| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 11/06/2013 | $758K | — | — → — | $552/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| FLUSHING ENGINEERING SERVICE PC | 4 | 03/26/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| GREENPOINT CONSTRUCTION C | General Contractor | 2 | 08/16/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| FLUSHING ENGINEERING SERV | 4373 | 2 | 03/26/2026 |
| PROFESSIONAL SOLUTIONS GR | 1756 | 1 | 03/26/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Foundation | Permit Issued | GREENPOINT CONSTRUCTION C | 08/14/2026 |
| DOB NOW | Construction Fence | Permit Issued | GREENPOINT CONSTRUCTION C | 07/27/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/26/2026 | Permit Issued | GREENPOINT CONSTRUCTION C | Heating and Air Conditioning Systems | Heat / Cool Daikin ×31 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2026 | Permit Issued | CL ELECTRICAL CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2026 | Permit Issued | GREENPOINT CONSTRUCTION C | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2026 | Permit Issued | GREENPOINT CONSTRUCTION C | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/31/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/31/2026 | Maintenance information | — | energy_progress |
| 05/31/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 03/24/2026 | Energy Code Compliance Inspections | — | progress |
| 03/24/2026 | HVAC-R and service water piping design and insulation | KY FU | energy_progress |
| 03/24/2026 | HVAC-R and service water heating system controls | KY FU | energy_progress |
| 03/24/2026 | HVAC-R and service water heating equipment | KY FU | energy_progress |
| 03/20/2026 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | SAMER ABOU-GHAIDA | special |
| 03/20/2026 | On-Site Private Sewage Disposal Systems Installation | — | special |
| 12/20/2025 | Electric vehicle service equipment requirements | KY FU | energy_progress |
| 11/10/2025 | Ventilation and air distribution system | KY FU | energy_progress |
| 11/10/2025 | HVAC-R and service water piping design and insulation | KY FU | energy_progress |
| 11/10/2025 | Structural Stability – Alterations of existing buildings | KY FU | special |
| 11/10/2025 | HVAC-R and service water heating equipment | KY FU | energy_progress |
| 11/10/2025 | HVAC-R and service water heating system controls | KY FU | energy_progress |
| 11/07/2025 | Subsurface Investigations (Borings/Test Pits) | SAMER ABOU-GHAIDA | special |
| 10/15/2025 | Mechanical Systems | KY FU | special |
| 10/15/2025 | Final | — | progress |
| 09/11/2025 | Interior lighting power | KY FU | energy_progress |
| 09/11/2025 | Structural Steel - Details | KY FU | special |
| 09/11/2025 | Metering | KY FU | energy_progress |
| 09/11/2025 | Permanent certificate | KY FU | energy_progress |
| 09/11/2025 | Fenestration and door U-factor and product ratings | KY FU | energy_progress |
| 09/11/2025 | Protection of exposed foundation insulation | KY FU | energy_progress |
| 09/11/2025 | Fenestration areas | KY FU | energy_progress |