← Back
Two stories - detached, small or mid-size
58-48 208 STREET
QUEENS · BIN 4160587
💬 Discuss this project
1950Year Built
1Stories
A1Building Class
R2AZoning
2,234 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof9p · 3 filings · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar20p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TEAPE CONSTRUCTION SERVIC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EVAN CHAN ARCHITECT, PC610/15/2024
SQUARE ARCH, LLC107/17/2024
LAM ENGINEER PC201/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EVAN CHAN ARCHITECT P C203/21/2026
SOLOGISTICS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TEAPE CONSTRUCTION SERVICGeneral Contractor1907/08/2026
SUNATION SOLAR SYSTEMSGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180410/15/2024
SQ. ARCH, LLC4802107/17/2024
Building Lifecycle
All (72)Filed (9)Permit Issued (11)Signed Off (4)Violation (1)Inspection (9)Objection (8)Special Inspection (30)
10/23/2024
Special inspection requirement — Mechanical Systems
YUK LAM
10/23/2024
Special inspection requirement — Air barrier — testing
YUK LAM
10/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
10/23/2024
Special inspection requirement — Air barrier - visual inspection
YUK LAM
10/23/2024
Special inspection requirement — Electric vehicle service equipment requirements
YUK LAM
10/23/2024
Special inspection requirement — Insulation placement and R values
YUK LAM
10/23/2024
Special inspection requirement — Exterior lighting power
YUK LAM
10/23/2024
Special inspection requirement — Interior lighting power
YUK LAM
10/23/2024
Special inspection requirement — Lighting controls
YUK LAM
10/23/2024
Special inspection requirement — Lighting in dwelling units
Evan Chan
10/23/2024
Special inspection requirement — Fenestration areas
YUK LAM
10/23/2024
Special inspection requirement — Fenestration air leakage
YUK LAM
10/23/2024
Special inspection requirement — Permanent certificate
Evan Chan
10/23/2024
Special inspection requirement — Final
YUK LAM
10/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
10/15/2024
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT OF EXISTING 1 STORY AND CELLAR BUILDING. PROPOSED TOTAL 2 STORY BRICK AND FRAME BUILDING WITH 1 FAMILY DWELLING. OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q00539063-P2
10/11/2024
Special inspection requirement — Air barrier - visual inspection
YUK LAM
10/11/2024
Special inspection requirement — Mechanical Systems
YUK LAM
10/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
10/11/2024
Special inspection requirement — Final
YUK LAM
10/11/2024
Special inspection requirement — Fenestration air leakage
YUK LAM
10/11/2024
Special inspection requirement — Lighting in dwelling units
Evan Chan
10/11/2024
Special inspection requirement — Electric vehicle service equipment requirements
YUK LAM
10/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
10/11/2024
Special inspection requirement — Exterior lighting power
YUK LAM
10/11/2024
Special inspection requirement — Insulation placement and R values
YUK LAM
10/11/2024
Special inspection requirement — Lighting controls
YUK LAM
10/11/2024
Special inspection requirement — Interior lighting power
YUK LAM
10/11/2024
Special inspection requirement — Fenestration areas
YUK LAM
10/11/2024
Special inspection requirement — Air barrier — testing
YUK LAM
10/11/2024
Special inspection requirement — Permanent certificate
Evan Chan
10/02/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01081124-I1
07/26/2024
Permit issued — Solar
Q01081124-I1-SL
07/17/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01081124-I1
02/09/2024
Signed off — Alteration
PROPOSED FOUNDATION, STRUCTURAL, AND PARTIAL DEMOLITION WORK IN CONJUNCTION WITH JOB#Q00539063. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00602342-I1
02/08/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/19/2024
Signed off — Alteration
PLUMBING WORK FOR A PROPOSED VERTICAL ENLARGEMENT OF EXISTING 1 STORY AND CELLAR BUILDING. PROPOSED TOTAL 2 STORY BRICK AND FRAME BUILDING WITH 1 FAMILY DWELLING.
Q00558649-I1
01/19/2024
Signed off — Alteration
Q00685562-I1
01/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/09/2023
Objection resolved — Addressed
10/05/2023
Objection raised — Scope
10/05/2023
Objection resolved — Addressed
09/29/2023
Objection raised — Scope
09/26/2023
Filed — Alteration
PLUMBING WORK FOR A PROPOSED VERTICAL ENLARGEMENT OF EXISTING 1 STORY AND CELLAR BUILDING. PROPOSED TOTAL 2 STORY BRICK AND FRAME BUILDING WITH 1 FAMILY DWELLING.
