← Back
Two family brick
150-01 61 ROAD
QUEENS · BIN 4141326
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R4Zoning
1,237 sfGross Floor Area
2Units
6 Open Violations 1 unresolved · 5 paperwork only ▸FDNY Report ↗
Two family brick · 2,080 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 6 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction15p · 1 filing · 20 docs
BasementUnder Construction15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LXC CONSTRUCTION703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2025$1.3M—Private party → Private party$1,051/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC608/08/2026
NKM ENGINEERING PLLC103/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor709/19/2026
KJK ELECTRIC INCElectrical103/22/2026
HYTECH SOLAR INCGeneral Contractor104/12/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180508/08/2026
NKM ENGINEERING PLLC6244103/17/2026
Building Lifecycle
All (74)Filed (7)Permit Issued (7)Violation (7)Inspection (5)Objection (18)Special Inspection (30)
09/18/2026
Permit issued — Mechanical Systems
Q01433231-I1-MS
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
08/11/2026
Special inspection requirement — Maintenance information
YUK LAM
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
08/11/2026
Special inspection requirement — Permanent certificate
YUK LAM
08/08/2026
Filed — Alteration CO
SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01237863-P3
08/07/2026
Filed — Alteration CO
SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01237863-P4
07/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
YUK LAM
07/16/2026
Special inspection requirement — Permanent certificate
YUK LAM
07/16/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
07/16/2026
Special inspection requirement — Structural Wood Frame
YUK LAM
07/16/2026
Special inspection requirement — Interior lighting power
YUK LAM
07/16/2026
Special inspection requirement — Metering
YUK LAM
07/16/2026
Special inspection requirement — Fenestration areas
YUK LAM
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
07/16/2026
Special inspection requirement — Structural Steel - Details
YUK LAM
07/16/2026
Special inspection requirement — Final
YUK LAM
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
07/16/2026
Special inspection requirement — Masonry
YUK LAM
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
07/16/2026
Special inspection requirement — Subgrade Inspections
YUK LAM
07/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/16/2026
Special inspection requirement — Concrete - Cast-In-Place
YUK LAM
07/16/2026
Special inspection requirement — Footing and Foundation
YUK LAM
07/16/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YUK LAM
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
07/16/2026
Special inspection requirement — Insulation placement and R values
YUK LAM
07/16/2026
Special inspection requirement — Air barrier - visual inspection
YUK LAM
07/16/2026
Special inspection requirement — Maintenance information
YUK LAM
06/05/2026
Permit issued — Structural
Q01237863-I1-GC-CX
06/01/2026
Permit issued — Construction Fence
Q01262108-I1-FN
04/10/2026
Permit issued — Solar
Q01368738-I1-SL
03/17/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01368738-I1
01/18/2026
Objection resolved — Addressed
01/09/2026
Objection raised — Admin
01/01/2026
Filed — Alteration CO
SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01237863-P2
12/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2025
Permit issued — Plumbing
Q01237863-S1-PL
12/01/2025
Violation issued (ECB, open)
Construction
12/01/2025
Violation issued (ECB, open)
Construction
12/01/2025
Violation issued (ECB, open)
Unknown
12/01/2025
Violation issued (ECB, open)
Construction
12/01/2025
Violation issued (ECB, open)
Unknown
12/01/2025
Violation issued (ECB, open)
Construction
10/29/2025
Violation issued (ECB, closed)
Construction
08/20/2025
Permit issued — Structural
Q01237863-I1-GC-CX
08/18/2025
Permit issued — Construction Fence
Q01262108-I1-FN
07/29/2025
Filed — Alteration
PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# Q01237863. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01262108-I1
07/29/2025
Filed — Alteration CO
SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01237863-S1
07/25/2025
Objection resolved — Addressed
07/21/2025
Objection raised — Energy
07/21/2025
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLXC CONSTRUCTION INC09/18/2026
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC06/05/2026
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC06/01/2026
DOB NOWSolarPermit IssuedHYTECH SOLAR04/10/2026
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/01/2025
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC08/20/2025
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC08/18/2025
1 project · most recent 08/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/08/2026Permit IssuedWATSON'S PLBG, HTG, & BDGGas, Storm, Water/Sanitary
2 projects · most recent 03/07/2026
General Wiring
FiledStatusContractorScope
03/07/2026Pending PaymentGMJ ELECTRIC CORP—
10/06/2025Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 project · most recent 08/08/2026
Masonry Wood
FiledStatusContractorScope
08/08/2026Permit IssuedLXC CONSTRUCTION INCMasonry, Wood
1 project · most recent 03/17/2026
FiledStatusContractorScope
03/17/2026Permit IssuedHYTECH SOLAR INC32 panels, 14.08 kw, 695 roof_area_sqft
1 project · most recent 07/29/2025
Fence
FiledStatusContractorScope
07/29/2025Signed-offLXC CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
08/11/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
08/11/2026Energy Code Compliance InspectionsYUK LAMprogress
08/11/2026HVAC-R and service water heating equipmentYUK LAMenergy_progress
08/11/2026HVAC-R and service water piping design and insulationYUK LAMenergy_progress
08/11/2026Maintenance informationYUK LAMenergy_progress
08/11/2026HVAC-R and service water heating system controlsYUK LAMenergy_progress
08/11/2026Permanent certificateYUK LAMenergy_progress
07/16/2026Air barrier - visual inspectionYUK LAMenergy_progress
07/16/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
07/16/2026MasonryYUK LAMspecial
07/16/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYUK LAMspecial
07/16/2026Structural Stability – Alterations of existing buildingsYUK LAMspecial
07/16/2026Structural Steel - DetailsYUK LAMspecial
07/16/2026Subgrade InspectionsYUK LAMspecial
07/16/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/16/2026Energy Code Compliance InspectionsYUK LAMprogress
07/16/2026FinalYUK LAMprogress
07/16/2026Fire-Resistance Rated ConstructionYUK LAMprogress
07/16/2026Footing and FoundationYUK LAMprogress
07/16/2026Structural Wood FrameYUK LAMprogress
07/16/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
07/16/2026Interior lighting powerYUK LAMenergy_progress
07/16/2026Permanent certificateYUK LAMenergy_progress
07/16/2026Insulation placement and R valuesYUK LAMenergy_progress
07/16/2026MeteringYUK LAMenergy_progress
Latest 25 of 65.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026Q01262108-I1Request digital key ↗
08/17/2026Q01237863-P3Request digital key ↗
08/17/2026Q01237863-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-P2Open ↗
08/13/2026Q01237863-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01237863-P2Open ↗
08/13/2026Q01237863-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q01237863-P4Open ↗
09/01/2026Q01237863-P4Open ↗
08/29/2026Q01237863-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026Q01237863-P3Open ↗
08/17/2026Q01237863-P4Open ↗
08/17/2026Q01368738-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01237863-P4Open ↗
08/29/2026Q01237863-S1Open ↗
08/29/2026Q01237863-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-I1Open ↗
08/13/2026Q01237863-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026Q01237863-P4Open ↗
08/17/2026Q01237863-P3Open ↗
08/17/2026Q01368738-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-I1Open ↗
08/13/2026Q01237863-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01237863-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01237863-I1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-I1Open ↗
08/13/2026Q01237863-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-P2Open ↗
08/13/2026Q01237863-I1Open ↗
▸DOB NOWPlot Diagram3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-I1Open ↗
08/13/2026Q01237863-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01237863-P3Open ↗
08/13/2026Q01237863-I1Open ↗
08/13/2026Q01237863-P2Open ↗