARCHITECTURE311/26/2025
MATTHEW RUOPOLI, AIA408/28/2025
ALNOUR CONSULTING101/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS203/21/2026
A&A BUILDING CONSULTANTS INC.603/21/2026
J. CALLAHAN CONSULTING, INC.303/21/2026
NH EXPEDITING AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGO MANAGEMENT USA INCGeneral Contractor607/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
HAPPY HOME LLCGeneral Contractor104/09/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244201/22/2026
METROSPEC SIA6420511/26/2025
ALNOUR CONSULTING ENGINEE607201/10/2024
Building Lifecycle
All (56)Filed (10)Permit Issued (8)Signed Off (3)Inspection (5)Special Inspection (30)
08/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2026
Signed off — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-S2
08/21/2026
Signed off — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-S1
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Permit issued — Mechanical Systems
Q00900218-S1-MS
02/20/2026
Special inspection requirement — Interior lighting power
Michael Risbergs
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Ruopoli
02/20/2026
Special inspection requirement — Final
Matthew Ruopoli
02/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Michael Risbergs
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
02/20/2026
Special inspection requirement — Fenestration air leakage
Michael Risbergs
02/20/2026
Special inspection requirement — Insulation placement and R values
Michael Risbergs
02/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Risbergs
02/20/2026
Special inspection requirement — Fenestration areas
Michael Risbergs
02/11/2026
Permit issued — General Construction
Q00900218-I1-GC
01/27/2026
Signed off — Alteration
Q01231793-I1
01/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/23/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/23/2026
Special inspection requirement — Final
NARESH MAHANGU
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/22/2026
Filed — Alteration
Q01231793-P1
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/20/2026
Special inspection requirement — Final
NARESH MAHANGU
01/20/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
11/26/2025
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-P3
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
11/21/2025
Permit issued — Plumbing
Q00900218-S2-PL
11/12/2025
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-S1
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
11/12/2025
Special inspection requirement — Maintenance information
JOSEPH YOUNG
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
11/12/2025
Special inspection requirement — Heating Systems
JOSEPH YOUNG
11/12/2025
Special inspection requirement — Permanent certificate
JOSEPH YOUNG
10/28/2025
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-S2
08/28/2025
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-P2
06/02/2025
Permit issued — Solar
Q01231793-I1-SL
05/29/2025
Filed — Alteration
Q01231793-I1
05/17/2025
Special inspection requirement — Fenestration air leakage
Michael Risbergs
05/17/2025
Special inspection requirement — Fenestration areas
Michael Risbergs
01/22/2025
Permit issued — General Construction
Q00900218-I1-GC
11/29/2024
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-P1
03/20/2024
Permit issued — Structural
Q00900223-I1-ST
02/15/2024
Permit issued — Structural
Q00900223-I1-ST
01/10/2024
Filed — Alteration
Q00900223-I1
10/12/2023
Filed — Alteration
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cassette units
Q00900218-I1
08/16/2023
Permit issued — General Construction
Q00896685-I1-GC
07/17/2023
Filed — Alteration
Q00896685-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHAPPY HOME LLC03/24/2026
DOB NOWGeneral ConstructionPermit IssuedRIGO MANAGEMENT USA INC02/11/2026
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP11/21/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/02/2025
DOB NOWGeneral ConstructionPermit IssuedRIGO MANAGEMENT USA INC01/22/2025
DOB NOWStructuralSigned-offRIGO MANAGEMENT USA INC03/20/2024
DOB NOWStructuralSigned-offRIGO MANAGEMENT USA INC02/15/2024
DOB NOWGeneral ConstructionPermit IssuedRIGO MANAGEMENT USA INC08/16/2023
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD06/07/2005
1 project · most recent 11/26/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Signed-offHAPPY HOME LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric 1‐Way Ceiling Cassette Indoor Unit For MXZ Multi‐Zone 7,200 BTU ×5
MITSUBISHI - SEZ-KD18NA SLIM DUCT UNIT 21,600 BTU · Ductwork ×2
MITSUBISHI 24K BTU - MXZ-3C24NAHZ 30,600 BTU · Heat Pump Outdoor ×2
MSZ-GS18NA WALL MOUNT 21,600 BTU · Fan Coil Indoor ×2
— MITSUBISHI 30K BTU - MXZ-3C30NAHZ 36,000 BTU ×2
1 project · most recent 11/26/2025
Water/Sanitary
FiledStatusContractorScope
11/26/2025Signed-offSIGNORE & SONS PLBG CORPWater/Sanitary
2 projects · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025CompleteBROOKYLN SOLARWORKS, LLC—
02/14/2025Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
02/20/2026Interior lighting powerMichael Risbergsenergy_progress
02/20/2026Energy Code Compliance InspectionsMatthew Ruopoliprogress
02/20/2026FinalMatthew Ruopoliprogress
02/20/2026Fire-Resistance Rated ConstructionMichael Risbergsprogress
02/20/2026Fire-Resistant Penetrations and JointsMichael Risbergsspecial
02/20/2026Fenestration air leakageMichael Risbergsenergy_progress
02/20/2026Insulation placement and R valuesMichael Risbergsenergy_progress
02/20/2026Fenestration and door U-factor and product ratingsMichael Risbergsenergy_progress
02/20/2026Fenestration areasMichael Risbergsenergy_progress
01/23/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/23/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
01/23/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/23/2026FinalNARESH MAHANGUprogress
01/23/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/20/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/20/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/20/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
01/20/2026FinalNARESH MAHANGUprogress
01/20/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
11/28/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
11/24/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
11/12/2025HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
11/12/2025HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
11/12/2025HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
11/12/2025Maintenance informationJOSEPH YOUNGenergy_progress
Latest 25 of 39.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026Q00896685-I1Request digital key ↗
08/23/2026Q00900223-I1Request digital key ↗
08/18/2026Q00900218-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
08/25/2026Q01231793-P1Open ↗
08/25/2026Q01231793-P1Open ↗
08/24/2026Q00900218-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026Q00896685-I1Open ↗
08/23/2026Q00900223-I1Open ↗
08/18/2026Q00900218-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00900218-P3Open ↗
08/25/2026Q01231793-P1Open ↗
08/24/2026Q00900218-S1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/24/2026Q00896685-I1Open ↗
08/23/2026Q00900223-I1Open ↗
08/18/2026Q00900218-P3Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01231793-I1Open ↗