Q00558649-P1
09/26/2023
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT OF EXISTING 1 STORY AND CELLAR BUILDING. PROPOSED TOTAL 2 STORY BRICK AND FRAME BUILDING WITH 1 FAMILY DWELLING. OBTAIN NEW CERTIFICATE OF OCCUPANCY
Q00539063-P1
09/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2023
Permit issued — General Construction
Q00539063-I1-GC-CX
03/14/2023
Permit issued — Construction Fence
Q00685562-I1-FN
03/14/2023
Permit issued — Foundation
Q00602342-I1-GC-CX
10/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2022
Permit issued — Plumbing
Q00558649-I1-PL
04/02/2022
Permit issued — General Construction
Q00539063-I1-GC-CX
04/02/2022
Permit issued — General Construction
Q00602342-I1-GC-CX
04/01/2022
Permit issued — Construction Fence
Q00685562-I1-FN
03/29/2022
Violation issued (ECB, closed)
Cranes and Derricks
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS07/26/2024
DOB NOWGeneral ConstructionPermit IssuedTEAPE CONSTRUCTION SERVIC03/14/2023
DOB NOWConstruction FenceSigned-offTEAPE CONSTRUCTION SERVIC03/14/2023
DOB NOWFoundationSigned-offTEAPE CONSTRUCTION SERVIC03/14/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT09/15/2022
DOB NOWGeneral ConstructionPermit IssuedTEAPE CONSTRUCTION SERVIC04/02/2022
DOB NOWGeneral ConstructionSigned-offTEAPE CONSTRUCTION SERVIC04/02/2022
DOB NOWConstruction FenceSigned-offTEAPE CONSTRUCTION SERVIC04/01/2022
DOB NOWMechanical SystemsPermit IssuedTEAPE CONSTRUCTION SERVIC02/25/2022
DOB NOWConstruction FenceSigned-offTEAPE CONSTRUCTION SERVIC02/24/2022
DOB NOWStructuralSigned-offTEAPE CONSTRUCTION SERVIC02/21/2022
1 job · most recent 10/15/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2024Permit IssuedTEAPE CONSTRUCTION SERVICAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-5C42NA3-U1 36,000 BTU · Condensing Unit ×4
MXZ-4C36NA3-U1 24,000 BTU · Condensing Unit ×2
PUZ-HA36NKA 36,000 BTU · Condensing Unit ×2
MXZ-3C24NAH72 24,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric MXZ-5C42NA3-U1 42,000 BTU · Condensing Unit ×4
MXZ-4C36NA3-U1 24,000 BTU · Condensing Unit ×2
PUZ-HA36NKA 42,000 BTU · Condensing Unit ×2
MXZ-3C24NAH72 24,000 BTU · Vrf Outdoor ×1
3 jobs · most recent 07/15/2024
General Wiring
FiledStatusContractorScope
07/15/2024CompleteGALLANT ELEC'L CONST, INC—
08/20/2023CompleteFRIED ELECTRIC CO.General Wiring
07/05/2022CancelledAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
10/23/2024Mechanical SystemsYUK LAMspecial
10/23/2024Air barrier — testing YUK LAMenergy_progress
10/23/2024Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
10/23/2024Air barrier - visual inspectionYUK LAMenergy_progress
10/23/2024Electric vehicle service equipment requirementsYUK LAMenergy_progress
10/23/2024Insulation placement and R valuesYUK LAMenergy_progress
10/23/2024Exterior lighting powerYUK LAMenergy_progress
10/23/2024Interior lighting powerYUK LAMenergy_progress
10/23/2024Lighting controlsYUK LAMenergy_progress
10/23/2024Lighting in dwelling unitsEvan Chanenergy_progress
10/23/2024Fenestration areasYUK LAMenergy_progress
10/23/2024Fenestration air leakageYUK LAMenergy_progress
10/23/2024Permanent certificateEvan Chanenergy_progress
10/23/2024FinalYUK LAMprogress
10/23/2024Structural Stability – Alterations of existing buildingsYUK LAMspecial
10/11/2024Air barrier - visual inspectionYUK LAMenergy_progress
10/11/2024Mechanical SystemsYUK LAMspecial
10/11/2024Structural Stability – Alterations of existing buildingsYUK LAMspecial
10/11/2024FinalYUK LAMprogress
10/11/2024Fenestration air leakageYUK LAMenergy_progress
10/11/2024Lighting in dwelling unitsEvan Chanenergy_progress
10/11/2024Electric vehicle service equipment requirementsYUK LAMenergy_progress
10/11/2024Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
10/11/2024Exterior lighting powerYUK LAMenergy_progress
10/11/2024Insulation placement and R valuesYUK LAMenergy_progress
Latest 25 of 51.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00602342-P1Request digital key ↗
08/27/2026Q00602342-I1Request digital key ↗
08/26/2026Q00685562-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00539063-P1Open ↗
08/13/2026Q00539063-P2Open ↗
08/13/2026Q00539063-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00539063-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00539063-I1Open ↗
09/01/2026Q00539063-I1Open ↗
09/01/2026Q00539063-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00602342-I1Open ↗
08/27/2026Q00602342-P1Open ↗
08/24/2026Q00539063-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00539063-I1Open ↗
08/31/2026Q01081124-I1Open ↗
08/31/2026Q01081124-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00539063-P2Open ↗
08/13/2026Q00539063-P1Open ↗
08/13/2026Q00539063-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00539063-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00539063-P2Open ↗
08/24/2026Q00539063-I1Open ↗
08/15/2026Q00539063-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00539063-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01081124-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00539063-P1Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram3
08/13/2026Q00539063-P2Open ↗
08/13/2026Q00539063-P1Open ↗
08/13/2026Q00539063-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00539063-I1Open ↗
08/13/2026Q00539063-P2Open ↗
08/13/2026Q00539063-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00539063-P1Open ↗
08/13/2026Q00539063-I1Open ↗
08/13/2026Q00539063-P2Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00602342-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00539063-I1Open ↗